|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 4, 2013 Mr. Mano Nazar Executive Vice President and | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013 |
|
| |
|
| Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
| | ==SUBJECT:== |
| | ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001) |
|
| |
|
| SUBJECT: ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)
| | ==Dear Mr. Nazar:== |
| | On February 13, 2013, the NRC completed its end-of-cycle performance review of Turkey Point Nuclear Plant Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. |
|
| |
|
| ==Dear Mr. Nazar:==
| | The NRC determined that overall, Turkey Point Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). |
| On February 13, 2013, the NRC completed its end-of-cycle performance review of Turkey Point Nuclear Plant Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs y ou of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
| |
|
| |
|
| The NRC determined that overall, Turkey Point Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRC
| | Therefore, the NRC plans to conduct ROP baseline inspections at your facility. |
| =s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
| |
|
| |
|
| The NRC determined the performance at Turkey Point Nuclear Plant Unit 3 and Unit 4 during the first three quarters of the assessment period was within the Regulatory Response Column of the NRC's ROP Action Matrix because of one White finding in the Emergency Preparedness cornerstone. This finding was documented in a final significance determination and assessment follow-up letter issued by the NRC on April 9, 2012, as Inspection Report 05000250/20120010 and 05000251/20120010 (ML12100A243). On September 13, 2012, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001, and confirmed that you had adequately addressed the White finding. As a result, NRC determined the performance at Turkey Point Unit 3 and Unit 4 returned to the Licensee Response column of the ROP Action Matrix as of the fourth quarter of 2012. This inspection was documented in an inspection report and assessment follow-up letter issued by the NRC on October 22, 2012, as Inspection Report 05000250/2012012 and 05000251/2012012 (ML12297A405). The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | | The NRC determined the performance at Turkey Point Nuclear Plant Unit 3 and Unit 4 during the first three quarters of the assessment period was within the Regulatory Response Column of the NRCs ROP Action Matrix because of one White finding in the Emergency Preparedness cornerstone. This finding was documented in a final significance determination and assessment follow-up letter issued by the NRC on April 9, 2012, as Inspection Report 05000250/20120010 and 05000251/20120010 (ML12100A243). On September 13, 2012, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001, and confirmed that you had adequately addressed the White finding. As a result, NRC determined the performance at Turkey Point Unit 3 and Unit 4 returned to the Licensee Response column of the ROP Action Matrix as of the fourth quarter of 2012. This inspection was documented in an inspection report and assessment follow-up letter issued by the NRC on October 22, 2012, as Inspection Report 05000250/2012012 and 05000251/2012012 (ML12297A405). The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. |
|
| |
|
| We also plan on conducting two non-ROP inspections which include: Temporary Instruction (TI) | | We also plan on conducting two non-ROP inspections which include: Temporary Instruction (TI) |
| 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, and an Initial Operator Licensing Exam. | | 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, and an Initial Operator Licensing Exam. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC | | In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| =s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |
|
| |
|
| Please contact Shane Sandal at (404) 997-4513 with any questions you may have regarding this letter. | | Please contact Shane Sandal at (404) 997-4513 with any questions you may have regarding this letter. |
Line 42: |
Line 41: |
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
| Richard P. Croteau, Director Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 | | Richard P. Croteau, Director Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure: Turkey Point Nuclear Plant Inspection/Activity Plan (03/01/2013 - 06/30/2014) |
| | | cc w/Encl: (See page 3) |
| Enclosure: Turkey Point Nuclear Plant Inspection/Activity Plan (03/01/2013 - 06/30/2014) | |
| | |
| cc w/Encl: (See page 3) | |
| | |
| _________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE MJR /RA/ SRS /RA/ RPC /RA/ NAME MRiches SSandal WJones RCroteau DATE 02/20/2013 02/21/2013 02/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:
| |
| Alison Brown Nuclear Licensing
| |
| | |
| Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| Larry Nicholson Director Licensing
| |
| | |
| Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| Michael Kiley Site Vice President
