ML17275B248

From kanterella
Jump to navigation Jump to search
Responds to 810807 Request for Comments on Facility Des.No Comments Offered.Any Work Performed in Columbia River or Discharge of Dredged or Filled Matl in Adjacent Wetlands Should Be Coordinated Through Seattle District
ML17275B248
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/17/1981
From: Olson D
ARMY, DEPT. OF, CORPS OF ENGINEERS
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NPDPL-ER, NUDOCS 8109220387
Download: ML17275B248 (4)


Text

REGU RY INFORMATION DZSTRIBUT SYSTEM (RIDS)

ACCESSION NBR; 8109220387 DOC, DATE: 81/09/17 NOTARIZED'. NO . DOCKEiT~ 0 FACILC50 397 WPPSS Nucl ear Projects Uni t" 2'i Nash'ington Publ i c Pbwe>> 05000397

'AUTH>>,NAME AUTHOR AFFILIATION OLSONpD,K., ArmyiDept.ofi Corps of Eng,ineers RKC IP ~ NAMEl REC IP'IKNT AFFIL>>IATION SCHHKNCERgA, L>>icensing, Branch 2 SUBJECTS'esponds to 810807 request>> fori comments on facility DKS.No comments offered+Any work perfor med in Columbia Rive~ or discharge of dredged or filled matl in adjacent wetlands shbuld be coordinated through Seattle". District; DISTR'IBUTION CODEINE C002S COPIES RECK% VED: LR'R ENCL SIZE':<

TITLEt Ehviron ~ Comments.

NOTES:2 copies all matl!PM, 05000397 RECIPIENT COPIE8 RECIPIENT COPIES IO CODE/NAME) LTTR EN Lr ID CODE/NAME LTTR>>

ACT'ION LIC" BR 02'C 06>> 7 AULUCKgR ~ 05 INTERNAL>>e ACC IDNTi E>>VAL 19 1 EF TREAT SYS 15 ENV ENG BR 16'8 1 HYDRO GKO BR 2'1 Ei 13>> 2 RAD. ASSESS BR17 1 01 ENCL'XTERNAL>>:

SIT>> ANAL'R 18 1- UTIL~ FINANCE 20 ACRS 1 LPDR 03.

NATL LAB 21 5 NRC'DR'TIS 02" NSIC 04 1 gyp g Qgg 6

TOTAL NUMBER OF COPIES REQUIRED: L>>TTR ENCI.'

N 4

¹ i 44 44

+j 44 4 h h L(

u

'(

4(

K N ¹

DEPARTMENT OF THE ARMY NORTH PACIFIC DIVISION. CORPS OF ENGINEERS P.O. BOX 2870 PORTLAND, OREGON 97208 NPDPL-ER 17 September 1981 e ~ e,

(~

tL Mr. A. Schwencer Chief, Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Schwencer:

k ~

This is in reply to your letter of 7 August" 1981 requesting, comments on the Draft Environmental Impact Statement for the operation 'of WPPSS Nuclear Project No. 2, Hanford, Washington.

We have reviewed the statement and have no comments to make. However, we do wish to inform you that any work performed in the Columbia River or any discharge of dredged or filled material on adjacent wetlands of, thei( Columbia River should be coordinated through the Seattle District. Previously Department of the Army permits were coordinated through the Walla Walla District.

We appreciate the opportunity to review and comment on the statement.

Sincerely, E. OLSON Chief, Planning Division 5

i/

'109220387 05000397 Bi0917 PDR ADQCK 0 )

PDR)

4(

'h

~ ' I h>>

p h (-

h ~ Jh h

I h

rh I

I 'I n

r')

~ h