IR 05000250/2012001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 4, 2013 Mr. Mano Nazar Executive Vice President and
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013


Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)


SUBJECT: ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)
==Dear Mr. Nazar:==
On February 13, 2013, the NRC completed its end-of-cycle performance review of Turkey Point Nuclear Plant Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.


==Dear Mr. Nazar:==
The NRC determined that overall, Turkey Point Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
On February 13, 2013, the NRC completed its end-of-cycle performance review of Turkey Point Nuclear Plant Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs y ou of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.


The NRC determined that overall, Turkey Point Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRC
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The NRC determined the performance at Turkey Point Nuclear Plant Unit 3 and Unit 4 during the first three quarters of the assessment period was within the Regulatory Response Column of the NRC's ROP Action Matrix because of one White finding in the Emergency Preparedness cornerstone. This finding was documented in a final significance determination and assessment follow-up letter issued by the NRC on April 9, 2012, as Inspection Report 05000250/20120010 and 05000251/20120010 (ML12100A243). On September 13, 2012, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001, and confirmed that you had adequately addressed the White finding. As a result, NRC determined the performance at Turkey Point Unit 3 and Unit 4 returned to the Licensee Response column of the ROP Action Matrix as of the fourth quarter of 2012. This inspection was documented in an inspection report and assessment follow-up letter issued by the NRC on October 22, 2012, as Inspection Report 05000250/2012012 and 05000251/2012012 (ML12297A405). The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
The NRC determined the performance at Turkey Point Nuclear Plant Unit 3 and Unit 4 during the first three quarters of the assessment period was within the Regulatory Response Column of the NRCs ROP Action Matrix because of one White finding in the Emergency Preparedness cornerstone. This finding was documented in a final significance determination and assessment follow-up letter issued by the NRC on April 9, 2012, as Inspection Report 05000250/20120010 and 05000251/20120010 (ML12100A243). On September 13, 2012, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001, and confirmed that you had adequately addressed the White finding. As a result, NRC determined the performance at Turkey Point Unit 3 and Unit 4 returned to the Licensee Response column of the ROP Action Matrix as of the fourth quarter of 2012. This inspection was documented in an inspection report and assessment follow-up letter issued by the NRC on October 22, 2012, as Inspection Report 05000250/2012012 and 05000251/2012012 (ML12297A405). The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.


We also plan on conducting two non-ROP inspections which include: Temporary Instruction (TI)
We also plan on conducting two non-ROP inspections which include: Temporary Instruction (TI)
2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, and an Initial Operator Licensing Exam.
2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, and an Initial Operator Licensing Exam.


In accordance with 10 CFR 2.390 of the NRC
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact Shane Sandal at (404) 997-4513 with any questions you may have regarding this letter.
Please contact Shane Sandal at (404) 997-4513 with any questions you may have regarding this letter.
Line 42: Line 41:
Sincerely,
Sincerely,
/RA/
/RA/
Richard P. Croteau, Director Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41  
Richard P. Croteau, Director Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure: Turkey Point Nuclear Plant Inspection/Activity Plan (03/01/2013 - 06/30/2014)
 
cc w/Encl: (See page 3)
Enclosure: Turkey Point Nuclear Plant Inspection/Activity Plan (03/01/2013 - 06/30/2014)  
 
cc w/Encl: (See page 3)  
 
_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE MJR /RA/ SRS /RA/ RPC /RA/ NAME MRiches SSandal WJones RCroteau DATE 02/20/2013 02/21/2013 02/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:
Alison Brown Nuclear Licensing
 
Florida Power & Light Company Electronic Mail Distribution
 
Larry Nicholson Director Licensing
 
Florida Power & Light Company Electronic Mail Distribution
 
Michael Kiley Site Vice President
 
Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Niel Batista Emergency Management Coordinator Department of Emergency Management and Homeland Security Electronic Mail Distribution Paul Freeman Vice President Organizational Effectiveness
 
Florida Power & Light Company Electronic Mail Distribution
 
Peter Wells Vice President
 
Outage Support CFAM
 
Florida Power & Light Company Electronic Mail Distribution
 
Robert J. Tomonto Licensing Manager
 
Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution
 
Eric McCartney
 
Plant General Manager
 
Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution
 
Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
 
Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050
 
James Petro Managing Attorney-Nuclear Florida Power & Light Company Electronic Mail Distribution
 