| |
| | |
| Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Niel Batista Emergency Management Coordinator Department of Emergency Management and Homeland Security Electronic Mail Distribution Paul Freeman Vice President Organizational Effectiveness
| |
| | |
| Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| Peter Wells Vice President
| |
| | |
| Outage Support CFAM
| |
| | |
| Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| Robert J. Tomonto Licensing Manager
| |
| | |
| Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| Eric McCartney
| |
| | |
| Plant General Manager
| |
| | |
| Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution
| |
| | |
| Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
| |
| | |
| Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050
| |
| | |
| James Petro Managing Attorney-Nuclear Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128
| |
| | |
| George Gretsas City Manager City of Homestead Electronic Mail Distribution Letter to Mano Nazar from Richard P. Croteau dated March 4, 2013 SUBJECT: ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)
| |
| | |
| Distribution w/encl
| |
| : C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS
| |
|
| |
|
| PUBLIC RidsNrrPMTurkeyPoint Resource ROP Assessment Institute of Nuclear Power Operations (INPO) | | _________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE MJR /RA/ SRS /RA/ RPC /RA/ |
| | NAME MRiches SSandal WJones RCroteau DATE 02/20/2013 02/21/2013 02/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl: Cynthia Becker Alison Brown (Acting) Chief Nuclear Licensing Florida Bureau of Radiation Control Florida Power & Light Company Department of Health Electronic Mail Distribution Electronic Mail Distribution Larry Nicholson Attorney General Director Department of Legal Affairs Licensing The Capitol PL-01 Florida Power & Light Company Tallahassee, FL 32399-1050 Electronic Mail Distribution James Petro Michael Kiley Managing Attorney-Nuclear Site Vice President Florida Power & Light Company Turkey Point Nuclear Plant Electronic Mail Distribution Florida Power and Light Company Electronic Mail Distribution County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Niel Batista Miami, FL 33128 Emergency Management Coordinator Department of Emergency Management George Gretsas and Homeland Security City Manager Electronic Mail Distribution City of Homestead Electronic Mail Distribution Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Eric McCartney Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Letter to Mano Nazar from Richard P. Croteau dated March 4, 2013 SUBJECT: ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001) |
| | Distribution w/encl: |
| | C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROP Assessment Institute of Nuclear Power Operations (INPO) |
|
| |
|
| Turkey Point Inspection / Activity Plan 03/01/2013-06/30/2014 Unit Number Page 1 of 2 03/04/2013 08:38:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 1 HS-TRIENNIAL HEAT SINK PERFORMANCE 3, 4 02/25/2013 03/01/2013 IP 7111107T Heat Sink Performance 4 RP-RP OCCUPATIONAL BASELINE 3, 4 02/25/2013 03/01/2013 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 02/25/2013 03/01/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 02/25/2013 03/01/2013 IP 71124.04 Occupational Dose Assessment 3, 4 02/25/2013 03/01/2013 IP 71124.05 Radiation Monitoring Instrumentation 3 OL EXAM-INITIAL EXAM - WEEK 1 3 03/04/2013 03/08/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES 2 OL EXAM-INITIAL EXAM - WEEK 2 3 03/11/2013 03/15/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES 1 EP-EMERGENCY PREPAREDNESS EXERCISE 3, 4 06/17/2013 06/21/2013 IP 7111401 Exercise Evaluation 3, 4 06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification 5 TFPI-TRIENNIAL FIRE PROTECTION INSP 3, 4 06/10/2013 06/14/2013 IP 7111105T Fire Protection [Triennial] | | Page 1 of 2 Turkey Point 03/04/2013 08:38:01 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site HS - TRIENNIAL HEAT SINK PERFORMANCE 1 3, 4 02/25/2013 03/01/2013 IP 7111107T Heat Sink Performance RP - RP OCCUPATIONAL BASELINE 4 3, 4 02/25/2013 03/01/2013 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 02/25/2013 03/01/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 02/25/2013 03/01/2013 IP 71124.04 Occupational Dose Assessment 3, 4 02/25/2013 03/01/2013 IP 71124.05 Radiation Monitoring Instrumentation OL EXAM - INITIAL EXAM - WEEK 1 3 3 03/04/2013 03/08/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 2 3 03/11/2013 03/15/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES EP - EMERGENCY PREPAREDNESS EXERCISE 1 3, 4 06/17/2013 06/21/2013 IP 7111401 Exercise Evaluation 3, 4 06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification TFPI - TRIENNIAL FIRE PROTECTION INSP 5 3, 4 06/10/2013 06/14/2013 IP 7111105T Fire Protection [Triennial] |
| 3, 4 06/24/2013 06/28/2013 IP 7111105T Fire Protection [Triennial] | | 3, 4 06/24/2013 06/28/2013 IP 7111105T Fire Protection [Triennial] |
