IR 05000930/2010004

From kanterella
Jump to navigation Jump to search
Matl Control & Accounting Insp Rept 70-0371/85-14 on 850930-1004.No Noncompliance Noted.Major Areas Inspected: Measurement Control & Statistics
ML20198J075
Person / Time
Site: 07000371, 05000930
Issue date: 11/25/1985
From: David Jones, Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20198J068 List:
References
70-0371-85-14, 70-371-85-14, NUDOCS 8605300650
Download: ML20198J075 (4)


Text

_ _ .. . .. . . .

. _ , . , ,_

.

'

- s.n usce, W TEDSTATES o, NUCLEAR REGULATORY COMMISSION

  1. " 'd Ri!GtCN IQ j*

M. ,

'r 101 M AplETTA STREE'f, NW, ATLANTA, GEORGI A N*C3

ef .M....$ ,

l i

Report No.: 7C 371/85-14 ,

Docket No.: 70-371 i

,

License No.: 5NM-368

'

SAFEGUARDS GROUP: 1  ;

,

,

Licensee UNC Naval Products i

Division of UNC Resources. In ,

67 Sandy Desert Road Uncasville, Cor.necticut 06382 Facility Name: UNC Naval Products '

Inspection At: Uncasville, CT

.

'

I Inspection Conducted: September 30 - October 4, 1985 ,

!

Date of Last Material Control and Account 1 reg Inspection: June .10-14, 1935

Inspector: $S

,

D. Jones [iRegion[istician

_

'

.

/) 7htzu _ /d/

Date Signed'

Approved by:

R. dl. Keimig,

_ief, fn :I" eguards

__ Section,. _ _

// g@M Date Signed

, Division of tation afety and Safeguards '

.

Inspection Summary: Routine, Announced Material Control and Accountino Inspection on September 30 - October 4,1985, Repo'ri.[Nofl70-D1/85!14).

Areas Inspected: Measurement control and stat.istics. The inspection involved 32 inspector hours by one NRC inspecto i Results: The licensee was in compliance in the areas exanir:ed during thic

,

inspection.

, i

<

.

l

l

. \

l

-

'

l

8605300650 851202 PDR l ADOCK 07000371  :

C PDR l l

._. _ _ . . . .- !

. . . - . - . . __ _ _ _ _ _ _ _ _ _ _

.-

.

REPORT DETAILS

, Persons Contacted

'

Licensee Employees

  • T. Collopy, Manager, Nuclear Material Control
  • N. Grenon, Supervisor, Nuclear Material Control
  • Kelly, Statistical Specialist The inspector also interviewed other licensee personnel involved in the control and accounting of special nuclear material (SNM) and chemistr * Attended exit interview Exit Interview The inspector met with the licensee representatives (denoted in paragraph 1)

at the conclusion of the inspection on October 4,1985, and summarized the scope and findings of the inspection. At no time during this inspection was written material provided to the licensee by the inspecto . Followup on Inspector Identified Items and Unresolved Items (92701)

(Closed) Inspector Followup Item (85-08-01): Procedures not numbered or date During the inspection conducted on June 10-14, 1985 it was found that the licensee's written statistical procedures were not numbered or dated. During this inspection the procedures were reviewed and found to have been assigned numbers and dated. This item is close (0 pen) Inspector Followup Item (85-08-02): Data base for fuel vendors measurement uncertainties. As was indicated in inspection report 70-371/85-08, the licensee books his fuel vendor's measured valves for fuel receipts and therefore uses the fuel vendors measurement uncertainties in limit of error calculations. However, the uncertainties supplied to the licensee by the vendor were determined from data generated over three material balance periods rather than from one period. The vendor has agreed to supply the licensee with uncertainties determined from data generated during a single material balance period. The licensee indicated that as of the date of this inspection, no fuel, and, therefore, no error data had 'been received since the June 10-14, 1985 inspection. This item will remain open pending inspection of the error data supplied for the next fuel receip (0 pen) Inspector Followup Item (85-08-03): Updating of volume measurement uncertainties. During the inspection on June 10-14, 1985 it was noted that the licensee's FNMC Plan contained no commitment to update the error estimates associated with the volume measurements used to account for the SNM contained in element sections. NMSS has been requested to review this

,

matter. This item will remain open pending resolution by NMS l

-

l l

t

, , , -- - - , , . , . . - .-.

'

...

