B. Hanson 2 Please contact me at 610-337-50 12 with any questions you have regarding this lette  
B. Hanson 2 Please contact me at 610-337-50 12 with any questions you have regarding this lette  


Sincerely,/RA/ Michelle Catts, Acting Chief Projects Branch 1 Division of Reactor Projects Docket No and 50
Sincerely,
/RA/ Michelle Catts, Acting Chief Projects Branch 1 Division of Reactor Projects Docket No and 50
-318 License No DPR-53 and DPR
-318 License No DPR-53 and DPR
-69  
-69 Enclosure:
 
===Enclosure:===
Calvert Cliffs Inspection Plan cc: Distribution via ListServ
Calvert Cliffs Inspection Plan cc: Distribution via ListServ


Line 67: Line 66:
RADIATION SAFETY - ALARA
RADIATION SAFETY - ALARA


1 1, 2 01/08/2018
1, 2 01/08/2018


01/12/2018
01/12/2018
Line 77: Line 76:
UNIT 1 INSERVICE INSPECTION
UNIT 1 INSERVICE INSPECTION


1 1
1 02/26/2018
02/26/2018


03/09/2018
03/09/2018
Line 88: Line 86:
RADIATION SAFETY - RAD HAZ
RADIATION SAFETY - RAD HAZ


1 1, 2 02/26/2018
1, 2 02/26/2018


03/02/2018
03/02/2018
Line 114: Line 112:
RADIATION SAFETY - AIRBORNE
RADIATION SAFETY - AIRBORNE


1 1, 2 04/23/2018
1, 2 04/23/2018


04/27/2018
04/27/2018
Line 124: Line 122:
CALVERT CLIFFS INITIAL OL EXAM
CALVERT CLIFFS INITIAL OL EXAM


4 1, 2 07/09/2018
1, 2 07/09/2018


07/13/2018
07/13/2018
Line 138: Line 136:
EP PROGRAM INSPECTION
EP PROGRAM INSPECTION


1 1, 2 08/13/2018
1, 2 08/13/2018


08/17/2018
08/17/2018
Line 170: Line 168:
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR


4 1, 2 09/10/2018
1, 2 09/10/2018


09/14/2018
09/14/2018
Line 208: Line 206:
DESIGN BASES ASSURANCE INSPECTION (TEAM)
DESIGN BASES ASSURANCE INSPECTION (TEAM)


6 1, 2 09/17/2018
1, 2 09/17/2018


09/21/2018
09/21/2018
Line 226: Line 224:
1/23/2018 9:36:56 AM
1/23/2018 9:36:56 AM


Page 1
Page  
of 3
 
of  
 
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report


Line 238: Line 238:
RADIATION SAFETY - DOSIMETRY & PIV
RADIATION SAFETY - DOSIMETRY & PIV


1 1, 2 12/03/2018
1, 2 12/03/2018


12/07/2018
12/07/2018
Line 254: Line 254:
RADIATION SAFETY - INSTRUMENTS
RADIATION SAFETY - INSTRUMENTS


1 1, 2 01/14/2019
1, 2 01/14/2019


01/18/2019
01/18/2019
Line 264: Line 264:
INSERVICE INSPECTION - UNIT 2
INSERVICE INSPECTION - UNIT 2


1 2
2 02/25/2019
02/25/2019


03/08/2019
03/08/2019
Line 275: Line 274:
RADIATION SAFETY-RAD HAZ
RADIATION SAFETY-RAD HAZ


1 1, 2 02/25/2019
1, 2 02/25/2019


03/01/2019
03/01/2019
Line 299: Line 298:
000727 In-Plant Airborne Radioactivity Control and Mitigation
000727 In-Plant Airborne Radioactivity Control and Mitigation


RADWASTE 1
RADWASTE
 
1, 2 04/01/2019
1, 2 04/01/2019


Line 312: Line 312:
CYBER FULL IMP
CYBER FULL IMP


2 1, 2 04/29/2019
1, 2 04/29/2019


05/03/2019
05/03/2019
Line 328: Line 328:
000741 Cyber Security
000741 Cyber Security


MC&A 1
MC&A
 
1, 2 06/10/2019
1, 2 06/10/2019


Line 339: Line 340:
FORCE-ON-FORCE PLANNING AND EXERCISES
FORCE-ON-FORCE PLANNING AND EXERCISES


8 1, 2 06/24/2019
1, 2 06/24/2019


06/28/2019
06/28/2019
Line 357: Line 358:
ISFSI OPERATIONAL INSPECTION
ISFSI OPERATIONAL INSPECTION


2 1, 2 08/05/2019
1, 2 08/05/2019


08/09/2019
08/09/2019
Line 371: Line 372:
ACCESS CONTROL, EQUIP PERF, TRAINING
ACCESS CONTROL, EQUIP PERF, TRAINING


3 1, 2 08/05/2019
1, 2 08/05/2019


08/09/2019
08/09/2019
Line 389: Line 390:
1/23/2018 9:36:56 AM
1/23/2018 9:36:56 AM


