Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML19308B4122019-10-28028 October 2019 CFR 50.54(q)(5) Procedure Change Summary Analysis ML19162A1752019-06-0606 June 2019 10 CFR 50.54(q)(5) Procedure Change Summary Analysis ML18065A2042018-03-0606 March 2018 Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. ML18024A4762018-01-11011 January 2018 Attachments 1-4: 10CFR50.54(q)(5) Procedure Change Summary Analysis, EP-AA-1007, Rev. 33, EP-AA-1008, Rev 30 and EP-AA-1012, Rev. 4 ML18024A4742018-01-11011 January 2018 Submittal of Radiological Emergency Plan Annex Revisions ML17271A1782017-09-21021 September 2017 Radiological Emergency Plan Annex and Addendum Revisions ML17041A2922017-02-0101 February 2017 Revision 32 to EP-AA-1007, Radiological Emergency Plan Annex and 10 CFR 50.54(q)(5) Procedure Change Summary Analysis ML17037D2002017-02-0101 February 2017 Revision 32 to EP-AA-1007, Radiological Emergency Plan Annex ML16267A4602016-09-14014 September 2016 Submittal of Revision 4 to Radiological Emergency Plan EP-AA-1007, Addendum 3 ML16190A3852016-07-0808 July 2016 EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure ML16049A2592016-02-11011 February 2016 EP-AA-1007, Addendum 3, Revision 3, Emergency Action Levels for Pbaps. ML16028A1722016-01-14014 January 2016 EP-AA-1007, Addendum 3, Revision 2, Emergency Action Levels for Pbaps. RS-15-327, Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form.2015-12-15015 December 2015 Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form. RA-15-112, Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390)2015-12-15015 December 2015 Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390) RA-13-066, Standardized Radiological Emergency Plan Implementing Procedure Revisions2013-07-25025 July 2013 Standardized Radiological Emergency Plan Implementing Procedure Revisions ML14311A5752013-07-18018 July 2013 Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions ML14311A6432013-07-18018 July 2013 Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions. (Version ML13200A124) RA-10-087, Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation2010-11-11011 November 2010 Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation ML0909702912009-04-0202 April 2009 Revision D to Emergency Plan Implementing Procedure EP-AA-113-F-08, PBAPS Assembly, Accountability and Evacuation Guidelines ML0823802472008-08-18018 August 2008 Submittal of Radiological Emergency Preparedness Exercise Final Report for 04/22/2008 ML0333002862003-11-17017 November 2003 Stations, Revised Emergency Plan Implementing Procedures ML0330701942003-10-24024 October 2003 to EP-AA-112-401, Nuclear Duty Officer (Ndo). RS-03-184, Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery.2003-09-19019 September 2003 Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery. ML0325911652003-09-0505 September 2003 EP-MA-110-200, Revision 3, Dose Assessment. ML0320204442003-07-14014 July 2003 Transmittal of Revised Emergency Plan Procedures EP-MA-110-100, Revision 2 & EP-MA-114-100, Revision 4 for Peach Bottom, Units 2 & 3, Limerick Generating, Units 1 & 2 and Three Mile Island, Unit 1 ML0319601292003-07-0202 July 2003 EP-AA-1007, Revision 7, Exelon Nuclear Radiological Emergency Plan Annex ML0317403442003-06-16016 June 2003 Transmittal of Revised Emergency Plan Procedures for Peach Bottom Units 2 & 3, Limerick Units 1 & 2 and Three Mile Island Unit 1 ML0315500462003-05-28028 May 2003 EP-MA-114-100, Revision 3, Marog Notifications ML0309402752003-03-26026 March 2003 Submittal of EP-AA-1007, Revision 5, Exelon Nuclear Radiological Emergency Plan Annex, for Peach Bottom Atomic Power Station, Units 2 & 3 ML0233102042002-11-21021 November 2002 EP-MA-110-200, Revision 1, Dose Assessment. ML0226803392002-09-19019 September 2002 Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2, Operations Support Center Activation and Operation - Attachment 8 ML0226802942002-09-19019 September 2002 Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2, Attachments 1 - 7 ML0226802842002-09-19019 September 2002 Transmittal of Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2 ML0226804802002-09-19019 September 2002 Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2, Public Information Organization Activation and Operations - Attachment 7 ML0226803092002-09-19019 September 2002 Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2, Control Room Operations - Attachment 4 ML0218305822002-06-20020 June 2002 Emergency Response Procedures, Including ERP-620, Rev 13; ERP-205, Rev 11; ERP-200, Appendix 1, Rev 6; ERP-140, Rev 20 & ERP-110, Appendix 1, Rev 58 ML0208601522002-03-12012 March 2002 Transmittal of Emergency Response Procedure ERP-130, Revision 19, Site Evacuation for Peach Bottom Atomic Power Station Units 2 & 3 ML0207701952002-02-27027 February 2002 Submittal of Emergency Response Procedure ERP-640, Revision 7, from Peach Bottom Units 2 & 3 ML0204603202002-02-0505 February 2002 ERP-101, Revision 23, Classification of Emergencies, and ERP-101 Bases, Revision 3, PBAPS EAL Technical Basis Manual. 2023-08-19
[Table view] Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] |