ML19225A426: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:A'abama Power Company
{{#Wiki_filter:. A'abama Power Company                                                           ,   ,_
, ,_.600 W;r*n 18:n Street
  . 600 W;r*n 18:n Street Post Orce Ek,s 2641 B,tm.ng%m A;atuma 35291 Y   Te, conch 205 323 5341                                                         ,-
.Post Orce Ek,s 2641 B,tm.ng%m A;atuma 35291 Y Te, conch 205 323 5341
a
,-a Alabama Power
: r. t. cura. m                                                         Alabama Power Seneor Mce F4esceni                                                 the Sywn e.ect'sc system May 31, 1979
: r. t. cura. m Seneor Mce F4esceni the Sywn e.ect'sc system May 31, 1979
                                                                                        ~,
~,[ .$ c-m Docket No. 50-364- tc NRC IE Bulletin 79-04 NZ 3 ZU- m>on~; 9 e~ .; ,..-Mr. James P. O'Reilly
m Docket No. 50-364 NRC IE Bulletin 79-04                                                                 [3 .$NZc-
~**,s U. S. Nuclear Regulatory Commission Region IIl3 101 Marittta Street, N.V.
                                                                                                  - tc ZU
-Suite 3100 Atlanta, Georgia 30303
                                                                                                  - m e
                                                                                          >       on
                                                                                                  ~; 9
                                                                                        ..        ~ .; ,
                                                                                        -
Mr. James P. O'Reilly                                                             ~
                                                                                                  ,s
                                                                                                      **
U. S. Nuclear Regulatory Commission Region II                      l3 101 Marittta Street, N.V.                                                                           -
Suite 3100 Atlanta, Georgia 30303


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==


In response to IE Bulletin 79-04, Incorrect , eights for Swing Check 30, 1979 Valves manuf actured by Velan Engineering Corporatiou. dated March Alabama Power Company submits the following response to Items 1 through 5 for Farley Unit 2.
In response to IE Bulletin 79-04, Incorrect , eights for Swing Check Valves manuf actured by Velan Engineering Corporatiou. dated March 30, 1979 Alabama Power Company submits the following response to Items 1 through 5 for Farley Unit 2.
Ite= 1: List all Seismic Category I pipine systems where 3, 4, or 6 inch diameter Velan swing check valves are installed.(a) Baron Thermal Regeneration (2 valves)(b) Waste Process (3 valves)(c) Chemical and Volume Control (11 Valves)(d) Safety Injection (11 valves)
Ite= 1: List all Seismic Category I pipine systems where 3, 4, or 6 inch diameter Velan swing check valves are installed.
(a) Baron Thermal Regeneration (2 valves)
(b) Waste Process (3 valves)
(c) Chemical and Volume Control (11 Valves)
(d) Safety Injection (11 valves)
Item 2: Verify for the systems identifiel in Item (1) above that correct check valve weights were used in the piping analysis.
Item 2: Verify for the systems identifiel in Item (1) above that correct check valve weights were used in the piping analysis.
All Velar swing check valve weights from certified vendor drawings are compared to the check valve weights specified in IE Bulletin 79-04.
All Velar swing check valve weights from certified vendor drawings are compared to the check valve weights specified in IE Bulletin 79-04. No discrepancies were found.
No discrepancies were found.
Item 3 thru 5: These items in the bulletin are not applicable since the correct valve weights were used in the analysis.
Item 3 thru 5: These items in the bulletin are not applicable since the correct valve weights were used in the analysis.
Yours truly, fe*.. . , b J U d,E. L. Claycon, Jr.
Yours truly,
.-[] [>FLCJr/ KAP:bhj 9 9 0719 0 l(o, [/D"'/'
                                                            .-
ilALCO
* fe
-..e Mr. James P. O'Reilly
                                                  .. .,b J U d,E. L. Claycon, Jr.
.PAGE 2 May 31, 1979 DISTRIBUTION cc: Mr. R. A. Thomas Mr. G. F. Trowbridge
[] [>
-<,-,<s ,)s' . ,),}}
FLCJr/ KAP:bhj 9 9 0719 0 l(o, [/D"'/'           ilALCO
 
  -
.
.e
.
Mr. James P. O'Reilly PAGE 2 May 31, 1979 DISTRIBUTION cc: Mr. R. A. Thomas Mr. G. F. Trowbridge
                                -
                                  <
                                    < ,-     ,
s ,)   s' . ,) ,}}

Revision as of 11:40, 19 October 2019

Responds to IE Bulletin 79-04, Incorrect Weights for Swing Check Valves Mfg by Velan Engineering Corp. Lists Seismic Category 1 Piping Sys Where 3,4 or 6-inch Valves Are Installed.Verifies Valve Weights
ML19225A426
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/31/1979
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7907190165
Download: ML19225A426 (1)


Text

. A'abama Power Company , ,_

. 600 W;r*n 18:n Street Post Orce Ek,s 2641 B,tm.ng%m A;atuma 35291 Y Te, conch 205 323 5341 ,-

a

r. t. cura. m Alabama Power Seneor Mce F4esceni the Sywn e.ect'sc system May 31, 1979

~,

m Docket No. 50-364 NRC IE Bulletin 79-04 [3 .$NZc-

- tc ZU

- m e

> on

~; 9

.. ~ .; ,

-

Mr. James P. O'Reilly ~

,s

U. S. Nuclear Regulatory Commission Region II l3 101 Marittta Street, N.V. -

Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

In response to IE Bulletin 79-04, Incorrect , eights for Swing Check Valves manuf actured by Velan Engineering Corporatiou. dated March 30, 1979 Alabama Power Company submits the following response to Items 1 through 5 for Farley Unit 2.

Ite= 1: List all Seismic Category I pipine systems where 3, 4, or 6 inch diameter Velan swing check valves are installed.

(a) Baron Thermal Regeneration (2 valves)

(b) Waste Process (3 valves)

(c) Chemical and Volume Control (11 Valves)

(d) Safety Injection (11 valves)

Item 2: Verify for the systems identifiel in Item (1) above that correct check valve weights were used in the piping analysis.

All Velar swing check valve weights from certified vendor drawings are compared to the check valve weights specified in IE Bulletin 79-04. No discrepancies were found.

Item 3 thru 5: These items in the bulletin are not applicable since the correct valve weights were used in the analysis.

Yours truly,

.-

  • fe

.. .,b J U d,E. L. Claycon, Jr.

[] [>

FLCJr/ KAP:bhj 9 9 0719 0 l(o, [/D"'/' ilALCO

-

.

.e

.

Mr. James P. O'Reilly PAGE 2 May 31, 1979 DISTRIBUTION cc: Mr. R. A. Thomas Mr. G. F. Trowbridge

-

<

< ,- ,

s ,) s' . ,) ,