Page 2
Page  
of 3
 
of  
 
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report


Line 401: Line 404:
ACCESS CONTROL, EQUIP PERF, TRAINING
ACCESS CONTROL, EQUIP PERF, TRAINING


3 1, 2 08/05/2019
1, 2 08/05/2019


08/09/2019
08/09/2019
Line 417: Line 420:
RADIATION SAFETY - REMP
RADIATION SAFETY - REMP


1 1, 2 08/19/2019
1, 2 08/19/2019


08/23/2019
08/23/2019
Line 427: Line 430:
TRIENNIAL FIRE PROTECTION
TRIENNIAL FIRE PROTECTION


4 1, 2 09/09/2019
1, 2 09/09/2019


09/13/2019
09/13/2019
Line 445: Line 448:
EP EXERCISE INSPECTION
EP EXERCISE INSPECTION


5 1, 2 09/16/2019
1, 2 09/16/2019


09/20/2019
09/20/2019
Line 461: Line 464:
PI&R BIENNIAL
PI&R BIENNIAL


1 1, 2 10/21/2019
1, 2 10/21/2019


10/25/2019
10/25/2019
Line 475: Line 478:
CC REQUAL INSP W/ P/F RESULTS
CC REQUAL INSP W/ P/F RESULTS


2 1, 2 11/18/2019
1, 2 11/18/2019


11/22/2019
11/22/2019
Line 493: Line 496:
Biennial Radiation Safety - RETS & PIV
Biennial Radiation Safety - RETS & PIV


1 1, 2 11/18/2019
1, 2 11/18/2019


11/22/2019
11/22/2019
Line 509: Line 512:
1/23/2018 9:36:56 AM
1/23/2018 9:36:56 AM


Page 3
Page  
of 3
 
of  
 
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
}}
}}

Revision as of 15:47, 9 May 2019

Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2017006 and 05000318/2017006, Report 05000317/2017402 and 05000318/2017402, Report 05000317/2017501 and 05000318/2017501)
ML18053A694
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/28/2018
From: Michelle Catts
NRC Region 1
To: Bryan Hanson
Exelon Nuclear, Exelon Nuclear Generation Corp
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18053A694 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406

-2713 February 28, 2018 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2017 006 AND 05000318/2017 006, REPORT 05000317/2017402 AND 05000318/2017402, REPORT 05000317/2017501 AND 05000318/2017501

) Dear Mr. Hanson

The NRC has completed its end

-of-cycle performance assessment of Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs)

, reviewing performance indicators (PIs)

, inspection results , and enforcement actions from January 1, 20 17 through December 31, 20 1 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC concluded that overall performance at your facility preserved public health and safet The NRC determined the performance at Calvert Cliffs during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC

's Reactor Oversight Process (ROP) Action Matrix

, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green.) Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through December 31

, 20 1 This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondenc The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes

. In addition to normal baseline inspections, the NRC will be performing Inspection Procedure (IP) 81311, "Physical Security Requirements for Independent Spent Fuel Storage Installations (ISFSI), and IP 60855.1, "Operation of an ISFSI at Operating Plants," at your facilit In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

B. Hanson 2 Please contact me at 610-337-50 12 with any questions you have regarding this lette

Sincerely,

/RA/ Michelle Catts, Acting Chief Projects Branch 1 Division of Reactor Projects Docket No and 50

-318 License No DPR-53 and DPR

-69 Enclosure:

Calvert Cliffs Inspection Plan cc: Distribution via ListServ

B. Hanson 3

SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2017 006 AND 05000318/2017 006, REPORT 05000317/2017402 AND 05000318/2017402, REPORT 05000317/2017501 AND 05000318/2017501)

DATED FEBRUARY 28, 2018 Distribution w/encl

(via E-mail) DLew, RA (R1ORAMAIL RESOURCE)

DCollins, DRA (R1ORAMAIL RESOURCE)

DPelton, DRP (R1DRPMAIL RESOURCE)

MGray, DRP (R1DRPMAIL RESOURCE)

JYerokun, DRS (R1DRSMAIL RESOURCE)

BWelling, DRS (R1DRSMAIL RESOURCE)

MCatts, DRP ARosebrook, DRP MHardgrove, DRP SObadina, DRP RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA JBowen, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource ROPReports Resource DRS Branch Chiefs (6)

DScrenci, PAO NSheehan, PAO JGreives, SLO DTifft, SLO ROPAssessment Resource RidsNrrDirslpabResources DOCUMENT NAME:

S:\ROP Assessment Meetings

\ROP-18 EOC Review

\Branch 1\Calvert Cliffs

\Calvert Cliffs 2017 Annual Assessment Letter.docx ADAMS ACCESSION NUMBER:

ML18053A694 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME A.Rosebrook M.Catts DATE 2/15/18 2/20/18 OFFICIAL RECORD CO PY Calvert Cliffs

