Safeguards Insp Rept 70-0371/85-15 on 850716-19.Major Areas Inspected:Site Security Program Exercise,Including Safeguards Contingency Plan & Procedures.Exercise Comprehensive & Objectives Accomplished
ML20154M958
Person / Time
Site: 07000371
Issue date: 03/07/1986
From: Keimig R, Madden W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20154M939 List:
References
70-0371-85-15, 70-371-85-15, NUDOCS 8603170141
Download: ML20154M958 (2)


Text

_ - _ _,_ _ _ _

t U.S. NUCLEAR REGULATORY COMMISSION REGION I Report No.

70-371/85-15 t

Docket No.70-371 License No.

SNM-368 Licensee:

UNC Naval Products l

Division of UNC Resources, Inc.

67 Sandy Desert Road Uncasv111e, Connecticut 06382 _

Facility Name:

UNC Naval Products Inspection At:

Uncasville, Connecticut Inspection Conducted:

December 17, 1985 Date of Last Physical Security Inspection:

July 16-19, 1985 Type of Inspection: _Special, Announced Safeguards Contingency Plan Inspection Inspector:

/), A._;

d Add ~-

S

  • h d (*

, WT111ariFJ. Mriden, Physical Security date Inspector Approved by:

Jg s

/ chard R. Ke ig, ef, Safeguards date

Section, SS Inspection Summary: Announced Physical SecurttJ Inspection of Safeguards Contingency Plan Exercise on December 17, 1935 (Report No. '/U 3d785;l M-

~

Areas Inspected:

Safeguards Contingency Plan and Implementing Procedures

[

during a planned site security program exercise.

The inspection involved 8 inspector hours onsite by one NRC region-based inspector who was accompanied by a representative from the NRC's office of Nuclear Material Safety and Safeguards.

Results:

The exercise was comprehensive and the licensee's planned objectives were accomplished.

h D

C i

u

DETAILS 1.0 Key Persons Contacted R. Gregg, Director, Technical Services, UNC-NPD R. Gigliotti, Director of Security, UNC-NPD

0. Smith, Physical Security Licensing Reviewer, USNRC 2.0 MC30703 - Exit Interview The inspector met with Mr. R. Gigliotti at the conclusion of the inspec-tion and sum.marized the scope and findings of the inspection.

I At no time during the inspection was written material provided to the licensee.

3.0 MC81601 - Safeguards Contingency Plan Inplementation Review j

1 During this inspection, the inspector and the NRC Physical Security Licensing Reviewer from the Office of Nuclear Material Safety and Safe-guards (NMSS) observed a planned Safeguards Contingency Plan Exercise conducted by the licensee.

The exercise included the participation of both onsite and offsite personnel.

The inspector determined that the exercise achieved the desired performance objectives.

Lessons learned i

were critiqued after the exercise and future exercises will be scheduled.

No deficiencies were identified, l