IR 05000458/2010301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:October 8, 2010 Michael Perito Vice President, Operations Entergy Operations, Inc.
{{#Wiki_filter:UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N ber 8, 2010


River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 SUBJECT: ERRATA FOR RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000458/2010301
==SUBJECT:==
ERRATA FOR RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000458/2010301


==Dear Mr. Perito:==
==Dear Mr. Perito:==
This errata corrects an administrative error in the original letter in that the licensing exam number was incorrect. Please replace the cover page with the enclosed revised page.
This errata corrects an administrative error in the original letter in that the licensing exam number was incorrect. Please replace the cover page with the enclosed revised page.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.


Sincerely,
Sincerely,
/RA/
/RA/
Mark Haire, Chief Operations Branch Division of Reactor Safety  
Mark Haire, Chief Operations Branch Division of Reactor Safety Docket: 50-458 License: NPF-47 cc:
Senior Vice President and COO Entergy Operations, Inc P. O. Box 31995 Jackson, MS 39286-1995


Docket: 50-458 License: NPF-47 cc: Senior Vice President and COO Entergy Operations, Inc P. O. Box 31995 Jackson, MS 39286-1995UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc. - 2 -
Entergy Operations, Inc. -2-Vice President, Oversight Entergy Operations, Inc.
Vice President, Oversight Entergy Operations, Inc. P. O. Box 31995 Jackson, MS 39286-1995


Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995  
P. O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.


Manager, Licensing Entergy Operations, Inc. 5485 US Highway 61N St. Francisville, LA 70775 Attorney General State of Louisiana P. O. Box 94005 Baton Rouge, LA 70804-9005 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Mr. Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 Austin, TX 78701-3326 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326 Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P. O. Box 4312 Baton Rouge, LA 70821-4312 Joseph A. Aluise Entergy Operations, Inc. - 3 -
5485 US Highway 61N St. Francisville, LA 70775 Attorney General State of Louisiana P. O. Box 94005 Baton Rouge, LA 70804-9005 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Mr. Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 Austin, TX 78701-3326 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326 Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P. O. Box 4312 Baton Rouge, LA 70821-4312 Joseph A. Aluise
Associate General Counsel - Nuclear Entergy Services, Inc. 639 Loyola Avenue New Orleans, LA 70113


Chief, Technological Hazards Branch FEMA Region VI 800 N. Loop 288 Denton, TX 76209-3606
Entergy Operations, Inc. -3-Associate General Counsel - Nuclear Entergy Services, Inc.


Entergy Operations, Inc. - 4 -
639 Loyola Avenue New Orleans, LA 70113 Chief, Technological Hazards Branch FEMA Region VI 800 N. Loop 288 Denton, TX 76209-3606
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Grant.Larkin@nrc.gov) Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov) Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov) Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Alan.Wang@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov)


ADAMS: No Yes SUNSI Review Complete Reviewer Initials: SMG Publicly Available Non-Sensitive Non-publicly Available Sensitive SOE:OB C:OB SGarchow MHaire /RA/ /RA/ 10/8/10 10/8/10 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax  
Entergy Operations, Inc.  -4-Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov)
ADAMS: No 6 Yes 6 SUNSI Review Complete Reviewer Initials: SMG 6 Publicly Available 6 Non-Sensitive Non-publicly Available Sensitive SOE:OB C:OB SGarchow MHaire
/RA/ /RA/
10/8/10 10/8/10 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax


- 1 - Enclosure August 23, 2010 Vice President, Operations Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 SUBJECT: River Bend Station - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000458/2010302
UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N ust 23, 2010
 
==SUBJECT:==
River Bend Station - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000458/2010302


==Dear Mr. Perito:==
==Dear Mr. Perito:==
In a telephone conversation on June 21, 2010, between Ms. Angie Angeron, Operations Senior Staff Instructor, and Steve Garchow, Chief Examiner, arrangements were made for the administration of licensing examinations at the River Bend Station during the weeks of December 6 and December 13, 2010.
In a telephone conversation on June 21, 2010, between Ms. Angie Angeron, Operations Senior Staff Instructor, and Steve Garchow, Chief Examiner, arrangements were made for the administration of licensing examinations at the River Bend Station during the weeks of December 6 and December 13, 2010.


As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
 
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 13, 2010. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by October 12, 2010.
 
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.


To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 13, 2010. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by October 12, 2010. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for onsite validation of the examinations is required during the week of October 25, 2010.
All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for onsite validation of the examinations is required during the week of October 25, 2010.


UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
-1-  Enclosure
}}
}}

Latest revision as of 13:19, 13 November 2019

Errata for River Bend, Notification of NRC Initial Operator Licensing Examination 05000458/10-301
ML102810695
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/08/2010
From: Mark Haire
Operations Branch IV
To: Mike Perito
Entergy Operations
References
50-458/10-301
Download: ML102810695 (5)


Text

UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N ber 8, 2010

SUBJECT:

ERRATA FOR RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000458/2010301

Dear Mr. Perito:

This errata corrects an administrative error in the original letter in that the licensing exam number was incorrect. Please replace the cover page with the enclosed revised page.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Mark Haire, Chief Operations Branch Division of Reactor Safety Docket: 50-458 License: NPF-47 cc:

Senior Vice President and COO Entergy Operations, Inc P. O. Box 31995 Jackson, MS 39286-1995

Entergy Operations, Inc. -2-Vice President, Oversight Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.

5485 US Highway 61N St. Francisville, LA 70775 Attorney General State of Louisiana P. O. Box 94005 Baton Rouge, LA 70804-9005 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Mr. Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 Austin, TX 78701-3326 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326 Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P. O. Box 4312 Baton Rouge, LA 70821-4312 Joseph A. Aluise

Entergy Operations, Inc. -3-Associate General Counsel - Nuclear Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Chief, Technological Hazards Branch FEMA Region VI 800 N. Loop 288 Denton, TX 76209-3606

Entergy Operations, Inc. -4-Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov)

ADAMS: No 6 Yes 6 SUNSI Review Complete Reviewer Initials: SMG 6 Publicly Available 6 Non-Sensitive Non-publicly Available Sensitive SOE:OB C:OB SGarchow MHaire

/RA/ /RA/

10/8/10 10/8/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N ust 23, 2010

SUBJECT:

River Bend Station - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000458/2010302

Dear Mr. Perito:

In a telephone conversation on June 21, 2010, between Ms. Angie Angeron, Operations Senior Staff Instructor, and Steve Garchow, Chief Examiner, arrangements were made for the administration of licensing examinations at the River Bend Station during the weeks of December 6 and December 13, 2010.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 13, 2010. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by October 12, 2010.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for onsite validation of the examinations is required during the week of October 25, 2010.

-1- Enclosure