ML20245B017
| ML20245B017 | |
| Person / Time | |
|---|---|
| Site: | 07000371 |
| Issue date: | 06/14/1989 |
| From: | Joy D, Kasun D, Mike Williams NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20245B015 | List: |
| References | |
| 70-0371-89-202, 70-371-89-202, NUDOCS 8906220342 | |
| Download: ML20245B017 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790 l
I U.S. NUCLEAR REGULATORY COMMISSION Report No.:
70-371/89-202 License No.: SNM-368 l
Safeguards Group I Licensee: United Nuclear Corporation Division of UNC Resources, Inc.
67 Sandy Desert Road Uncasville, Connecticut 06382 Docket No.: 70-371 License No: SNM-368 Facility Name: UNC Naval Products Inspection Conducted: May 22-26, 1989 Inspectors:
(-/2 - O D. R. Joy, NM55,gye or SMeguards Physical Scientist Date Signed 6 'l-T9 M. C. Williams, NM55, MC&A Physical Scientist Date Signed j
i i
Approved by:.Mb A-/f M '
D. KasunV 5ection Leader Date Signed 1
Physical Security and MC&A Licensing and Inspection Section, SGDB,' SGTR, NMSS
{
Report Summary:
I MC&A Inspection May-22-26, 1989 (70-371/89-202)
Scope:
The areas examined during this routine unannounced inspection l
included MC&A organization and management, measurements, physical inventories, and measurement control and statistics.
h
$Nk 1
C
2 Results: '
kn organizational structure has been implemented in accordance with the licensee's NPC approved Fundamental Nuclear Material Control (FNMC) Plan. A management system has been established, i
maintained and is being followed which provides for the develop-l ment, revision, implementation and enforcement of internal MC&A procedures, the FNMC Plan, applicable portions of 10 CFR Part 70 and License Conditions contained in Safeguards Amendment SG-1.
Nondestructive Assay and chemical analyses utilized by the l
licensee for special nuclear material accountability measurements are being conducted in a satisfactory manner by well trained and qualified pe :,onnel.
Within the scope of this inspection, an adequate program has been established, is being maintained and followed for the continuing determination and control of errors associated with i
measurement processes. Two inspector follow-up items, pertaining to the limit of error associated with inventory difference (ID) and the bias correction to ID, were identified.
)
Within the scope of this inspection, no weaknesses or deficiencies were noted with respect to physical inventory prac-tices and procedures.
i Four previous inspector follow-up items and two previous violations were closed out as a result of this inspection.
i 1
l
_ _ _ _ _ _ -