{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 9, 2002 U. S. Nuclear Regulatory Commission                              Serial No. 02-732 Attention: Document Control Desk                                  SPS Lic/JSA RO Washington, D.C. 20555-0001                                      Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of November 2002 is provided in the attachment.
If you have any questions or require additional information, please contact us.
Very truly yours,
ýiy.            yc;-e-Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:    United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station
 
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-11 Approved:                  Pdf J ý Sit ice Presieta
 
Surry Monthly Operating Report No. 02-11 Page 2 of 15 TABLE OF CONTENTS Section                                                                                                                                                                Page Operating Data Report - Unit No. I ...........................................................................................................................              3 Operating Data Report - Unit No. 2 ...........................................................................................................................            4 Unit Shutdowns and Power Reductions - Unit No. 1 ............................................................................................                              5 Unit Shutdowns and Power Reductions - Unit No. 2 ............................................................................................                              6 Average Daily Unit Power Level - Unit No. I ........................................................................................................                        7 Average Daily Unit Power Level - Unit No. 2 ........................................................................................................                        8 Summary of Operating Experience - Unit Nos. I and 2 .......................................................................................                                9 Facility Changes That Did Not Require NRC Approval ........................................................................................                              10 Procedure or Method of Operation Changes That Did Not Require NRC Approval ...........................................                                                    11 Tests and Experiments That Did Not Require NRC Approval ..............................................................................                                    12 Chemistry Repo rt ..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................            14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ......................................................................................................................              15
 
Surry Monthly Operating Report No. 02-11 Page 3 of 15 OPERATING DATA REPORT Docket No.:    50-280 Date:    12102102 Completed By:    R. Stief Telephone:    (757) 365-2486
: 1. Unit Name: ............................................................ Surry Unit 1
: 2. Reporting Period: .................................................. November 2002
: 3. Ucensed Thermal Power (MWt): ..........................                      2546
: 4. Nameplate Rating (Gross MWe): ..........................                      847.5
: 5. Design Electrical Rating (Net MWe): ....................                      788
: 6. Maximum Dependable Capacity (Gross MWe):....                                  842
: 7. Maximum Dependable Capacity (Net MWe): ........                                810
: 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month      Year-To-Date          Cumulative
: 11. Hours in Reporting Period                                                              720.0            8016.0          262464.0
: 12. Hours Reactor Was Critical                                                            720.0            8016.0          193777.6
: 13. Reactor Reserve Shutdown Hours                                                          0.0                0.0            3774.5
: 14. Hours Generator On-Line                                                                720.0            8016.0          191118.2
: 15. Unit Reserve Shutdown Hours                                                              0.0                0.0            3736.2
: 16. Gross Thermal Energy Generated (MWH)                                            1832631.2        20305531.4        455613009.3
: 17. Gross Electrical Energy Generated (MWH)                                            614071.0          6791057.0      149871160.0
: 18. Net Electrical Energy Generated (MWH)                                              591678.0          6537326.0      143130187.0
: 19. Unit Service Factor                                                                  100.0%            100.0%              72.8%
: 20. Unit Availability Factor                                                            100.0%            100.0%              74.2%
: 21. Unit Capacity Factor (Using MDC Net)                                                101.5%            100.7%              69.7%
: 22. Unit Capacity Factor (Using DER Net)                                                104.3%            103.5%              69.2%
: 23. Unit Forced Outage Rate                                                                0.0%                0.0%              12.3%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
April 2003 Type and duration of scheduled shutdowns are no longer provided.
[
 
==Reference:==
Letter SIN 00-069, dated February 7, 2000]
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:                        Estimated start-up dates are no longer provided. [
 
==Reference:==
Letter S/N 00-069, dated February 7. 2000]
: 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST                ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
 
