ML17347B128: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/09/1989
| issue date = 06/09/1989
| title = Confirms 890821-25 Special Insp of Compliance w/10CFR50,App R,Sections Iii.G,Iii.J & III.0 at Facilities
| title = Confirms 890821-25 Special Insp of Compliance w/10CFR50,App R,Sections Iii.G,Iii.J & III.0 at Facilities
| author name = WOODY C O
| author name = Woody C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 10:42, 18 June 2019

Confirms 890821-25 Special Insp of Compliance w/10CFR50,App R,Sections Iii.G,Iii.J & III.0 at Facilities
ML17347B128
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/09/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-208, NUDOCS 8906130175
Download: ML17347B128 (4)


Text

.-gCCE~RATED DISTRIBUTION DEMONSTR TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS).ACCESSION NBR:8906130175 DOC.DATE: 89/06/09 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION WOODY,C.O.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Confirms 890821-25 special insp of plant re 10CFR50,App R, Sections III.G,III.J

&XII.O,per 890606 telcon.DISTRIBUTION CODE: A006D COPIES RECEIVED:LTR g ENCL Q SIZE: TITLE: OR/Licensing Submittal:

'Fire Protection NOTES: DOCKET 05000250 05000251 RECIPXENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR WERMEIL, J NRR/DEST/CEB NUDOCS-ABSTRACT OGC/HDS2 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 0 1 1 1 0 2 2 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEST/ADS 7E NRR/DEST/PSB 8D OC MB 01 NRC PDR COPIES LTTR ENCL 5 5 1 1 1 1 1 0 1 1 1 1 D S NOZE m ALL'%IKS" RECIPERIS:

vP fP TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 15 PZZASE HELP US TO REDUCE GREBE!CXMRCT'IHE DOCUMEPZ CDNTROL DESK, RXN Pl-37 (EXT.20079)TO ElaTKQ46%3 KKR NAME PRM DISTRIBUTION LISTS HZt DOCUMENTS YOU DONiT NEED!

P.O.Box 14000, Juno Beach, FL 33408-0420 JU58 9 1889 L-89-208 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 251 Ins ection of Com liance with 10 CFR 50 A endix R By letter dated May 26, 1989 (Luis A.Reyes to C.0.Woody), NRC confirmed the dates of July 10-14,,~1989, for a special Appendix R inspection of Turkey Point.In addition, the letter requested Appendix R information be provided to NRC Region II Staff by June 9, 1989.During a telephone conversation on June 6, 1989, between Mr.T.Conlon of Region II staff and Messrs.R.Gritz and J.Kirk from Florida Power and Light, new dates were established for the inspection and the submittal of the requested information.

This letter is provided to confirm the dates of August 21-25, 1989, for the special inspection of Turkey Point Units 3 and 4 regarding sections III.G, III.J, and III.O, of Appendix R to 10 CFR 50.Also, we are confirming July 19, 1989, as the date by which delivery will be made of one (1)copy of the information you requested in the above referenced letter.The Turkey Point, fire protection team, headed by Mr.J.Kirk, with Mr.R.Gritz acting as team"licensing response coordinator", is available for any additional information needed prior to or throughout the inspection period.S906i30175 S5'0609'DR ADOCK 05'00025$PDC an FPL Group company 1 j U.S.Nuclear Regulatory Commission L-89-208 Page 2 Should you have any questions concerning this letter or the upcoming inspection please advise R.W.Gritz at (407)694-3598 or J.Kirk at (407)694-4078.Very truly yours, Acting S or Vice President-Nuclear COW/RWG/cm cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant