.i APPENDII A NOTICE OF VIOLATION UNC_ Incorporated Docket No.70-371 Uncasville; Connecticut License No. SNM-368 During'the Nuclear Regulatory Commission (NRC) inspection conducted onL December 5-9,.1988, violations of NRC requirements were identified.
In
'accordance with the " General Statement of Policy and Procedure for NRC Enforcement. Actions,'.10 CFR Part 2, Appendix C-(1988), the. violations are
' listed below:
.A.
10 CFR 70.51(c). requires the licensee to " establish, maintain and follow-written material control and accounting procedures which are sufficient i
-to enable the licensee to account for special nuclear material in his possession'under. license".
c Contrary to-the above, the licensee failed to establish written 1
procedures for: calculating additions to and removals from' material in process; monitoring the quality of measurements with' regard to replicate-measurements of process materials; and responding to indications.that-1
. control measurement performed in the laboratory had exceeded control limits.
'This is-a Severity Level IV violation (Supplement III).
B.
10 CFR 70.51(e)(4)(iv) requires-the licensee to complete and maintain "a record summarizing the quantities of element and fissile isotope, as appropriate, for. ending inventory of material in process, additions to material in process during the material balance interval and removals from the material in process during the material balance interval".
Contrary to.the above, for the July 15 - September 16, 1988 material balance interval, the licensee's summary of the quantities of addition to material in process and removals from material in process included 1
quantities of material which did not meet the definitions of additions to and removals from material in process as specified in 10 CFR 70.51(a)(1) and (9) respectively.
This a Severity Level IV violation (Supplement III).
C.
10 CFR 70.57(b) requires the licensee to " establish and maintain a measurement control' program for special nuclear material control and accounting measurements".
10 CFR 70.57(b)(8) specifies that the " program 1
shall generate current data on the performance of measuring processes, including, as appropriate, values for bias corrections and their l
l 0FFICIAL RECORD COPY IR UNC 88 0001.1.0 8903210230 890130 m
PDR ADOCK 07000371 6
01/19/89 l
C PDC 1
as
l Appendix.A 2-
. uncertainties, random error variances,, limits.for. systematic errors, and other parameters needed to establish the-uncertainty of. measurements.
l pertaining to materials control and accounting. The program data.shall-reflect.the. current' process and measurement _ conditions existing at the l
time the control measurements are made.
Measurements.which are not,
j controlled by;the program shall not be used.for. materials' control or for.
accounting purposes".
Contrary to the above, the' licensee failed to. include.in the measurement' control program the spectrophotometric measurement system used for-elemental analysis of laboratory waste solutions.
.)
This is a' Severity. Level IV violation.(Supplement III) j Pursuant to the provisions of 10 CFR 2.201, UNC Incorporated is hereby required to submit a written statement or explanation.to the' Nuclear Regulatory Commission, ATTN: Document Control. Desk, Washington, DC 20555, j
with a. copy to the Regional Administrator, Region I,.within 30 days of the j
date of the letter. transmitting this Notice'.
This reply should be ' clearly
.l marked as a " Reply to a Notice.of. Violation" and should include [for each
-l
-violation]: (1) admission or denial of the violation, (2) the reason for the.
violation if admitted, (3) the corrective steps which have been taken.and the results: achieved, (4) the. corrective steps which will be taken to avoid.
further; violations,'and (5) the.date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response.' time. -If an adequate reply is not received within the time specified in'this Notice,'an order may be issued to show cause~why the license should not be modified, suspended, or revoked or why such other action as may'be proper should not be taken, 1
'}
OFFICIAL RECORD COPY IR UNC 88 0001.3.0 01/19/89