ML22354A258
From kanterella
Jump to navigation
Jump to search
ML22354A258 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 12/15/2022 |
From: | Heather Gepford NRC/RGN-IV/DORS/OB |
To: | Entergy Operations |
References | |
Download: ML22354A258 (1) | |
Similar Documents at River Bend | |
---|---|
Category:License-Operator
MONTHYEARIR 05000458/20213012024-11-14014 November 2024
[Table view]NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 ML21106A1512021-04-16016 April 2021 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML21088A2032021-02-12012 February 2021 RBS 2021-02 Final SRO Written Exam ML21088A2022021-02-12012 February 2021 RBS 2021-02 Final RO Written Exam ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20010D1432019-11-26026 November 2019 2019-11-DRAFT Written Examination Comments ML20010D1482019-11-26026 November 2019 2019-11-FINAL Outlines ML20010D1422019-11-26026 November 2019 2019-11-DRAFT Outlines ML20010D1402019-11-26026 November 2019 2019-11-DRAFT Operating Test ML20010D1412019-11-26026 November 2019 2019-11-DRAFT Outline Comments ML20006C4132019-11-26026 November 2019 2019-11-FINAL Written Examination ML20010D1392019-11-26026 November 2019 2019-11-DRAFT Operating Test Comments ML20010D1442019-11-26026 November 2019 2019-11-Draft Written Examination ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package 2024-04-02 Category:Part 55 Examination Related Material MONTHYEARIR 05000458/20213012024-11-14014 November 2024
[Table view]NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21106A1512021-04-16016 April 2021 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21088A2032021-02-12012 February 2021 RBS 2021-02 Final SRO Written Exam ML21088A2022021-02-12012 February 2021 RBS 2021-02 Final RO Written Exam ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20010D1422019-11-26026 November 2019 2019-11-DRAFT Outlines ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20010D1412019-11-26026 November 2019 2019-11-DRAFT Outline Comments ML20010D1482019-11-26026 November 2019 2019-11-FINAL Outlines ML20010D1392019-11-26026 November 2019 2019-11-DRAFT Operating Test Comments ML20010D1402019-11-26026 November 2019 2019-11-DRAFT Operating Test ML20010D1432019-11-26026 November 2019 2019-11-DRAFT Written Examination Comments ML20010D1442019-11-26026 November 2019 2019-11-Draft Written Examination ML20006C4132019-11-26026 November 2019 2019-11-FINAL Written Examination ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam 2024-04-02 |
Text
RB-2022, Written Exam Analysis The class consisted of 12 students (8 ROs, 2 Upgrade SROs and 2 Instant SROs).
Question 67 6/12 missed RBS has reviewed the question and believes it to be valid and has only one correct answer. This K/A was presented during the training program.
High missed question due to students attention to detail and level of knowledge.
Students were weak on maximum amount of time before the Change Notice (CN) should be incorporated in accordance with RBNP-001. Most students confused the 180 day requirement with 14 days which is the time required to receive all reviews for approval on the Change Notice (CN). The requirement for incorporating is 180 days from the final approval.
Retrieved from "https://kanterella.com/w/index.php?title=ML22354A258&oldid=3786162"