An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001 a 585 546-2700 www.rge. orn April 22, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Mr. Robert Clark (Mail Stop 0-8-E9)
Project Directorate 1-1
Subject:
Revision to Emergency Plan Implementing Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 Gentlemen:
The latest revision of EPIP 4-8 was distributed yesterday, April 22, 2004. This revision was sent out with the previous revision number inadvertently not changed.
Attached you will find a corrected cover sheet reflecting the correct revision number (5). Please remove the existing cover sheet and replace it with the attached.
Thank you for your understanding in this matter. I apologize for any confusion or inconvenience this may have caused.
Sincerely, Jill T. Willoughby Procedures Specialist Attachment
-AO Lf5
GINNA STATION CONTROLLED COPY NUMBER aV 5 PROCEDURE NUMBER EPIP 4 - 8 REV. NO.
5 TESTING OF THE GINNA SIRENS FROM THE TECHNICAL SUPPORT CENTER EFFECIVE ATE Category 1.0 This Procedure Contains 4 Pages
.I Sf