| 2 RP-RAD HAZARDS ASSESSMENT 3, 4 08/05/2013 08/09/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification 2 OL-RQ-REQUAL INSP 3, 4 09/16/2013 09/23/2013 IP 7111111B Licensed Operator Requalification Program 1 TI-182-TI-182 BURIED PIPING/TANK - PHASE 2 3, 4 11/25/2013 11/27/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 1 ISI-UNIT 3 IN-SERVICE INSPECTION 3 01/13/2014 01/17/2014 IP 7111108P Inservice Inspection Activities - PWR 4 RP-RP PUBLIC RADIATION SAFETY BASELINE 3, 4 01/13/2014 01/17/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 01/13/2014 01/17/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 01/13/2014 01/17/2014 IP 71124.07 Radiological Environmental Monitoring Program 3, 4 01/13/2014 01/17/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 01/13/2014 01/17/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
| | RP - RAD HAZARDS ASSESSMENT 2 3, 4 08/05/2013 08/09/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification OL-RQ - REQUAL INSP 2 3, 4 09/16/2013 09/23/2013 IP 7111111B Licensed Operator Requalification Program TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 3, 4 11/25/2013 11/27/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 01/13/2014 01/17/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP PUBLIC RADIATION SAFETY BASELINE 4 3, 4 01/13/2014 01/17/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 01/13/2014 01/17/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 01/13/2014 01/17/2014 IP 71124.07 Radiological Environmental Monitoring Program 3, 4 01/13/2014 01/17/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 01/13/2014 01/17/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. |
|
| |
|
| This report shows only on-site and announced inspection procedures. | | This report shows only on-site and announced inspection procedures. Enclosure |
|
| |
|
| Turkey Point Inspection / Activity Plan 03/01/2013-06/30/2014 Unit Number Page 2 of 2 03/04/2013 08:38:01 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 1 SGISI-UNIT 3 SG IN-SERVICE INSPECTION 3 01/20/2014 01/24/2014 IP 7111108P Inservice Inspection Activities - PWR 1 EP-EP PROGRAM INSPECTION 3, 4 02/03/2014 02/07/2014 IP 7111402 A lert and Notification System Testing 3, 4 02/03/2014 02/07/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3, 4 02/03/2014 02/07/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/03/2014 02/07/2014 IP 71151 Performance Indicator Verification 6 CDBI-COMPONENT DESIGN BASES INSPECTION 3, 4 03/03/2014 03/07/2014 IP 7111121 Component Design Bases Inspection 3, 4 03/24/2014 03/28/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/07/2014 04/11/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/21/2014 04/25/2014 IP 7111121 Component Design Bases Inspection Comments: This report does not include INPO and OUTAGE activities. | | Page 2 of 2 Turkey Point 03/04/2013 08:38:01 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site SGISI - UNIT 3 SG IN-SERVICE INSPECTION 1 3 01/20/2014 01/24/2014 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION 1 3, 4 02/03/2014 02/07/2014 IP 7111402 Alert and Notification System Testing 3, 4 02/03/2014 02/07/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3, 4 02/03/2014 02/07/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/03/2014 02/07/2014 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 6 3, 4 03/03/2014 03/07/2014 IP 7111121 Component Design Bases Inspection 3, 4 03/24/2014 03/28/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/07/2014 04/11/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/21/2014 04/25/2014 IP 7111121 Component Design Bases Inspection Comments: |
| | This report does not include INPO and OUTAGE activities. |
|
| |
|
| This report shows only on-site and announced inspection procedures. | | This report shows only on-site and announced inspection procedures. Enclosure |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 IR 05000250/20240112024-02-15015 February 2024 Notification of Turkey Point Nuclear Generating Station - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000250/2024011 and 05000251/2024011 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) ML23159A0852023-06-0909 June 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22196A0722022-07-19019 July 2022 Notification of an NRC Fire Protection Team Inspection and Request for Information IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) ML21196A1042021-07-15015 July 2021 Notification of Supplemental Inspection (95001) and Request for Information ML21182A1912021-07-0101 July 2021 Requalification Program Inspection - Turkey Point Nuclear Plant, Units 3 and 4 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19346G7212019-12-12012 December 2019 Radiation Safety Baseline Inspection RFI 2020-001 ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information IR 05000250/20190052019-08-27027 August 2019 Updated Inspection Plan for Turkey Point Nuclear Generating Station, Unit 3 and Unit 4 - (Report 05000250/2019005 and 05000251/2019005) ML19137A0452019-05-17017 