Surry Monthly Operating Report No. 02-11 Page 4 of 15 OPERATING DATA REPORT Docket No.:    50-281 Date:    12/02/02 Completed By:    R. Stief Telephone:    (757) 365-2486
: 1. Unit Name: ............................................................ Surry Unit 2
: 2. Reporting Period: .................................................. November 2002
: 3. Licensed Thermal Power (MWt): ..........................                    2546
: 4. Nameplate Rating (Gross MWe): ..........................                      847.5
: 5. Design Electrical Rating (Net MWe): ....................                      788
: 6. Maximum Dependable Capacity (Gross MWe): ....                                847
: 7. Maximum Dependable Capacity (Net MWe): ........                              815
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month        Year-To-Date          Cumulative
: 11. Hours in Reporting Period                                                              720.0              8016.0            259345.0
: 12. Hours Reactor Was Critical                                                            683.6              7321.4            191139.4
: 13. Reactor Reserve Shutdown Hours                                                          0.0                    0.0              328.1
: 14. Hours Generator On-Line                                                                624.7              7224.0            188840.4
: 15. Unit Reserve Shutdown Hours                                                              0.0                    0.0                0.0
: 16. Gross Thermal Energy Generated (MWH)                                            1586809.8          18307856.3          451332760.5
: 17. Gross Electrical Energy Generated (MWH)                                          530867.0            6126569.0        148503576.0
: 18. Net Electrical Energy Generated (MWH)                                              512440.0            5908723.0        141865773.0
: 19. Unit Service Factor                                                                  86.8%                90.1%              72.8%
: 20. Unit Availability Factor                                                              86.8%                90.1%              72.8%
: 21. Unit Capacity Factor (Using MDC Net)                                                  87.3%                90.4%              69.6%
: 22. Unit Capacity Factor (Using DER Net)                                                  90.3%                93.5%              69.4%
: 23. Unit Forced Outage Rate                                                              13.2%                  1.3%                9.8%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
f
 
==Reference:==
Letter SIN 00-069. dated February 7, 20001
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:                        Estimated start-up dates are no longer provided. [
 
==Reference:==
Letter S/N 00-069, dated February 7, 2000]
: 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST                ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
 
Surry Monthly Operating Report No. 02-11 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: November 2002 Docket No.:    50-280 Unit Name:    Surry Unit 1 Date:  12/02/02 Completed by:    R. Stief Telephone:    (757) 365-2486 None during the Reporting Period (1)                            (2)                                                  (3)
F:  Forced                  REASON:                                              METHOD:
S:  Scheduled              A - Equipment Failure (Explain)                      I - Manual B - Maintenance or Test                              2 - Manual Scram C - Refueling                                        3 - Automatic Scram D - Regulatory Restriction                          4 - Other (Explain)
E - Operator Training & Ucensing Examination F - Administrative G - Operational Error (Explain)
H    Other (Explain)
(4)                                                                                (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets                    Exhibit I - Same Source for Licensee Event Report (LER) File (NUREG 0161)
 
Surry Monthly Operating Report No. 02-11 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: November 2002 Docket No.:    50-281 Unit Name:    Surry Unit 2 Date:    12/02/02 Completed by:    R. Stief Telephone:      (757) 365-2486 (1)                    (2)      (3)                      (4)      (5)
Method Duration                  of        LER No. System  Component      Cause & Corrective Action to Date    Type      Hours    Reason    Shutting                  Code      Code              Prevent Recurrence Down Rx 11/23/02      S      11H 44M        B        N/A          N/A        N/A      N/A        Unit ramped to perform 2-OSP TM-001, Turbine Inlet Valve Freedom Test 11/23/02      F      95H 15M        A        3      Report Under    JJ      HCU          Unit 2 tripped due to failure of Review                                Electro-Hydraulic Controls (1)                            (2)                                              (3)
F:  Forced                  REASON:                                          METHOD:
S:  Scheduled              A - Equipment Failure (Explain)                  1 - Manual B - Maintenance or Test                          2 - Manual Scram C - Refueling                                    3 - Automatic Scram D - Regulatory Restriction                        4 - Other (Explain)
E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)
H      Other (Explain)
(4)                                                                              (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets                  Exhibit I - Same Source for Licensee Event Report (LER) File (NUREG 0161)
 