County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128
 
George Gretsas City Manager City of Homestead Electronic Mail Distribution Letter to Mano Nazar from Richard P. Croteau dated March 4, 2013 SUBJECT: ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)
 
Distribution w/encl
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS


PUBLIC RidsNrrPMTurkeyPoint Resource ROP Assessment Institute of Nuclear Power Operations (INPO)  
_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE MJR /RA/ SRS /RA/  RPC /RA/
NAME  MRiches SSandal WJones RCroteau DATE  02/20/2013 02/21/2013  02/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:  Cynthia Becker Alison Brown  (Acting) Chief Nuclear Licensing  Florida Bureau of Radiation Control Florida Power & Light Company Department of Health Electronic Mail Distribution Electronic Mail Distribution Larry Nicholson  Attorney General Director  Department of Legal Affairs Licensing  The Capitol PL-01 Florida Power & Light Company Tallahassee, FL 32399-1050 Electronic Mail Distribution James Petro Michael Kiley  Managing Attorney-Nuclear Site Vice President  Florida Power & Light Company Turkey Point Nuclear Plant Electronic Mail Distribution Florida Power and Light Company Electronic Mail Distribution County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Niel Batista  Miami, FL 33128 Emergency Management Coordinator Department of Emergency Management George Gretsas and Homeland Security  City Manager Electronic Mail Distribution City of Homestead Electronic Mail Distribution Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Eric McCartney Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Letter to Mano Nazar from Richard P. Croteau dated March 4, 2013 SUBJECT: ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)
Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROP Assessment Institute of Nuclear Power Operations (INPO)


Turkey Point Inspection / Activity Plan 03/01/2013-06/30/2014 Unit Number Page 1 of 2 03/04/2013 08:38:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 1 HS-TRIENNIAL HEAT SINK PERFORMANCE 3, 4 02/25/2013 03/01/2013 IP 7111107T Heat Sink Performance 4 RP-RP OCCUPATIONAL BASELINE 3, 4 02/25/2013 03/01/2013 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 02/25/2013 03/01/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 02/25/2013 03/01/2013 IP 71124.04 Occupational Dose Assessment 3, 4 02/25/2013 03/01/2013 IP 71124.05 Radiation Monitoring Instrumentation 3 OL EXAM-INITIAL EXAM - WEEK 1 3 03/04/2013 03/08/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES 2 OL EXAM-INITIAL EXAM - WEEK 2 3 03/11/2013 03/15/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES 1 EP-EMERGENCY PREPAREDNESS EXERCISE 3, 4 06/17/2013 06/21/2013 IP 7111401 Exercise Evaluation 3, 4 06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification 5 TFPI-TRIENNIAL FIRE PROTECTION INSP 3, 4 06/10/2013 06/14/2013 IP 7111105T Fire Protection [Triennial]
Page 1 of 2      Turkey Point 03/04/2013 08:38:01    Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates          No. of Staff Number Start End Inspection Activity     Title   on Site HS - TRIENNIAL HEAT SINK PERFORMANCE     1 3, 4 02/25/2013 03/01/2013 IP 7111107T Heat Sink Performance RP - RP OCCUPATIONAL BASELINE       4 3, 4 02/25/2013 03/01/2013 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 02/25/2013 03/01/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 02/25/2013 03/01/2013 IP 71124.04 Occupational Dose Assessment 3, 4 02/25/2013 03/01/2013 IP 71124.05 Radiation Monitoring Instrumentation OL EXAM - INITIAL EXAM - WEEK 1       3 3 03/04/2013 03/08/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2      2 3 03/11/2013 03/15/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES EP - EMERGENCY PREPAREDNESS EXERCISE     1 3, 4 06/17/2013 06/21/2013 IP 7111401 Exercise Evaluation 3, 4 06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification TFPI - TRIENNIAL FIRE PROTECTION INSP     5 3, 4 06/10/2013 06/14/2013 IP 7111105T Fire Protection [Triennial]
3, 4 06/24/2013 06/28/2013 IP 7111105T Fire Protection [Triennial]
3, 4 06/24/2013 06/28/2013 IP 7111105T Fire Protection [Triennial]
2 RP-RAD HAZARDS ASSESSMENT 3, 4 08/05/2013 08/09/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification 2 OL-RQ-REQUAL INSP 3, 4 09/16/2013 09/23/2013 IP 7111111B Licensed Operator Requalification Program 1 TI-182-TI-182 BURIED PIPING/TANK - PHASE 2 3, 4 11/25/2013 11/27/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 1 ISI-UNIT 3 IN-SERVICE INSPECTION 3 01/13/2014 01/17/2014 IP 7111108P Inservice Inspection Activities - PWR 4 RP-RP PUBLIC RADIATION SAFETY BASELINE 3, 4 01/13/2014 01/17/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 01/13/2014 01/17/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 01/13/2014 01/17/2014 IP 71124.07 Radiological Environmental Monitoring Program 3, 4 01/13/2014 01/17/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 01/13/2014 01/17/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
RP - RAD HAZARDS ASSESSMENT       2 3, 4 08/05/2013 08/09/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification OL-RQ - REQUAL INSP       2 3, 4 09/16/2013 09/23/2013 IP 7111111B Licensed Operator Requalification Program TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2     1 3, 4 11/25/2013 11/27/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping ISI - UNIT 3 IN-SERVICE INSPECTION       1 3 01/13/2014 01/17/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP PUBLIC RADIATION SAFETY BASELINE     4 3, 4 01/13/2014 01/17/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 01/13/2014 01/17/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 01/13/2014 01/17/2014 IP 71124.07 Radiological Environmental Monitoring Program 3, 4 01/13/2014 01/17/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 01/13/2014 01/17/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.       Enclosure


