|
---|
Category:Letter
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting 2024-09-24
[Table view] Category:License-Operator
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 ML21106A1512021-04-16016 April 2021 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML21088A2032021-02-12012 February 2021 RBS 2021-02 Final SRO Written Exam ML21088A2022021-02-12012 February 2021 RBS 2021-02 Final RO Written Exam ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20010D1432019-11-26026 November 2019 2019-11-DRAFT Written Examination Comments ML20010D1482019-11-26026 November 2019 2019-11-FINAL Outlines ML20010D1422019-11-26026 November 2019 2019-11-DRAFT Outlines ML20010D1402019-11-26026 November 2019 2019-11-DRAFT Operating Test ML20010D1412019-11-26026 November 2019 2019-11-DRAFT Outline Comments ML20006C4132019-11-26026 November 2019 2019-11-FINAL Written Examination ML20010D1392019-11-26026 November 2019 2019-11-DRAFT Operating Test Comments ML20010D1442019-11-26026 November 2019 2019-11-Draft Written Examination ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21106A1512021-04-16016 April 2021 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21088A2032021-02-12012 February 2021 RBS 2021-02 Final SRO Written Exam ML21088A2022021-02-12012 February 2021 RBS 2021-02 Final RO Written Exam ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20010D1422019-11-26026 November 2019 2019-11-DRAFT Outlines ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20010D1412019-11-26026 November 2019 2019-11-DRAFT Outline Comments ML20010D1482019-11-26026 November 2019 2019-11-FINAL Outlines ML20010D1392019-11-26026 November 2019 2019-11-DRAFT Operating Test Comments ML20010D1402019-11-26026 November 2019 2019-11-DRAFT Operating Test ML20010D1432019-11-26026 November 2019 2019-11-DRAFT Written Examination Comments ML20010D1442019-11-26026 November 2019 2019-11-Draft Written Examination ML20006C4132019-11-26026 November 2019 2019-11-FINAL Written Examination ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam 2024-04-02
[Table view] |
See also: IR 05000458/2019301
Text
December 6, 2018
Mr. William F. Maguire, Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 U.S. Highway 61N
St. Francisville, LA 70775
SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR
LICENSING EXAMINATION 05000458/2019301
Dear Mr. Maguire:
In a meeting on November 28, 2018, between Messrs. G. Kimich, Initial Exam Lead, and J.
Kirkland, Chief Examiner, arrangements were made for the administration of licensing
examinations at River Bend Station during the week of November 18, 2019.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 11, and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power
Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your
staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
examination outlines by June 17, 2019. The written examinations, operating tests, and
supporting reference materials identified in Attachment 3 to ES-201 will be due by
September 2, 2019. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal
Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall
approve the outlines, examinations, and tests before they are submitted to the NRC for review
and approval. All materials shall be complete and ready-to-use. We request that any personal,
proprietary, sensitive unclassified, or safeguards information in your response be contained in a
separate enclosure and appropriately marked. Any delay in receiving the required examinations
and reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of October 21, 2019.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff shall retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
W. Maguire 2
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) by October 28, 2019. If the applications
are not received at least 30 days before the examination date, a postponement may be
necessary. Signed applications certifying that all training has been completed should be
submitted by November 4, 2019.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a
copy of this letter will be available electronically for public inspection in the NRCs Public
Document Room or from the Publicly Available Records (PARS) component of the NRCs
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the electronic Reading Room page of the NRCs public Web site at
http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Kimich has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Kirkland at 817-200-1771 or myself at
817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No.: 50-458
License No.: NPF-47
cc: Electronic Distribution to Riverbend Station
ML18340A089
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JKirkland Yes No Publicly Available Sensitive NRC-002
OFFICE SOE:OB C:OB
NAME JKirkland VGaddy
SIGNATURE /RA/ /RA/
DATE 12/04/18 12/06/18