May 2019 Heat Sink RFI 2019003 IR 05000250/20180062019-03-0404 March 2019 Annual Assessment Letter for Turkey Point Nuclear Generating Station, Unit 3 and 4 - Report 05000250/2018006 and 05000251/2018006, Report 05000250/2018402 and 05000251/2018402, Report 05000250/2018501 and 05000251/2018501 ML19057A0932019-02-26026 February 2019 RP RFI Notification ML19030A7652019-01-23023 January 2019 Tp U4 ISI RFI ML18219A6562018-08-0707 August 2018 Baseline Inservice Inspection Initial Information Request ML18059A0282018-02-28028 February 2018 EOC Assessment Letter Final ML17111A7482017-04-18018 April 2017 Requalification Program Inspection - Turkey Points 3 and 4 IR 05000250/20160062017-03-0101 March 2017 Annual Assessment Letter for Turkey Point Nuclear Generating Station, Units 3 and 4 (Report 05000250/2016006 and 05000251/2016006) IR 05000250/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Station Unit 3 and Unit 4 - NRC Inspection Report 05000250/2016005 and 05000251/2016005 ML16064A0632016-03-0303 March 2016 Turkey Point Nuclear Generating Station - Notification of Inspection and Request for Information ML16041A1282016-02-10010 February 2016 U-4 ISI 2016002 RFI as IR 05000250/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Units 3 & 4 (Report 05000250/2015005 and 05000251/2015005) IR 05000051/20140012015-03-0404 March 2015 Annual Assessment Letter for Turkey Point Nuclear Generating Unit 3 and Unit 4, (Report 05000250/2014001 and 0500051/2014001) ML14245A1862014-09-0202 September 2014 Mid-Cycle Ltr 2014 L-2014-073, Inservice Inspection Plan Relief Request No. 142014-03-14014 March 2014 Inservice Inspection Plan Relief Request No. 14 IR 05000250/20130012014-03-0404 March 2014 Annual Assessment Letter for Turkey Point Nuclear Generating Unit 3 and Unit 4 (Report 05000250/2013001 and 05000251/2013001) ML13246A1002013-09-0303 September 2013 Mid-Cycle Assessment Letter IR 05000250/20120012013-03-0404 March 2013 Annual Assessment Letter for Turkey Point Nuclear Plant, Units 3 & 4 (IR 05000250-12-001 and 05000251-12-001) ML13022A5712013-01-22022 January 2013 Notification of Inspection and Request for Information ML12248A2022012-09-0404 September 2012 Mid Cycle Assessment Letter Turkey Point 2012 ML1206502742012-03-0505 March 2012 EOC Report 22 ML1124403682011-09-0101 September 2011 Report 22 - Turkey Point ML1106302102011-03-0404 March 2011 Inspection/Activity Plan, Report 22, 03/01/2011 - 06/30/2012 ML1024408162010-09-0101 September 2010 Report 22 - 2010 Mid-Cycle, Inspection/Activity Plan 09/01/2010 - 12/31/2011 ML1006206272010-03-0303 March 2010 Report 22 - 201001, Inspection/Activity Plan ML0924404362009-09-0101 September 2009 Report 22, Inspection/Activity Plan, 09/01/2009 - 12/31/2010 ML0906306152009-03-0404 March 2009 Report 22 - Inspection/Activity Plan 03/01/2009 - 06/30/2010 ML0824610222008-09-0202 September 2008 Inspection/Activity Plan, 09/01/2008 - 12/31/2009, Report 22 ML0724305032007-08-31031 August 2007 Inspection/Activity Plan 09/01/2007-03/31/2009 ML0706000422007-03-0101 March 2007 Inspection / Activity Plan 03/01/2007 - 09/30/2008 ML0624302952006-08-30030 August 2006 Mid-Cycle Performance Review and Inspection Plan, 08/01/06 - 07/31/07 IR 05000250/20060012006-03-0202 March 2006 Inspection/Activity Plan - Turkey Point Nuclear Plant (NRC Inspection Report 05000250-06-001 and 05000251-06-001) 2024-02-28
[Table view] Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)
Dear Mr. Nazar:
On February 13, 2013, the NRC completed its end-of-cycle performance review of Turkey Point Nuclear Plant Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Turkey Point Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC determined the performance at Turkey Point Nuclear Plant Unit 3 and Unit 4 during the first three quarters of the assessment period was within the Regulatory Response Column of the NRCs ROP Action Matrix because of one White finding in the Emergency Preparedness cornerstone. This finding was documented in a final significance determination and assessment follow-up letter issued by the NRC on April 9, 2012, as Inspection Report 05000250/20120010 and 05000251/20120010 (ML12100A243). On September 13, 2012, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001, and confirmed that you had adequately addressed the White finding. As a result, NRC determined the performance at Turkey Point Unit 3 and Unit 4 returned to the Licensee Response column of the ROP Action Matrix as of the fourth quarter of 2012. This inspection was documented in an inspection report and assessment follow-up letter issued by the NRC on October 22, 2012, as Inspection Report 05000250/2012012 and 05000251/2012012 (ML12297A405). The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
We also plan on conducting two non-ROP inspections which include: Temporary Instruction (TI)
2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, and an Initial Operator Licensing Exam.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Shane Sandal at (404) 997-4513 with any questions you may have regarding this letter.
