ML17276B336: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 34: Line 34:
4 fl tt      )
4 fl tt      )
                   \t 1)
                   \t 1)
  ,
             )t
             )t


Line 51: Line 50:
Sincerely, ruce Blanchard, Director Environmental Project Review
Sincerely, ruce Blanchard, Director Environmental Project Review
                                                                                             +co 8
                                                                                             +co 8
it
it ssos>7oss9 PDR ADQCK
      ':
ssos>7oss9 PDR ADQCK
~,D, ssosis 05000397
~,D, ssosis 05000397
                       ',',,',,PDR,,I
                       ',',,',,PDR,,I

Latest revision as of 09:14, 4 February 2020

Comments on Fes.No Objections Exist to Issuance of Section 404 Permit If Listed Conditions Stipulated
ML17276B336
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/16/1982
From: Blanchard B
INTERIOR, DEPT. OF
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8203170269
Download: ML17276B336 (4)


Text

REGULATORY. FORMATION DISTRIBUTION SY .M (RIDS)

W~

ACCESSION NBR 8203 l07 0269 DOC ~ DATE 82/03/1 6 NOTAR I ZED 'NO DOCKET FAC IL: 50 "397 NPPSS Nuclear BYNAME Projects Unit 2i Washington Public Pose OS000397 AUTH AUTHOR AF F IL I A T ION BLANCHARDFB~ In t'er i or E Dep t. o f 8 EC IP. NAME SCHWA'IENCER RECIPIENT AFFILIATION

'2 F A ~ Licensing Branch

SUBJECT:

Comments on FES.No objections exist to issuance of Section 400 permit if listed conditions stipulated.

DISTRIBUTIONCODE.: COOED COPIES RECEIVED:LTR $ ENCL

$ 'SIZE:. -J TITLE: Environ. Comments.

NOTES:2 copies all matl:PM. 05000397 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LIC BR P2 BC Ob NL: ANL AULUCKgR ~ Ol INTERNAL: ELD IE 13 1 NRR/DE/AEAB 20 NRR/DE/EEB 16 1 NRR/DE/HGEB NRR/DS I/AEB NRR/DSI/RAB

'9 21 17 NRR/DE/SAB NRR F LE, 18

.KL/ TSB 15 0<) 1 1

RGNS EXTERNAL: ACRS 1 LPDR 03,,

02 1

NATL LAB 21 NRC PDR 1 NSIC 05 1 NTIS .1 3P TOTAL NUMBER OF COPIES REQUIRED: L'TTR P5 ENCL

4 fl tt )

\t 1)

)t

~gt4Y Oc ~

Q EA F W United States Department of the Interior 0

JD OFFICE OF THE SECRETARY WASHINGTON, D.C. 20240 ER 81/153V /

MAR 16 1982 RECgj~g tt~R>'r 1982 Mr. A. Schwencer l'l Mam ngurml AiSQ7 Qgtggpelec, Chief, Licensing Branch No. 2 TIDC g

Division of Licensing Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

We have reviewed the final environmental impact statement related to the operation of WPPSS Nuclear Project No. 2, Benton County, Washington. In the upcoming review of the Corps of Engineers'ublic notice regarding issuance of a Section 404 permit for project-associated work in the Columbia River, the Pish and Wildlife Service will, in all likelihood, not object to issuance of the permit provided that the following conditions are stipulated in the permit:

1. Water intakes will be screened such that the maximum size of openings is 3/8-inch and maximum approach velocity at the screen surface is .5 feet per second, so as to prevent entrainment of salmonid fry and smolts.
2. In-river construction activity will be conducted during the timeframe of December through February when construction activities are least likely to impact salmonid spawning and migration.

We hope these comments will be helpful to you.

Sincerely, ruce Blanchard, Director Environmental Project Review

+co 8

it ssos>7oss9 PDR ADQCK

~,D, ssosis 05000397

',',,',,PDR,,I

0 1

I l'l

~ ~

~ A ~

~

t

~

~ 4

~

J'