ML17361A042

From kanterella
Jump to navigation Jump to search
Notification of NRC Initial Operator Licensing Examination 05000458/2018301
ML17361A042
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/26/2017
From: Vincent Gaddy
Operations Branch IV
To: Maguire W
Entergy Operations
References
50-458/OL-18-01
Download: ML17361A042 (3)


See also: IR 05000458/2018301

Text

December 26, 2017

Mr. William F. Maguire, Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000458/2018301

Dear Mr. Maguire:

In a telephone conversation on October 11, 2017, between Messrs. G. Krause, Facility

Representative, and B. Larson, Chief Examiner, arrangements were made for the administration

of licensing examinations at River Bend Station during the week of July 23, 2018.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 11, and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power

Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your

staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

examination outlines by February 23, 2018. The written examinations, operating tests, and

supporting reference materials identified in Attachment 3 to ES-201 will be due by May 9, 2018.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of June 18, 2018.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff shall retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

W. Maguire 2

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) by June 23, 2018. If the applications are

not received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted by

July 9, 2018.

This letter contains information collections that are subject to the Paperwork Reduction Act

of 1995 (44 U.S.C. 3501, et seq.). These information collections were approved by OMB,

under approval number 3150-0018, which expires on June 30, 2019. The public reporting

burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response,

including the time for reviewing instructions, gathering and maintaining the data needed, and

completing and reviewing the collection of information. Send comments on any aspect of this

collection of information, including suggestions for reducing the burden, to the Information and

Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer,

Office of Information and Regulatory Affairs, NEOB-10202 (3150-0018), Office of Management

and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Krause has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Larson at 817-200-1172 or myself at

817-200-1159.

Sincerely,

/Jeremy R. Groom Acting for/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-458

License No. NPF-47

cc: Electronic Distribution

ML17361A042

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: BLarson Yes No Publicly Available Sensitive NRC-002

OFFICE SOE:OB C:OB

NAME BLarson VGaddy

SIGNATURE /RA/ /RA/ JRG for

DATE 12/22/2017 12/26/2017