ML18024A474: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18024A474
| number = ML18024A474
| issue date = 01/11/2018
| issue date = 01/11/2018
| title = Limerick Generating Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 1, 2, and 3; and R.E. Ginna Nuclear Power Plant - Submittal of Radiological Emergency Plan Annex Revisions
| title = Peach Bottom Atomic Power Station, Units 1, 2, and 3; and R.E. Ginna Nuclear Power Plant - Submittal of Radiological Emergency Plan Annex Revisions
| author name = Helker D P
| author name = Helker D P
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC

Revision as of 02:52, 2 April 2019

Peach Bottom Atomic Power Station, Units 1, 2, and 3; and R.E. Ginna Nuclear Power Plant - Submittal of Radiological Emergency Plan Annex Revisions
ML18024A474
Person / Time
Site: Peach Bottom, Limerick, Ginna  Constellation icon.png
Issue date: 01/11/2018
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML18024A434 List:
References
Download: ML18024A474 (2)


Text

,;; Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.54(q){5) 10 CFR 50.4 10 CFR 72.44(f) January 11, 2018 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001

Subject:

Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRG Docket Nos. 50-352. 50-353, and 72-65 Peach Bottom Atomic Power Station, Units 1, 2, and 3 Facility Operating

[Possession Only] License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRG Docket Nos. 50-171. 50-277, 50-278. and 72-79 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRG Docket Nos. 50-244 and 72-67 Exelon Nuclear Radiological Emergency Plan Annex Revisions In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (Exelon) is submitting Emergency Plan Annex revisions for Limerick Generating Station (LGS), Peach Bottom Atomic Power Stations (PBAPS), and R. E. Ginna Nuclear Power Plant (Ginna) as listed in the table below.

  • Document*

I Revision.

I Title** EP-AA-1007 33 Exelon Nuclear Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station EP-AA-1008 30 Exelon Nuclear Radiological Emergency Plan Annex for Limerick Generating Station EP-AA-1012 4 Exelon Nuclear Radiological Emergency Plan Annex for Ginna Station The changes to the Emergency Plan Annexes were evaluated under the requirements of 1 O CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plans for LGS, PBAPS, and Ginna. This notification is being submitted within 30 days of implementation of the changes as required by 1 O CFR 50.54(q)(5).

The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR ;(/ /,. 4-£5 50, Appendix E. /JNSSZbl ;vt-,t_ A)t--/5 5 U.S. Nuclear Regulatory Commission Emergency Plan Annex Revisions NRG Docket Nos. 50-352, 50-353, 72-65, 50-171, 50-277, 50-278, 72-79, 50-244, and 72-67 January 11, 2018 Page2 In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Annexes (Attachment 1 ). This submittal also satisfies the reporting requirements associated with 1 O CFR 72.44(f), which stipulates that within six months after any change is rnade to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management.

A copy of the revised Emergency Plan Annexes and supporting change summary analysis are included in the attachments to this letter. There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respectfully, 9/.Y~ David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

1) 2) 1 O CFR 50.54(q)(5)

Procedure Change Summary Analysis EP-AA-1007, Revision 33, * "Exelon Nuclear Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station" cc: 3) 4) EP-AA-1008, Revision 30, "Exelon Nuclear Radiological Emergency Plan Annex for Limerick Generating Station"

  • EP-AA-1012, Revision 4, "Exelon Nuclear Radiological Emergency Plan Annex for Ginna Station" w/ Attachment 1 only Regional Administrator

-NRG Region I Director, NRG Division of Spent Fuel Management, ONMSS NRG Senior Resident Inspector

-Limerick Generating Station NRG Project Manager, NRA -Limerick Generating Station NRG Senior Resident Inspector

-Peach Bottom Atomic Power Station NRG Project Manager, NRA -Peach Bottom Atomic Power Station NRG Senior Resident Inspector

-R.E. Ginna Nuclear Power Plant NRG Project Manager, NRA -R.E. Ginna Nuclear Power Plant Director, Bureau of Radiation Protection

-Pennsylvania Department of Environmental Resources R. R. Janati, Commonwealth of Pennsylvania S. T. Gray -State of Maryland A. L. Peterson, NYSERDA