Sincerely,
/RA/
Richard P. Croteau, Director Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure: Turkey Point Nuclear Plant Inspection/Activity Plan (03/01/2013 - 06/30/2014)
cc w/Encl: (See page 3)
_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE MJR /RA/ SRS /RA/ RPC /RA/
NAME MRiches SSandal WJones RCroteau DATE 02/20/2013 02/21/2013 02/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl: Cynthia Becker Alison Brown (Acting) Chief Nuclear Licensing Florida Bureau of Radiation Control Florida Power & Light Company Department of Health Electronic Mail Distribution Electronic Mail Distribution Larry Nicholson Attorney General Director Department of Legal Affairs Licensing The Capitol PL-01 Florida Power & Light Company Tallahassee, FL 32399-1050 Electronic Mail Distribution James Petro Michael Kiley Managing Attorney-Nuclear Site Vice President Florida Power & Light Company Turkey Point Nuclear Plant Electronic Mail Distribution Florida Power and Light Company Electronic Mail Distribution County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Niel Batista Miami, FL 33128 Emergency Management Coordinator Department of Emergency Management George Gretsas and Homeland Security City Manager Electronic Mail Distribution City of Homestead Electronic Mail Distribution Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Eric McCartney Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Letter to Mano Nazar from Richard P. Croteau dated March 4, 2013 SUBJECT: ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (REPORT 05000250/2012001 AND 05000251/2012001)
Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
Page 1 of 2 Turkey Point 03/04/2013 08:38:01 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site HS - TRIENNIAL HEAT SINK PERFORMANCE 1 3, 4 02/25/2013 03/01/2013 IP 7111107T Heat Sink Performance RP - RP OCCUPATIONAL BASELINE 4 3, 4 02/25/2013 03/01/2013 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 02/25/2013 03/01/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 02/25/2013 03/01/2013 IP 71124.04 Occupational Dose Assessment 3, 4 02/25/2013 03/01/2013 IP 71124.05 Radiation Monitoring Instrumentation OL EXAM - INITIAL EXAM - WEEK 1 3 3 03/04/2013 03/08/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 2 3 03/11/2013 03/15/2013 V23393 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES EP - EMERGENCY PREPAREDNESS EXERCISE 1 3, 4 06/17/2013 06/21/2013 IP 7111401 Exercise Evaluation 3, 4 06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification TFPI - TRIENNIAL FIRE PROTECTION INSP 5 3, 4 06/10/2013 06/14/2013 IP 7111105T Fire Protection [Triennial]
3, 4 06/24/2013 06/28/2013 IP 7111105T Fire Protection [Triennial]
RP - RAD HAZARDS ASSESSMENT 2 3, 4 08/05/2013 08/09/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification OL-RQ - REQUAL INSP 2 3, 4 09/16/2013 09/23/2013 IP 7111111B Licensed Operator Requalification Program TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 3, 4 11/25/2013 11/27/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 01/13/2014 01/17/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP PUBLIC RADIATION SAFETY BASELINE 4 3, 4 01/13/2014 01/17/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 01/13/2014 01/17/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 01/13/2014 01/17/2014 IP 71124.07 Radiological Environmental Monitoring Program 3, 4 01/13/2014 01/17/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 01/13/2014 01/17/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Page 2 of 2 Turkey Point 03/04/2013 08:38:01 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site SGISI - UNIT 3 SG IN-SERVICE INSPECTION 1 3 01/20/2014 01/24/2014 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION 1 3, 4 02/03/2014 02/07/2014 IP 7111402 Alert and Notification System Testing 3, 4 02/03/2014 02/07/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3, 4 02/03/2014 02/07/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/03/2014 02/07/2014 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 6 3, 4 03/03/2014 03/07/2014 IP 7111121 Component Design Bases Inspection 3, 4 03/24/2014 03/28/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/07/2014 04/11/2014 IP 7111121 Component Design Bases Inspection 3, 4 04/21/2014 04/25/2014 IP 7111121 Component Design Bases Inspection Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure