| {{#Wiki_filter:June 4, 2007LICENSEE:Exelon Generation Company, LLCFACILITY:Byron Station, Units 1 and 2 | | {{#Wiki_filter:June 4, 2007 LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Units 1 and 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSSTHE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENTOn May 8, 2007, the Nuclear Regulatory Commission (NRC) held a public meetingat the Byron Station Training Center in Byron, IL. The meeting was between NRC Region III management and Exelon Generation Company management to discuss theNRC's assessment of the safety performance of Byron Station, Units 1 and 2, for the period from January 1 through December 31, 2006. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML071100250 and ML071290248, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.The NRC began the meeting with an overview of the NRC's Reactor Oversight Program(ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of the performance of Byron Station, Units 1 and 2, in calendar year 2006, which was documented in the March 2, 2007, end-of-cycle assessment letter, as ML070610211. As part of this regulatory performance meeting, Exelon briefly responded to the NRC's assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.Sincerely,/RA/Richard A. Skokowski, ChiefBranch 3 Division of Reactor ProjectsDocket Nos. 50-454; 50-455License Nos. NPF-37; NPF-66 | | OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 8, 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at the Byron Station Training Center in Byron, IL. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRCs assessment of the safety performance of Byron Station, Units 1 and 2, for the period from January 1 through December 31, 2006. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML071100250 and ML071290248, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure. |
| | The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Byron Station, Units 1 and 2, in calendar year 2006, which was documented in the March 2, 2007, end-of-cycle assessment letter, as ML070610211. As part of this regulatory performance meeting, Exelon briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. |
| | Sincerely, |
| | /RA/ |
| | Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As Stated LICENSEE:Exelon Generation Company, LLCFACILITY:Byron, Units 1 and 2 | | As Stated |
| | |
| | LICENSEE: Exelon Generation Company, LLC FACILITY: Byron, Units 1 and 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSSTHE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENTOn May 8, 2007, the Nuclear Regulatory Commission (NRC) held a public meetingat the Byron Station Training Center in Byron, IL. The meeting was between NRC Region III management and Exelon Generation Company management to discuss theNRC's assessment of the safety performance of Byron Station, Units 1 and 2, for the period from January 1 through December 31, 2006. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML071100250 and ML071290248, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.The NRC began the meeting with an overview of the NRC's Reactor Oversight Program(ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of the performance of Byron Station, Units 1 and 2, in calendar year 2006, which was documented in the March 2, 2007, end-of-cycle assessment letter, as ML070610211. As part of this regulatory performance meeting, Exelon briefly responded to the NRC's assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.Sincerely,Richard A. Skokowski, ChiefBranch 3 Division of Reactor ProjectsDocket Nos. 50-454; 50-455License Nos. NPF-37; NPF-66 | | OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 8, 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at the Byron Station Training Center in Byron, IL. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRCs assessment of the safety performance of Byron Station, Units 1 and 2, for the period from January 1 through December 31, 2006. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML071100250 and ML071290248, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure. |
| | The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Byron Station, Units 1 and 2, in calendar year 2006, which was documented in the March 2, 2007, end-of-cycle assessment letter, as ML070610211. As part of this regulatory performance meeting, Exelon briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. |
| | Sincerely, Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As Stated DISTRIBUTION:See next pageDOCUMENT NAME:C:\FileNet\ML071560306.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive*See previous concurrenceTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIINAMEDLords*:dtpRSkokowskiDATE05/31/0706/04/07OFFICIAL RECORD COPY Letter to Exelon Generation Company, LLC from Richard A. Skokowski dated June 4, 2007 | | As Stated DISTRIBUTION: |
| | See next page DOCUMENT NAME:C:\FileNet\ML071560306.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive |