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

RADIATION SAFETY - ALARA

1, 2 01/08/2018

01/12/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

UNIT 1 INSERVICE INSPECTION

1 02/26/2018

03/09/2018

IP 71111.08P

000702 Inservice Inspection Activities - PWR

RADIATION SAFETY - RAD HAZ

1, 2 02/26/2018

03/02/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 02/26/2018

03/02/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 02/26/2018

03/02/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

RADIATION SAFETY - AIRBORNE

1, 2 04/23/2018

04/27/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

CALVERT CLIFFS INITIAL OL EXAM

1, 2 07/09/2018

07/13/2018

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 08/06/2018

08/17/2018

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP PROGRAM INSPECTION

1, 2 08/13/2018

08/17/2018

IP 71114.02

000717 Alert and Notification System Testing

1, 2 08/13/2018

08/17/2018

IP 71114.03

000718 Emergency Preparedness Organization Staffing and Augmentation System

1, 2 08/13/2018

08/17/2018

IP 71114.05

000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

1, 2 08/13/2018

08/17/2018

IP 71151 001397 Performance Indicator Verification

ACCESS CONTROL, PROTECTIVE STRATEGY, TSR

1, 2 09/10/2018

09/14/2018

IP 71130.02

000734 Access Control

1, 2 09/10/2018

09/14/2018

IP 71130.05

000737 Protective Strategy Evaluation

1, 2 09/10/2018

09/14/2018

IP 71130.14

000743 Review of Power Reactor Target Sets

1, 2 09/10/2018

09/14/2018

IP 71151 001338 Performance Indicator Verification

1, 2 09/10/2018

09/14/2018

IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations

DESIGN BASES ASSURANCE INSPECTION (TEAM)

1, 2 09/17/2018

09/21/2018

IP 71111.21M

000713 Design Bases Assurance Inspection (Teams)

1, 2 10/01/2018

10/05/2018

IP 71111.21M

000713 Design Bases Assurance Inspection (Teams)

1/23/2018 9:36:56 AM

Page

of

This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report

Calvert Cliffs

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

RADIATION SAFETY - DOSIMETRY & PIV

1, 2 12/03/2018

12/07/2018

IP 71124.04

000729 Occupational Dose Assessment

1, 2 12/03/2018

12/07/2018

IP 71151 000746 Performance Indicator Verification

RADIATION SAFETY - INSTRUMENTS

1, 2 01/14/2019

01/18/2019

IP 71124.05

000729 Radiation Monitoring Instrumentation

INSERVICE INSPECTION - UNIT 2

2 02/25/2019

03/08/2019

IP 71111.08P

000702 Inservice Inspection Activities - PWR

RADIATION SAFETY-RAD HAZ

1, 2 02/25/2019

03/01/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 02/25/2019

03/01/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 02/25/2019

03/01/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

RADWASTE

1, 2 04/01/2019

04/05/2019

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

CYBER FULL IMP

1, 2 04/29/2019

05/03/2019

IP 71130.10P

000741 Cyber Security

1, 2 05/13/2019

05/17/2019

IP 71130.10P

000741 Cyber Security

MC&A

1, 2 06/10/2019

06/14/2019

IP 71130.11

000742 Material Control and Accounting (MC&A)

FORCE-ON-FORCE PLANNING AND EXERCISES

1, 2 06/24/2019

06/28/2019

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

1, 2 07/15/2019

07/19/2019

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

ISFSI OPERATIONAL INSPECTION

1, 2 08/05/2019

08/09/2019

IP 60855 001001 Operation Of An ISFSI

1, 2 08/05/2019

08/09/2019

IP 6085 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

ACCESS CONTROL, EQUIP PERF, TRAINING

1, 2 08/05/2019

08/09/2019

IP 71130.02

000734 Access Control

1, 2 08/05/2019

08/09/2019

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

1/23/2018 9:36:56 AM

Page

of

This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report

Calvert Cliffs

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

ACCESS CONTROL, EQUIP PERF, TRAINING

1, 2 08/05/2019

08/09/2019

IP 71130.07

000739 Security Training

1, 2 08/05/2019

08/09/2019

IP 71151 001338 Performance Indicator Verification

RADIATION SAFETY - REMP

1, 2 08/19/2019

08/23/2019

IP 71124.07

000731 Radiological Environmental Monitoring Program

TRIENNIAL FIRE PROTECTION

1, 2 09/09/2019

09/13/2019

IP 71111.05XT

000697 Fire Protection - NFPA 805 (Triennial)

1, 2 09/23/2019

09/27/2019

IP 71111.05XT

000697 Fire Protection - NFPA 805 (Triennial)

EP EXERCISE INSPECTION

1, 2 09/16/2019

09/20/2019

IP 71114.01

000716 Exercise Evaluation

1, 2 09/16/2019

09/20/2019

IP 71151 001397 Performance Indicator Verification

PI&R BIENNIAL

1, 2 10/21/2019

10/25/2019

IP 71152B 000747 Problem Identification and Resolution

1, 2 11/04/2019

11/08/2019

IP 71152B 000747 Problem Identification and Resolution

CC REQUAL INSP W/ P/F RESULTS

1, 2 11/18/2019

11/22/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 1, 2 11/18/2019

11/22/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial Radiation Safety - RETS & PIV

1, 2 11/18/2019

11/22/2019

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

1, 2 11/18/2019

11/22/2019

IP 71151 000746 Performance Indicator Verification

1/23/2018 9:36:56 AM