Surry Monthly Operating Report No. 02-11 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 12/02102 Completed by: R. Stief Telephone: (757) 365-2486 MONTH:    November 2002 Average Daily Power Level Average Daily Power Level Day                  (MWe - Net)                  Day                  (MWe - Net) 1                      824                      17                      824 2                      824                      18                      824 3                      824                      19                      824 4                      824                      20                      822 5                      824                      21                      821 6                      824                      22                      822 7                      823                      23                      819 8                      824                      24                      814 9                      822                      25                      813 10                      822                      26                      806 11                      824                      27                      819 12                      824                      28                      823 13                      824                      29                      824 14                      824                      30                      824 15                      824 16                      819 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
Sumy Monthly Operating Report No. 02-11 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:    50-281 Unit Name:    Surry Unit 2 Date:  12/02/02 Completed by:    R. Stief Telephone:    (757) 365-2486 MONTH:    November 2002 Average Daily Power Level                      Average Daily Power Level Day                (MWe - Net)                Day                (MWe - Net) 1                      828                    17                      825 2                      828                    18                      827 3                      828                    19                      828 4                      828                  20                      828 5                      828                  21                      829 6                      827                  22                      828 7                      828                    23                      115 8                      828                    24                        0 9                      827                    25                        0 10                      827                    26                        0 11                      827                    27                      550 12                      827                    28                      827 13                      828                    29                      826 14                      828                    30                      827 15                      828 16                      827 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.
 
Surry Monthly Operating Report No. 02-11 Page 9 of 15
 
==SUMMARY==
OF OPERATING EXPERIENCE MONTH/YEAR: November 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
UNrT ONE:
11101102      0000          Unit started the month at 100% / 853 MWe.
11/30/02      2400          Unit finished the month at 100% /853 MWe.
UNIT TWO:
11/01/02      0000          Unit started the month at 100% / 858 MWe.
11/23/02      0148          Commenced ramping to 85% In accordance with procedure 2-OSP-TM-001.
11/23/02      0251          Stopped ramp at 85%.
11/23/02      0303          Commenced 2-OSP-TM-001.
11/23/02      0332          Unit Reactor Trip. While closing #3 Governor Valve lAW 2-OSP-TM-001, EHC Control Cards failed causing all Governor Valves to fail shut. Cards replaced.
11/24/02      1550          Reactor Critical.
11/27/02      0247          Generator On-line.
11/27/02      1653          Unit at 100% Power 855 MWe.
11/30/02      2400          Unit finished the month at 100% / 857 MWe.
 
Surry Monthly Operating Report No. 02-11 Page 10 of 15 FACIuTY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHYEAR: November 2002 None during the Reporting Period
 
Surry Monthly Operating Report No. 02-11 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR:  November 2002 None during the Reporting Period
 
Surry Monthly Operating Report No. 02-11 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: November 2002 None during the Reporting Period
 
Surry Monthly Operating Report No. 02-11 Page 13 of 15 CHEMISTRY REPORT MONTHYEAR: November 2002 Unit No. 1                      Unit No. 2 Primary Coolant Analysis          Max.        Min.      Avg. Max.          Min.        Avg.
Gross Radioactivity, iCilml          3.98E-1    1.39E-1    2.86E-1 3.87E-1      2.82E-2      2.55E-1 Suspended Solids, ppm                    -          -                0.05          0.01          0.03 Gross Tritium, pCilml                1.21E+0    7.14E-1    8.77E-1 1.63E+0      1.15E+0      1.47E+0 1131, 4Ci/ml                          2.85E-4    1.10E-4    1.90E-4 1.84E-4      4.90E-5      1.03E-4 1131/1133                              0.11        0.06      0.08    0.1          0.07          0.08 Hydrogen, cc/kg                        37.8        35.2      36.5    40.5          36.2          38.4 Lithium, ppm                            2.32        2.07      2.19    2.69          2.06          2.29 Boron - 10, ppm*                        117        97        107    288            194          235 Oxygen, (DO), ppm                    < 0.005    < 0.005    <0.005  <0.005        < 0.005      *50.005 Chloride, ppm                          0.004      0.002      0.003  0.003          0.002        0.002 pH ( 25 degree Celsius                  7.2        6.87        7    6.77          6.4          6.55
* Boron - 10 = Total Boron x 0.196 Comments:
None
 
Surry Monthly Operating Report No. 02-11 Page 14 of 15 FUEL HANDLING UNITS I & 2 MONTHIYEAR: November 2002 New Fuel                  Number of                                              New or Spent Shipment or Date Stored or  Assemblies      Assembly          ANSI    Initial    Fuel Shipping Cask No. Received    oer Shioment      Number          Number Enrichment    Cask Activity None during the Reporting Period
 