Turkey Point Inspection / Activity Plan 03/01/2013-06/30/2014 Unit Number Page 2 of 2 03/04/2013 08:38:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 1 SGISI-UNIT 3 SG IN-SERVICE INSPECTION 3 01/20/2014 01/24/2014 IP 7111108P Inservice Inspection Activities - PWR 1 EP-EP PROGRAM INSPECTION 3, 4 02/03/2014 02/07/2014 IP 7111402 A lert and Notification System Testing 3, 4 02/03/2014 02/07/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3, 4 02/03/2014 02/07/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/03/2014 02/07/2014 IP 71151 Performance Indicator Verification 6 CDBI-COMPONENT DESIGN BASES INSPECTION 3, 4 03/03/2014 03/07/2014 IP 7111121 Component Design Bases Inspection 3, 4 03/24/2014 03/28/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/07/2014 04/11/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/21/2014 04/25/2014 IP 7111121 Component Design Bases Inspection Comments: This report does not include INPO and OUTAGE activities.
Page 2 of 2      Turkey Point 03/04/2013 08:38:01    Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates        No. of Staff Number Start End Inspection Activity   Title on Site SGISI - UNIT 3 SG IN-SERVICE INSPECTION   1 3 01/20/2014 01/24/2014 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION     1 3, 4 02/03/2014 02/07/2014 IP 7111402 Alert and Notification System Testing 3, 4 02/03/2014 02/07/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3, 4 02/03/2014 02/07/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/03/2014 02/07/2014 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION   6 3, 4 03/03/2014 03/07/2014 IP 7111121 Component Design Bases Inspection 3, 4 03/24/2014 03/28/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/07/2014 04/11/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/21/2014 04/25/2014 IP 7111121 Component Design Bases Inspection Comments:
This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures. Enclosure
}}
}}

Latest revision as of 21:26, 4 November 2019

Annual Assessment Letter for Turkey Point Nuclear Plant, Units 3 & 4 (IR 05000250-12-001 and 05000251-12-001)
ML13063A477
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/04/2013
From: Croteau R
Division Reactor Projects II
To: Nazar M
Florida Power & Light Co
References
IR-12-001
Download: ML13063A477 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)

Dear Mr. Nazar:

On February 13, 2013, the NRC completed its end-of-cycle performance review of Turkey Point Nuclear Plant Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Turkey Point Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The NRC determined the performance at Turkey Point Nuclear Plant Unit 3 and Unit 4 during the first three quarters of the assessment period was within the Regulatory Response Column of the NRCs ROP Action Matrix because of one White finding in the Emergency Preparedness cornerstone. This finding was documented in a final significance determination and assessment follow-up letter issued by the NRC on April 9, 2012, as Inspection Report 05000250/20120010 and 05000251/20120010 (ML12100A243). On September 13, 2012, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001, and confirmed that you had adequately addressed the White finding. As a result, NRC determined the performance at Turkey Point Unit 3 and Unit 4 returned to the Licensee Response column of the ROP Action Matrix as of the fourth quarter of 2012. This inspection was documented in an inspection report and assessment follow-up letter issued by the NRC on October 22, 2012, as Inspection Report 05000250/2012012 and 05000251/2012012 (ML12297A405). The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

We also plan on conducting two non-ROP inspections which include: Temporary Instruction (TI)

2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, and an Initial Operator Licensing Exam.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Shane Sandal at (404) 997-4513 with any questions you may have regarding this letter.