(Closed) Unresolved Item (85-08-04): Calculation of systematic error associ-ated with NDA measurements. During the inspection conducted on June 10-14, 1985, an attempt was made to verify the licensee's computer program used for calculating the systematic error associated with NDA measurements. The licensee was requested to enter the data from an example contained in a reference text. Since the results obtained by the licensee did not totally agree with the results delineated in the reference text, this issue was deemed unresolved pending demonstration by the licensee that appropriate statistical methods were being used. The licensee's followup actions were reviewed during this inspectio Further inspection revealed that the licensee's routine method of determining NDA systematic errors consisted of two phases. A regression analysis was first performed on the NDA systems measur: ment control data to obtain intermediite results. The intermediate results were then input to a computer to obtain the error estimate Documentation was reviewed which demonstrated that when the appropriate intermediate results, obtained by a regression analysis of the example raw data, were entered into the computer, the correct error estimates were produced. This item is close . Measurement Control and Statistics (85209) The licensee's calculations of the inventory difference (ID) and its associated limit of error (LEID) for the May 17 - July 19, 1985 material balance period were inspected. The inspection consisted of an audit of the material balance summary, a review of the written proce-dures for calculating the LEID, a review of the mathematical model of the LEID, and an examination of the coefficients used in the model to propagate measurement errors through the material balance statemen The material quantities of beginning inventory, receipts, shipments, ending inventory and their adjustments, as reported in the material balance summary, were compared to the licensee's official accounta-bility records and were substantiate The reported quantities of additions to material in process and removals from material in process appeared to have been overstated by approximately 13 %. This issue has been deemed an inspector followup item (85-14-01) and will remain open until an agreement is reached among the licensee, Region I and NMSS on the optimum method for computing these quantitie A review of the licensee's written procedure revealed that it contained a narrative description of the statistical calculation rather than the mathematical model and the equations used for calculating the LEI However, the actual calculations were being performed by use of a compute The licensee's calculations of the coefficients, i.e., the material quantities, used to propagate the measurement errors associated with fuel receipts, feed material, charges, sectioned elements and sludge were examined. The coefficient used for propagating the weighing error associated with fuel receipts was found to have been overstated by

= _ . . . . . .-_ . ., .. - ..- - ..

,

,

>

,

  • .

-

. ,

. .

'

i

i

,

,

approximately 27 kgs. (U). The coefficient used for propagating the -

weighing error associated with the charge scale was overstated by  !

approximately 62 kgs. (U). The coefficient used for propagating the '

weighing error associated with the fuel material scafie was goderstated '

. by approximately 62 kgs. (U). In that the coefficients were overstated .

for one of the scales and understated for another scale by a sfnitar ,

4 amount, and given that the magnitudes of the weighing errors are

, minimal, these discrepancies would have had a negligible impact on the .

reported LEI Therefore this matter has been deemed .an inspector '

followup item (85-14-02). .

J The licensee's statistical control program for monf,toring the quality .

of special nuclear material control and accounting measurements was

!

"

also inspected. The inspection consisted of an eraninstion of the .

'

licensee's written procedure for establishing .and maintaining control ,

'

charts, the data base used to determine control chart 11mits, and the

statistical methods applied in the evaluation af the data base, The performance of the program during the period July-Aagust, 1995, was

,

inspected. The program data used to monitor the quality of the i following types of measurements were f r/Spected: uranium cor. centration ,

and enrichment measurements cf fuel material .and nondestructive assay '

of sludge.

A review of the li;censee's written procedure for calculating control ,

chart limits reveale:: that it contained parrative descriptions of the statistical calculations eather than the mathematical models and the equations used for evaluating the statistical parameters. .The mathe-

'matical expressians of the control chart limf ts were delineated in

,

.

section 4.5.1 of the FNMC Plan. For those systems inspected, the ~!

calculations of the control chart limits for the period under review- i were verified to be accurate and in accordance with the FNMC Plan. The data base used in those ca~1culations hi.d al so been generated in accordance with the FNMC Pla It was,however, noted that the licensee had not submitted a revision to his FRMC Plan to incorporate NMSS policy regarding response to indications that a measurentent system is  !

out of contro The licensee indicated that a revision to the plan  ;

incorporating the necessary changes would be s'ubmitted to the Region'I office no later than February 1,1986. This matter has been deemed an inspector followup item (85 .14-03)

~

,

t J

, .

J-1

. _ . . - , , , . - - . . _ _-,,,_-,-.. _ , , , . . . . - . . . . , , . . _ . , , , . . , _ . . - , . - . ,