PROPOSED OUTLINE COMMENTS Facility: River Bend Station First Exam Date: February 8, 2021 Written Exam Outline Comment Resolution 1 NRC Generated 2 No additional comments Administrative JPM Outline Comment Resolution Loss of Feedwater Heating event. Those are supplemental actions only taken Applicant must utilize AOP-7 and AOP- by or directed by the CRS. Only immediate 24 to determine placement on the actions taken by ROs 1 Power to Flow Map. CRS must actions taken IAW AOP-24. What specifically makes this at the SRO level?

All Admin JPMs are new will need to N/A 2 evaluate when draft submittal is received Control Room / In-Plant System JPM Outline Comment Resolution 1 No Comments Simulator Scenario Outline Comments Comment Resolution 1 Scenario 1, skipped an event number fix 2 Scenario 1, Need basis for CT-1 Will provide with draft submittal Scenario 2, CT-2 needs better bounding Working with ops to determine better 3 criteria. Prefer not to have do X prior to bounding criteria exiting procedure Y Scenario 3, CT-1 needs to be Working with OPS to determine 4 determined what the criteria will be to determine if the threshold is met or not.

Scenario 2, CT-2 see comment 3 Working with ops to determine better 5

bounding criteria OBDI 202 - IOLE Process Rev 3