Sincerely,

/RA/

Richard P. Croteau, Director Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure: Turkey Point Nuclear Plant Inspection/Activity Plan (03/01/2013 - 06/30/2014)

cc w/Encl: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE MJR /RA/ SRS /RA/ RPC /RA/

NAME MRiches SSandal WJones RCroteau DATE 02/20/2013 02/21/2013 02/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl: Cynthia Becker Alison Brown (Acting) Chief Nuclear Licensing Florida Bureau of Radiation Control Florida Power & Light Company Department of Health Electronic Mail Distribution Electronic Mail Distribution Larry Nicholson Attorney General Director Department of Legal Affairs Licensing The Capitol PL-01 Florida Power & Light Company Tallahassee, FL 32399-1050 Electronic Mail Distribution James Petro Michael Kiley Managing Attorney-Nuclear Site Vice President Florida Power & Light Company Turkey Point Nuclear Plant Electronic Mail Distribution Florida Power and Light Company Electronic Mail Distribution County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Niel Batista Miami, FL 33128 Emergency Management Coordinator Department of Emergency Management George Gretsas and Homeland Security City Manager Electronic Mail Distribution City of Homestead Electronic Mail Distribution Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Eric McCartney Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Letter to Mano Nazar from Richard P. Croteau dated March 4, 2013 SUBJECT: ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)

Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Turkey Point 03/04/2013 08:38:01 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site HS - TRIENNIAL HEAT SINK PERFORMANCE 1 3, 4 02/25/2013 03/01/2013 IP 7111107T Heat Sink Performance RP - RP OCCUPATIONAL BASELINE 4 3, 4 02/25/2013 03/01/2013 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 02/25/2013 03/01/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 02/25/2013 03/01/2013 IP 71124.04 Occupational Dose Assessment 3, 4 02/25/2013 03/01/2013 IP 71124.05 Radiation Monitoring Instrumentation OL EXAM - INITIAL EXAM - WEEK 1 3 3 03/04/2013 03/08/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 2 3 03/11/2013 03/15/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES EP - EMERGENCY PREPAREDNESS EXERCISE 1 3, 4 06/17/2013 06/21/2013 IP 7111401 Exercise Evaluation 3, 4 06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification TFPI - TRIENNIAL FIRE PROTECTION INSP 5 3, 4 06/10/2013 06/14/2013 IP 7111105T Fire Protection [Triennial]

3, 4 06/24/2013 06/28/2013 IP 7111105T Fire Protection [Triennial]

RP - RAD HAZARDS ASSESSMENT 2 3, 4 08/05/2013 08/09/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification OL-RQ - REQUAL INSP 2 3, 4 09/16/2013 09/23/2013 IP 7111111B Licensed Operator Requalification Program TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 3, 4 11/25/2013 11/27/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 01/13/2014 01/17/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP PUBLIC RADIATION SAFETY BASELINE 4 3, 4 01/13/2014 01/17/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 01/13/2014 01/17/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 01/13/2014 01/17/2014 IP 71124.07 Radiological Environmental Monitoring Program 3, 4 01/13/2014 01/17/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 01/13/2014 01/17/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Turkey Point 03/04/2013 08:38:01 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site SGISI - UNIT 3 SG IN-SERVICE INSPECTION 1 3 01/20/2014 01/24/2014 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION 1 3, 4 02/03/2014 02/07/2014 IP 7111402 Alert and Notification System Testing 3, 4 02/03/2014 02/07/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3, 4 02/03/2014 02/07/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/03/2014 02/07/2014 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 6 3, 4 03/03/2014 03/07/2014 IP 7111121 Component Design Bases Inspection 3, 4 03/24/2014 03/28/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/07/2014 04/11/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/21/2014 04/25/2014 IP 7111121 Component Design Bases Inspection Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure