Revision 32 to EP-AA-1007, Radiological Emergency Plan Annex
ML17037D200
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/01/2017
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML17041A291 List:
References
EP-AA-1007, Rev 32
Download: ML17037D200 (2)


Text

200 Exelon Way Kennett Square, PA 19348 Exelon Generation www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4.

10 CFR 72.44(f)

/'

February 1, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2, and 3 Facility Operating [Possession Only] License No. DPR-12 Renewed Facility Operating License Nos: DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278, and 72-79

Subject:

Exelon Nuclear Radiological Emergency Plan Annex Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGC) is subr:nitting an Emergency Plan Annex revision for Peach Bottom Atomic Power Station (PBAPS) as listed in the table below.

  • : < Oo~ument~>>  :' ;.* :':~evision~*:.

Radiological Emergency Plan Annex for Peach

. EP-AA-1007 32 Bottom Atomic Power Station The changes to the Emergency Plan Annex were evaluated under the requirements of 10 CFR 50.54(q) and were determined not to result in *a reduction in the effectiveness of the Emergency Plan for PBAPS. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.54(q)(5). The changes continue to meet tfle applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),

which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Storage and Transportation.

U.S. Nuclear Regulatory Commission PBAPS Emergency Plan Annex Revision February 1, 2017 Page2 A copy of the revised Emergency Plan Annex and supporting change summary analysis are included in the attachments to this letter.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) 10 CFR 50.54(q)(5) Procedure Change Summary Analysis

2) EP-AA-1007, Revision 32, "Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station" cc: w/ Attachment 1 only Regional Administrator - NRC Region I Director, NRC Division of Spent Fuel Storage and Transportation, ONMSS NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Project Manager, NRR - Peach Bottom Atomic Power Station Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources R.R. Janati, Commonwealth of Pennsylvania