Notice of Violation from Insp on 881205-09.Violations Noted: Failure to Establish Written Procedures for Calculating Additions to & Removals from Matls in Process & Establish Measurement Control Program SNM Control
ML20236B693
Person / Time
Site: 07000371
Issue date: 01/29/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20236B660 List:
References
70-0371-88-12, NUDOCS 8903210230
Download: ML20236B693 (2)


Text

-

(

^'

, +.

. =,

p 1 .i APPENDII A NOTICE OF VIOLATION UNC_ Incorporated Docket No.70-371 Uncasville; Connecticut License No. SNM-368 During'the Nuclear Regulatory Commission (NRC) inspection conducted onL December 5-9,.1988, violations of NRC requirements were identified. In

'accordance with the " General Statement of Policy and Procedure for NRC Enforcement . Actions,'.10 CFR Part 2, Appendix C-(1988), the. violations are

' listed below:

.A. 10 CFR 70.51(c). requires the licensee to " establish, maintain and follow-written material control and accounting procedures which are sufficient i

-to enable the licensee to account for special nuclear material in his  !

possession'under. license". c Contrary to-the above, the licensee failed to establish written 1 procedures for: calculating additions to and removals from' material in process; monitoring the quality of measurements with' regard to replicate-measurements of 1 process materials; and responding to indications.that-

. control measurement performed in the laboratory had exceeded control limits.

'This is-a Severity Level IV violation (Supplement III).

B. 10 CFR 70.51(e)(4)(iv) requires-the licensee to complete and maintain "a record summarizing the quantities of element and fissile isotope, as appropriate, for. ending inventory of material in process, additions to '

material in process during the material balance interval and removals from the material in process during the material balance interval".

Contrary to.the above, for the July 15 - September 16, 1988 material balance interval, the licensee's summary of the quantities of addition to material in process and removals from material in process included 1 quantities of material which did not meet the definitions of additions to and removals from material in process as specified in 10 CFR 70.51(a)(1) and (9) respectively.

This a Severity Level IV violation (Supplement III).

C. 10 CFR 70.57(b) requires the licensee to " establish and maintain a measurement control' program for special nuclear material control and accounting measurements". 10 CFR 70.57(b)(8) specifies that the " program  !

1 shall generate current data on the performance of measuring processes, including, as appropriate, values for bias corrections and their l l

m 0FFICIAL RECORD COPY IR UNC 88 0001.1.0  ;

8903210230 890130 6 01/19/89 PDR ADOCK 07000371 l C PDC ,

as 1

. . l Appendix.A 2-

. uncertainties, random error variances,, limits .for. systematic errors, and other parameters needed to establish the-uncertainty of. measurements. l pertaining to materials control and accounting. The program data.shall-reflect.the. current' process and measurement _ conditions existing at the l time the control measurements are made. Measurements.which are not , j controlled by;the program shall not be used.for. materials' control or for.  :

accounting purposes". ,

Contrary to the above, the' licensee failed to. include.in the measurement' control program the spectrophotometric measurement system used for- ,

elemental analysis of laboratory waste solutions.  !

.)

This is a' Severity. Level IV violation.(Supplement III) j Pursuant to the provisions of 10 CFR 2.201, UNC Incorporated is hereby required to submit a written statement or explanation.to the' Nuclear Regulatory Commission, ATTN: Document Control. Desk, Washington, DC 20555, j with a. copy to the Regional Administrator, Region I,.within 30 days of the j date of the letter. transmitting this Notice'. This reply should be ' clearly .l marked as a " Reply to a Notice.of. Violation" and should include [for each -l

-violation]: (1) admission or denial of the violation, (2) the reason for the.

violation if admitted, (3) the corrective steps which have been taken.and the results: achieved, (4) the. corrective steps which will be taken to avoid.

further; violations,'and (5) the.date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response.' time. -If an adequate reply is not received within the time specified in'this Notice,'an order may be issued to show cause~why the license should not be modified, suspended, or revoked or why such other action as may'be proper -

should not be taken, 1

'}

OFFICIAL RECORD COPY IR UNC 88 0001.3.0 01/19/89