MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting 2024-09-24
[Table view] Category:License-Operator Examination Report
MONTHYEARML22314A1382022-11-23023 November 2022 Nrc Initial Operator Licensing Examination Approval 05000458/2022301 IR 05000458/20193012020-01-15015 January 2020 NRC Examination Report 05000458/2019301 IR 05000458/20163012016-10-17017 October 2016 NRC Examination Report 05000458/2016301 IR 05000458/20153012015-08-13013 August 2015 Er 05000458/2015301; on 06/19/2015 - 07/16/2015; River Bend Station; Initial Operator Licensing Retake Examination Report ML15037A2642015-02-0606 February 2015 Notification of NRC Initial Operator Licensing Retake Examination 05000458/2015301 IR 05000458/20143022015-01-12012 January 2015 Er 05000458/2014302; on 11/03/2014 - 01/08/2015; River Bend Station; Initial Operator Licensing Examination Report IR 05000458/20143012014-05-12012 May 2014 Er 05000458-14-301; on 03/24/2014 - 04/28/2014; River Bend Station; Initial Operator Licensing Examination Report IR 05000458/20123012012-12-18018 December 2012 Er 05000458-12-301, 11/08-30/2012, River Bend Station, Initial Operator Licensing Examination Report IR 05000458/20103022011-01-24024 January 2011 Er 05000458-10-302; December 2 - 22, 2010, River Bend Station, Initial Operator Licensing Examination Report ML1016105772010-06-0808 June 2010 NRC Examination Report 50-458/10-301 IR 05000458/20083012009-01-22022 January 2009 Er 05000458-08-301; November 21-December 15, 2008; River Bend Station; Initial Operator Licensing Examination Report ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination 2022-11-23
[Table view] |
Text
UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N ary 24, 2011
SUBJECT:
RIVER BEND STATION - NRC EXAMINATION REPORT 05000458/2010302
Dear Mr. Perito:
On December 10, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at the River Bend Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on December 9, 2010, with yourself, Mr. Eric Olsen, General Manager - Plant Operations, Mr. Marvin Chase, Manager - Training and Development, and other members of your staff. A telephonic exit meeting was conducted on December 22, 2010 with Mr. John Fralic, Initial Licensed Operator Training Supervisor, who was provided the NRC licensing decisions.
The examination included the evaluation of six applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses, and two applicants for upgrade senior reactor operator licenses. The license examiners determined that 11 of the 14 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
There were two post examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 summarizes post examination comment resolution.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark S. Haire, Chief Operations Branch Division of Reactor Safety
Entergy Operations, Inc.
-2-Docket: 50 - 458 License: NPF - 47
Enclosure:
1. NRC Examination Report 05000458/2010302 2. NRC Post Examination Comment Resolution
REGION IV==
Docket: 50-458 License: NPF-47 Report: 05000458/2010302 Licensee: Entergy, Inc.
Facility: River Bend Station 5485 US Highway 61N Location:
St. Francisville, LA 70775 Dates: December 2 - 22, 2010 Inspectors: S. Garchow, Chief Examiner, Senior Operations Engineer C. Osterholtz, Senior Operations Engineer K. Clayton, Senior Operations Engineer B. Tindell, Resident Inspector Approved By: Mark Haire, Chief Operations Branch Division of Reactor Safety 1 Enclosure 1
SUMMARY OF FINDINGS
ER 05000458/2010302; December 2 - 22, 2010, River Bend Station, Initial Operator Licensing
Examination Report.
NRC examiners evaluated the competency of six applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses and two applicants for upgrade senior reactor operator licenses at the River Bend Station.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on December 2, 2010. NRC examiners administered the operating tests on December 6 - 10, 2010.
The examiners determined that 11 of the 14 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
None.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. Examiners also audited five of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
b. Findings
No findings were identified.
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On December 2, 2010, the licensee proctored the administration of the written examinations to all 14 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis and post examination comments to the NRC on December 10, 2010.
The NRC examination team administered the various portions of the operating tests to all applicants on December 6 - 10, 2010.
b. Findings
No findings were identified.
Eleven of the 14 applicants passed the written examination and all parts of the operating test. The final written examinations and post examination analysis and comments may be accessed in the ADAMS system under the accession numbers noted in the attachment.
The examination team noted the following generic weaknesses during the operating test: 1) The applicants generally did not acknowledge annunciators and this resulted in some significant annunciators being missed. 2) Three of four applicants were unable to successfully control reactor pressure vessel water level during an Anticipated Transient Without Scram (ATWS). 3) Two of four applicants did not understand why the feedwater regulating valves locked up when being operated in manual control nor did they know how to reset the lockouts once they occurred. As a result, one of the crews had to perform an unnecessary emergency depressurization during an ATWS. This specific knowledge deficiency was a contributor to the previous generic weakness comment. 4) Three of four Senior Reactor Operator applicants did not enter Technical Specification 3.6.1.7, Containment Cooling, due to a misconception of the safety related qualifications of Containment Unit Cooler C. 5) The majority of the applicants experienced difficulty in determining the status of, and locking out, the pumps controlled from the Harris Panel on H13-P808 while performing a job performance measure involving the restoration of off-site power.
Copies of all individual examination reports were sent to the facility initial licensed operator training supervisor for evaluation and determination of appropriate remedial training.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the preliminary examination results to Messrs. Michael Perito, Vice President Operations, Mr. Eric Olsen, General Manager - Plant Operations, Mr. Marvin Chase, Manager - Training and Development, and other members of the staff on December 9, 2010. A telephonic exit was conducted on December 22, 2010, between Mr. Steve Garchow, Chief Examiner, and Mr. John Fralic, Initial Licensed Operator Training Supervisor.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- M. Chase, Manager - Training and Development
- J. Fralic, Supervisor - Initial Licensed Operator Training
- A. Bergeron, Nuclear Training Instructor
NRC Personnel
- G. Larkin, Senior Resident Inspector
- A. Barrett, Resident Inspector
ADAMS DOCUMENTS REFERENCED