Submittal of Revision 4 to Radiological Emergency Plan EP-AA-1007, Addendum 3
ML16267A460
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/14/2016
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML16271A032 List:
References
Download: ML16267A460 (2)


Text

Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4.

10 CFR 72.44(f)

September 14, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2, and 3 Facility Operating [Possession Only] License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRG Docket Nos. 50-171, 50-277, 50-278, and 72-79

Subject:

Exelon Nuclear Radiological E.mergency Plan Addendum Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (Exelon) is submitting an Emergency Plan Addendum revision for Peach Bottom Atomic Power Station (PBAPS) as listed in the table below.

  • oocument *Revision* **Title Emergency Action Levels for Peach Bottom EP-AA-1007, Addendum 3 4 Atomic Power Station The changes to the Emergency Plan Addendum were evaluated under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for PBAPS: This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.54(q)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),

which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Storage and Transportation.

U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision September 14, 2016 Page2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) 10 CFR 50.54(q)(5) Procedure Change Summary Analysis

2) EP-AA-1007, Addendum 3, Revision 4, "Emergency Action Levels for Peach Bottom Atomic Power Station" cc: w/ Attachment 1 only Regional Administrator - NRC Region I Director, NRC Division of Spent Fuel Storage and Transportation, ONMSS NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Project Manager, NRR - Peach Bottom Atomic Power Station Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources R.R. Janati, Commonwealth of Pennsylvania