| | *See previous concurrence To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DLords*:dtp RSkokowski DATE 05/31/07 06/04/07 OFFICIAL RECORD COPY |
| | |
| | Letter to Exelon Generation Company, LLC from Richard A. Skokowski dated June 4, 2007 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSSTHE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENTcc w/encl:Site Vice President - Byron StationPlant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station President, Village of Leaf River President, Village of Davis Junction President, Village of Stillman Valley Ogle County Board Chairman Ogle County Sheriff/EMA Coordinator EMA Coordinator, Winnebago County Winnebago County Board Chair Winnebago County Sheriff/ESDA Mayor of Oregon Mayor of Byron President, Village of Mt. Morris Mayor of Rochelle INPO Letter to Exelon Generation Company, LLC from Richard A. Skokowski dated June 4, 2007 | | OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station President, Village of Leaf River President, Village of Davis Junction President, Village of Stillman Valley Ogle County Board Chairman Ogle County Sheriff/EMA Coordinator EMA Coordinator, Winnebago County Winnebago County Board Chair Winnebago County Sheriff/ESDA Mayor of Oregon Mayor of Byron President, Village of Mt. Morris Mayor of Rochelle INPO |
| | |
| | Letter to Exelon Generation Company, LLC from Richard A. Skokowski dated June 4, 2007 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSSTHE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENTDISTRIBUTION | | OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION: |
| :RAG1 TEB RFK RidsNrrDirslpab
| | RAG1 TEB RFK RidsNrrDirslpab JLC1 GEG KGO RML2 SAM9 SRI Byron DRPIII DRSIII PLB1 TXN |
|
| |
|
| JLC1 GEG KGO RML2 SAM9 SRI Byron DRPIII DRSIII PLB1 TXN EnclosureMeeting Participants NRCR. Skokowski, Chief, Branch 3, Division of Reactor Projects, Region IIIB. Bartlett, Senior Resident Inspector, Byron R. Ng, Resident Inspector, Byron D. Szwarc, Reactor Engineer, Region IIIExelon Generation CompanyD. Hoots, Site Vice PresidentM. Snow, Plant Manager W. Grundmann, Regulatory Assurance Manager T. Hulbert, Regulatory Assurance Specialist R. Kartheiser, Nuclear Communications R. Meyer, Training B. Stoermer, TrainingIllinois Emergency Management AgencyR. Zuffa J. Roman}}
| | Enclosure Meeting Participants NRC R. Skokowski, Chief, Branch 3, Division of Reactor Projects, Region III B. Bartlett, Senior Resident Inspector, Byron R. Ng, Resident Inspector, Byron D. Szwarc, Reactor Engineer, Region III Exelon Generation Company D. Hoots, Site Vice President M. Snow, Plant Manager W. Grundmann, Regulatory Assurance Manager T. Hulbert, Regulatory Assurance Specialist R. Kartheiser, Nuclear Communications R. Meyer, Training B. Stoermer, Training Illinois Emergency Management Agency R. Zuffa J. Roman}} |
05/08/2007 - Summary of Public Meeting with Exelon Generation Company Management to Discuss the Byron Station, Units 1 & 2, End-of-Cycle Plant Performance AssessmentML071560306 |
Person / Time |
---|
Site: |
Byron |
---|
Issue date: |
06/04/2007 |
---|
From: |
Richard Skokowski NRC/RGN-III/DRP/RPB3 |
---|
To: |
|
---|
References |
---|
Download: ML071560306 (5) |
|
Similar Documents at Byron |
---|
Category:Meeting Summary
MONTHYEARML24170A8392024-06-18018 June 2024 June 12, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Byron Station, Units 1 and 2 ML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24009A0552024-01-24024 January 2024 Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML24018A1772024-01-19019 January 2024 Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw ML23362A0042024-01-0202 January 2024 Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23129A0202023-05-30030 May 2023 Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22305A5992022-11-10010 November 2022 Summary of Closed Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Transition to Framatome Fuel ML22159A2232022-06-0909 June 2022 Summary of the June 2, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 ML22115A2122022-05-12012 May 2022 Summary of April 11, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding a Future Amendment to Place One High Burnup Lead Test Assembly Into the Byron, Unit 2, Reactor ML22111A2852022-05-0909 May 2022 Summary of April 4, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (EPIDs L-2022-LLR-0035/36) ML22111A3362022-05-0909 May 2022 Summary of April 7, 2022, Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (Epids L-2022-LRR-0035 and 0036) ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21167A2152021-06-16016 June 2021 June 8, 2021, Summary of the Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML21147A4262021-06-0303 June 2021 Summary of May 12, 2021, Meeting with Exelon Generation Company, Llc, Related to a Planned License Amendment to Modify the Ultimate Heat Sink Technical Specifications ML21033A6582021-02-0404 February 2021 Summary of October 13, 