IR 05000341/2017005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 39: Line 39:
Please contact me at 630-829-9827 with any questions you have regarding this lette  
Please contact me at 630-829-9827 with any questions you have regarding this lette  


Sincerely,/RA/ Billy Dickson, Chief Branch 2 Division of Reactor Projects Docket N License N NPF-43  
Sincerely,
 
/RA/ Billy Dickson, Chief Branch 2 Division of Reactor Projects Docket N License N NPF-43 Enclosure:
===Enclosure:===
Inspection Plan cc: Distribution via LISTSERV
Inspection Plan cc: Distribution via LISTSERV
}}
}}

Revision as of 03:24, 10 May 2019

Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2017005)
ML17240A334
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/28/2017
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Fessler P
DTE Energy
References
IR 2017005
Download: ML17240A334 (5)


Text

P. Fessle UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 August 28, 2017 Mr. Paul Fessler, Senior VP and Chief Nuclear Officer DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT: UPDATED INSPECTION PLAN FOR FERMI POWER PLANT, UNIT 2 (REPORT 05000341/2017005)

Dear Mr. Fessler

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 19 for Fermi Power Plant

. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include the plan for security

-related inspections, which will be sent via separate, non

-publicly available correspondenc The NRC staff completed Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans" at Fermi Power Plant, Unit 2 on January 27, 2017, to confirm full implementation of orders Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-

Design-Basis External Events" and Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."

The results of the inspection can be found in inspection report 05000341/2017008

.

P. Fessle - 2 - This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Please contact me at 630-829-9827 with any questions you have regarding this lette

Sincerely,

/RA/ Billy Dickson, Chief Branch 2 Division of Reactor Projects Docket N License N NPF-43 Enclosure:

Inspection Plan cc: Distribution via LISTSERV