IR 05000010/2018013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations
{{#Wiki_filter:ust 7, 2018
/RA by Rhex Edwards Acting for/


*Code of Federal Regulations
==SUBJECT:==
NRC INSPECTION REPORT NO. 05000010/2018013(DNMS) - DRESDEN NUCLEAR POWER STATION, UNIT 1


**
==Dear Mr. Hanson:==
*
On July 11, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the permanently shut down Dresden Nuclear Power Station, Unit 1. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with Mr. J. Washko and other members of your staff on July 11, 2018.
**


****
During the inspection, the NRC inspector reviewed the following aspects of onsite activities:
performance and status review; safety reviews, design changes, and modifications; self-assessments, audits, and corrective actions; occupational radiation exposure; radioactive waste treatment and effluent and environmental monitoring; and transportation of radioactive material. The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, and interviews with personnel.


******
Based on the results of this inspection, no violations of NRC requirements were identified. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.


****
Sincerely,
 
/RA by Rhex Edwards Acting for/
******
Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 50-010 License No. DPR-2 Enclosure:
*
IR No. 05000010/2018013(DNMS)
 
cc w/encl: Distribution via LISTSERV
***
}}
}}

Latest revision as of 18:21, 20 October 2019

NRC Inspection Report No. 05000010/2018013(DNMS) - Dresden Nuclear Power Station, Unit 1
ML18220B044
Person / Time
Site: Dresden Constellation icon.png
Issue date: 08/07/2018
From: Michael Kunowski
NRC/RGN-III/DNMS/MCID
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Learn M
References
IR 2018013
Download: ML18220B044 (14)


Text

ust 7, 2018

SUBJECT:

NRC INSPECTION REPORT NO. 05000010/2018013(DNMS) - DRESDEN NUCLEAR POWER STATION, UNIT 1

Dear Mr. Hanson:

On July 11, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the permanently shut down Dresden Nuclear Power Station, Unit 1. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with Mr. J. Washko and other members of your staff on July 11, 2018.

During the inspection, the NRC inspector reviewed the following aspects of onsite activities:

performance and status review; safety reviews, design changes, and modifications; self-assessments, audits, and corrective actions; occupational radiation exposure; radioactive waste treatment and effluent and environmental monitoring; and transportation of radioactive material. The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, and interviews with personnel.

Based on the results of this inspection, no violations of NRC requirements were identified. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA by Rhex Edwards Acting for/

Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No.50-010 License No. DPR-2 Enclosure:

IR No. 05000010/2018013(DNMS)

cc w/encl: Distribution via LISTSERV