Surry Monthly Operating Report No. 02-11 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED INTECHNICAL SPECIFICATIONS MoNTIVEAR: November 2002 None during the Reporting Period}}

Latest revision as of 05:47, 26 March 2020

November 2002 Monthly Operating Report for Surry Units 1 & 2
ML023520526
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/09/2002
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-732
Download: ML023520526 (16)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 9, 2002 U. S. Nuclear Regulatory Commission Serial No.02-732 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of November 2002 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours,

ýiy. yc;-e-Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-11 Approved: Pdf J ý Sit ice Presieta

Surry Monthly Operating Report No. 02-11 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. I ........................................................................................................................... 3 Operating Data Report - Unit No. 2 ........................................................................................................................... 4 Unit Shutdowns and Power Reductions - Unit No. 1 ............................................................................................ 5 Unit Shutdowns and Power Reductions - Unit No. 2 ............................................................................................ 6 Average Daily Unit Power Level - Unit No. I ........................................................................................................ 7 Average Daily Unit Power Level - Unit No. 2 ........................................................................................................ 8 Summary of Operating Experience - Unit Nos. I and 2 ....................................................................................... 9 Facility Changes That Did Not Require NRC Approval ........................................................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval ........................................... 11 Tests and Experiments That Did Not Require NRC Approval .............................................................................. 12 Chemistry Repo rt ..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ...................................................................................................................... 15

Surry Monthly Operating Report No. 02-11 Page 3 of 15 OPERATING DATA REPORT Docket No.: 50-280 Date: 12102102 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ............................................................ Surry Unit 1
2. Reporting Period: .................................................. November 2002
3. Ucensed Thermal Power (MWt): .......................... 2546
4. Nameplate Rating (Gross MWe): .......................... 847.5
5. Design Electrical Rating (Net MWe): .................... 788
6. Maximum Dependable Capacity (Gross MWe):.... 842
7. Maximum Dependable Capacity (Net MWe): ........ 810
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 720.0 8016.0 262464.0
12. Hours Reactor Was Critical 720.0 8016.0 193777.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
14. Hours Generator On-Line 720.0 8016.0 191118.2
15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) 1832631.2 20305531.4 455613009.3
17. Gross Electrical Energy Generated (MWH) 614071.0 6791057.0 149871160.0
18. Net Electrical Energy Generated (MWH) 591678.0 6537326.0 143130187.0
19. Unit Service Factor 100.0% 100.0% 72.8%
20. Unit Availability Factor 100.0% 100.0% 74.2%
21. Unit Capacity Factor (Using MDC Net) 101.5% 100.7% 69.7%
22. Unit Capacity Factor (Using DER Net) 104.3% 103.5% 69.2%
23. Unit Forced Outage Rate 0.0% 0.0% 12.3%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

April 2003 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter SIN 00-069, dated February 7, 2000]

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7. 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 02-11 Page 4 of 15 OPERATING DATA REPORT Docket No.: 50-281 Date: 12/02/02 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ............................................................ Surry Unit 2
2. Reporting Period: .................................................. November 2002
3. Licensed Thermal Power (MWt): .......................... 2546
4. Nameplate Rating (Gross MWe): .......................... 847.5
5. Design Electrical Rating (Net MWe): .................... 788
6. Maximum Dependable Capacity (Gross MWe): .... 847
7. Maximum Dependable Capacity (Net MWe): ........ 815
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 720.0 8016.0 259345.0
12. Hours Reactor Was Critical 683.6 7321.4 191139.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1
14. Hours Generator On-Line 624.7 7224.0 188840.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1586809.8 18307856.3 451332760.5
17. Gross Electrical Energy Generated (MWH) 530867.0 6126569.0 148503576.0
18. Net Electrical Energy Generated (MWH) 512440.0 5908723.0 141865773.0
19. Unit Service Factor 86.8% 90.1% 72.8%
20. Unit Availability Factor 86.8% 90.1% 72.8%
21. Unit Capacity Factor (Using MDC Net) 87.3% 90.4% 69.6%
22. Unit Capacity Factor (Using DER Net) 90.3% 93.5% 69.4%
23. Unit Forced Outage Rate 13.2% 1.3% 9.8%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

f

Reference:

