IR 05000277/2017001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17125A081
| number = ML17125A081
| issue date = 05/05/2017
| issue date = 05/05/2017
| title = Peach Bottom Atomic Power Station-Integrated Inspection Report 05000277/2017001 and 05000278/2017001
| title = Station-Integrated Inspection Report 05000277/2017001 and 05000278/2017001
| author name = Schroeder D L
| author name = Schroeder D L
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4

Revision as of 09:58, 6 April 2019

Station-Integrated Inspection Report 05000277/2017001 and 05000278/2017001
ML17125A081
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/05/2017
From: Schroeder D L
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Barber G
References
IR 2017001
Download: ML17125A081 (36)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406

-2713 May 5, 2017 Mr. Br yan Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: PEACH BOTTOM ATOMIC POWER STATION

- INTEGRATED INSPECTION REPORT 05000277/201 7 00 1 AND 05000278/201 7 00 1

Dear Mr. Hanson:

On March 31, 201 7 , the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Peach Bottom Atomic Power Station (PB), Unit s 2 and 3. O n April 21, 2017 , the NRC inspectors discussed the results of this inspection with Mr. Pat Navin , Peach Bottom Site Vice President , and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/readin g-rm/adams.html and the NRC

's Public Document Room in accordance with Title 10 Code of Federal Regulations (CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Sincerely,/RA/

Daniel L. Schroeder , Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos

. 50-277 and 50-278 License Nos

. DPR-44 and DPR-56

Enclosure:

Inspection Report 05000277/201 7 00 1 and 05000278/201 7 00 1

w/Attachment:

Supplementary Information cc w/encl:

Distribution via ListServ