IR 05000250/2012405

From kanterella
Jump to navigation Jump to search
IR 05000250-12-405 and 05000251-12-405, 8/17/2012, Turkey Point Nuclear Power Plant, Cover Letter
ML12257A351
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/12/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Nazar M
Florida Power & Light Co
References
IR-12-405
Download: ML12257A351 (4)


Text

UNITED STATES ber 12, 2012

SUBJECT:

TURKEY POINT NUCLEAR POWER PLANT- U.S. NUCLEAR REGULATORY COMMISSION (NRC) SECURITY INSPECTION REPORT 05000250/2012404 AND 05000251/2012404

Dear Mr. Nazar:

On August 17, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Turkey Point Nuclear Plant, Units 3 and 4. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on August 17, 2012, with Mr. M. Kiley, and other members of your staff. .

This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-250, 50-251 License No. DPR-31, DPR-41 Enclosure:

IR 05000250/2012404 and05000251/2012404 w/Att: Supplemental Information (OUO)

cc w/encl: (See page 3) ML12257A351 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/B3 SIGNATURE RA/JT RA/JS For JW RA/IH RA/BD RA/DR NAME J. TORNOW J. WALLO I. HALL B. DESAI D. RICH DATE 09/07/2012 09/12/2012 09/07/2012 09/06/2012 09/07/2012 9/ /2012 9/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl.:

Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035