Letter SIN 00-069. dated February 7, 20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 02-11 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: November 2002 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 12/02/02 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Ucensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit I - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 02-11 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: November 2002 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 12/02/02 Completed by: R. Stief Telephone: (757) 365-2486 (1) (2) (3) (4) (5)

Method Duration of LER No. System Component Cause & Corrective Action to Date Type Hours Reason Shutting Code Code Prevent Recurrence Down Rx 11/23/02 S 11H 44M B N/A N/A N/A N/A Unit ramped to perform 2-OSP TM-001, Turbine Inlet Valve Freedom Test 11/23/02 F 95H 15M A 3 Report Under JJ HCU Unit 2 tripped due to failure of Review Electro-Hydraulic Controls (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit I - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 02-11 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 12/02102 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: November 2002 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 824 17 824 2 824 18 824 3 824 19 824 4 824 20 822 5 824 21 821 6 824 22 822 7 823 23 819 8 824 24 814 9 822 25 813 10 822 26 806 11 824 27 819 12 824 28 823 13 824 29 824 14 824 30 824 15 824 16 819 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Sumy Monthly Operating Report No. 02-11 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 12/02/02 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: November 2002 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 828 17 825 2 828 18 827 3 828 19 828 4 828 20 828 5 828 21 829 6 827 22 828 7 828 23 115 8 828 24 0 9 827 25 0 10 827 26 0 11 827 27 550 12 827 28 827 13 828 29 826 14 828 30 827 15 828 16 827 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-11 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MONTH/YEAR: November 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrT ONE:

11101102 0000 Unit started the month at 100% / 853 MWe.

11/30/02 2400 Unit finished the month at 100% /853 MWe.

UNIT TWO:

11/01/02 0000 Unit started the month at 100% / 858 MWe.

11/23/02 0148 Commenced ramping to 85% In accordance with procedure 2-OSP-TM-001.

11/23/02 0251 Stopped ramp at 85%.

11/23/02 0303 Commenced 2-OSP-TM-001.

11/23/02 0332 Unit Reactor Trip. While closing #3 Governor Valve lAW 2-OSP-TM-001, EHC Control Cards failed causing all Governor Valves to fail shut. Cards replaced.

11/24/02 1550 Reactor Critical.

11/27/02 0247 Generator On-line.

11/27/02 1653 Unit at 100% Power 855 MWe.

11/30/02 2400 Unit finished the month at 100% / 857 MWe.

Surry Monthly Operating Report No. 02-11 Page 10 of 15 FACIuTY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHYEAR: November 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-11 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: November 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-11 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: November 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-11 Page 13 of 15 CHEMISTRY REPORT MONTHYEAR: November 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg.

Gross Radioactivity, iCilml 3.98E-1 1.39E-1 2.86E-1 3.87E-1 2.82E-2 2.55E-1 Suspended Solids, ppm - - 0.05 0.01 0.03 Gross Tritium, pCilml 1.21E+0 7.14E-1 8.77E-1 1.63E+0 1.15E+0 1.47E+0 1131, 4Ci/ml 2.85E-4 1.10E-4 1.90E-4 1.84E-4 4.90E-5 1.03E-4 1131/1133 0.11 0.06 0.08 0.1 0.07 0.08 Hydrogen, cc/kg 37.8 35.2 36.5 40.5 36.2 38.4 Lithium, ppm 2.32 2.07 2.19 2.69 2.06 2.29 Boron - 10, ppm* 117 97 107 288 194 235 Oxygen, (DO), ppm < 0.005 < 0.005 <0.005 <0.005 < 0.005 *50.005 Chloride, ppm 0.004 0.002 0.003 0.003 0.002 0.002 pH ( 25 degree Celsius 7.2 6.87 7 6.77 6.4 6.55

None

Surry Monthly Operating Report No. 02-11 Page 14 of 15 FUEL HANDLING UNITS I & 2 MONTHIYEAR: November 2002 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received oer Shioment Number Number Enrichment Cask Activity None during the Reporting Period

Surry Monthly Operating Report No. 02-11 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED INTECHNICAL SPECIFICATIONS MoNTIVEAR: November 2002 None during the Reporting Period