2020, Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Post Shutdown Emergency Plan Staffing to Support the Planned Early Closures ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20280A2482020-10-0707 October 2020 Summary of September 22, 2020, Presubmittal Meeting Between the NRC and Exelon Generation Company LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Units 1 and 2 and Dresden, Units 2 and 3 ML20171A3812020-08-12012 August 2020 (COVID-19) Presubmittal Meeting Summary - Byron Unit 2 LAR - One-Time Extension of Steam Generator Tube Inspections ML20218A5302020-08-0505 August 2020 July 14, 2020, Summary of the Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML20108F0902019-04-20020 April 2019 April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18225A3042018-08-16016 August 2018 Summary of August 8, 2018, Meeting with Exelon Generation Company, LLC, on a Future Relief Request to Extend the Post Peening Follow-Up Inspections for Certain Reactor Pressure Vessel Head Penetrations ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18113A7052018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Byron Station ML18113A6592018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML17347B1022017-12-14014 December 2017 Summary of Meeting with Exelon Generation Company, LLC on Its Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response ML17296B1282017-11-0202 November 2017 Summary of Partially Closed Meeting to Discuss Exelon Lead Test Assembly Program for Byron Unit 2 of the Westinghouse Encore Accident Tolerant Fuel Product 2024-06-04
[Table view] |
Text
June 4, 2007 LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Units 1 and 2
SUBJECT:
SUMMARY
OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 8, 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at the Byron Station Training Center in Byron, IL. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRCs assessment of the safety performance of Byron Station, Units 1 and 2, for the period from January 1 through December 31, 2006. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML071100250 and ML071290248, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Byron Station, Units 1 and 2, in calendar year 2006, which was documented in the March 2, 2007, end-of-cycle assessment letter, as ML070610211. As part of this regulatory performance meeting, Exelon briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Sincerely,
/RA/
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosure:
As Stated
LICENSEE: Exelon Generation Company, LLC FACILITY: Byron, Units 1 and 2
SUBJECT:
SUMMARY
OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 8, 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at the Byron Station Training Center in Byron, IL. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRCs assessment of the safety performance of Byron Station, Units 1 and 2, for the period from January 1 through December 31, 2006. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML071100250 and ML071290248, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Byron Station, Units 1 and 2, in calendar year 2006, which was documented in the March 2, 2007, end-of-cycle assessment letter, as ML070610211. As part of this regulatory performance meeting, Exelon briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Sincerely, Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosure:
As Stated DISTRIBUTION:
See next page DOCUMENT NAME:C:\FileNet\ML071560306.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive
- See previous concurrence To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DLords*:dtp RSkokowski DATE 05/31/07 06/04/07 OFFICIAL RECORD COPY
Letter to Exelon Generation Company, LLC from Richard A. Skokowski dated June 4, 2007
SUBJECT:
SUMMARY
OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station President, Village of Leaf River President, Village of Davis Junction President, Village of Stillman Valley Ogle County Board Chairman Ogle County Sheriff/EMA Coordinator EMA Coordinator, Winnebago County Winnebago County Board Chair Winnebago County Sheriff/ESDA Mayor of Oregon Mayor of Byron President, Village of Mt. Morris Mayor of Rochelle INPO
Letter to Exelon Generation Company, LLC from Richard A. Skokowski dated June 4, 2007
SUBJECT:
SUMMARY
OF THE MAY 8, 2007, PUBLIC MEETING TO DISCUSS THE BYRON STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:
RAG1 TEB RFK RidsNrrDirslpab JLC1 GEG KGO RML2 SAM9 SRI Byron DRPIII DRSIII PLB1 TXN
Enclosure Meeting Participants NRC R. Skokowski, Chief, Branch 3, Division of Reactor Projects, Region III B. Bartlett, Senior Resident Inspector, Byron R. Ng, Resident Inspector, Byron D. Szwarc, Reactor Engineer, Region III Exelon Generation Company D. Hoots, Site Vice President M. Snow, Plant Manager W. Grundmann, Regulatory Assurance Manager T. Hulbert, Regulatory Assurance Specialist R. Kartheiser, Nuclear Communications R. Meyer, Training B. Stoermer, Training Illinois Emergency Management Agency R. Zuffa J. Roman