| SUBJECT: PALISADES NUCLEAR PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000255/201 4405 | | SUBJECT: PALISADES NUCLEAR PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000255/201 4 40 5 |
|
| |
|
| ==Dear Mr. Vitale:== | | ==Dear Mr. Vitale:== |
| On October 9, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Baseline Inspection of your Palisades Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 9, 2014, with you and other members of your staff. | | On October 9, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Baseline Inspection of your Palisades Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on Octobe r 9, 2014, with you and other members of your staff. |
|
| |
|
| The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | | The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. |
Line 36: |
Line 36: |
| -14-013, Confirmatory Order, dated July 21, 2014, the NRC is not issuing enforcement action related to this finding. | | -14-013, Confirmatory Order, dated July 21, 2014, the NRC is not issuing enforcement action related to this finding. |
|
| |
|
| Further, a licensee-identified violation which was determined to be of very low security significance (Green) is listed in this report. The NRC is treating th is violation as Non-Cited Violation (NCV) consistent with Section 2.3.2 of the NRC's Enforcement Policy. | | Further, a licensee-identified violation which was determined to be of very low security significance (Green) is listed in this report. The NRC is treating th i s violation as Non-Cited Violation (NCV) consistent with Section 2.3.2 of the NRC's Enforcement Policy. |
|
| |
|
| Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. The finding had a cross | | Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. The finding had a cross |
Line 71: |
Line 71: |
|
| |
|
| T. Dimitriadis, RI B. Desai, RII M. Haire, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl: | | T. Dimitriadis, RI B. Desai, RII M. Haire, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl: |
| Distribution via LISTSERV | | Distribution via LISTSERV A. Vital e -2- The finding had a cross |
| | -cutting aspect in the area of Human Performance, Consistent Process (H.13), for failing to use a consistent, systematic approach to make decisions related to verifying security officer qualifications. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report with the basis for your disagreement to the Regional Administrator, Region III and the NRC Resident Inspector at the Palisades Nuclear Plant. |
| | |
| | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading |
| | -rm/adams.html (the Public Electronic Reading Room). |
| | |
| | However, the material enclosed herewith contains Security |
| | -Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. |
| | |
| | Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security |
| | -Related Information is necessary to provide an acceptable response, please mark your entire response "Security |
| | -Related Information |
| | - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. |
| | |
| | Should you have any questions concerning this inspection, we will be pleased to discuss them with you. |
| | |
| | Sincerely,/RA by S. K. Orth Acting For/ |
| | Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety |
| | |
| | Docket No. 50 |
| | -255 License No. DPR |
| | -20 Nonpublic |
| | |
| | ===Enclosure:=== |
| | Inspection Report 05000255/2014405 |
| | |
| | ===w/Attachment:=== |
| | Supplemental Information cc w/encl: |
| | N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl: |
| | Distribution via LISTSERV DISTRIBUTION |
| | : See next page DOCUMENT NAME: |
| | G:\DRSIII\DRS\W IP 2\PAL 2014 405 DRS OUO Cover Letter GPH.docx |
| | -Publicly Available |
| | -Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/enc l "N" = No copy OFFICE RIII RIII NAME GHansen:ls SOrth for RSkokowski DATE 11/21/14 11/21/14 OFFICIAL RECORD COPY Letter to Anthony Vitale from Richard A. Skokowski dated November 21, 201 4. |
| | |
| | SUBJECT: PALISADES NUCLEAR PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000255/2014405 DISTRIBUTION |
| | : John Jandovitz RidsNrrPMPalisades Resource RidsNrrDorlLpl3 |
| | -1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn |
| | |
| | DRPIII DRSIII Jim Clay Carmen Olteanu ROPreports Resource |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 IR 05000255/20220022022-08-0303 August 2022 Integrated Inspection Report 05000255/2022002 IR 05000255/20220012022-05-13013 May 2022 Integrated Inspection Report 05000255/2022001 IR 05000255/20220102022-04-0101 April 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2022010 IR 05000255/20210062022-03-0202 March 2022 Annual Assessment Letter for Palisades Nuclear Plant, Unit 1, (Report 05000255/2021006) IR 05000255/20210102022-02-24024 February 2022 Triennial Fire Protection Inspection Report 05000255/2021010 IR 05000255/20210042022-02-0808 February 2022 Integrated Inspection Report 05000255/2021004 and Exercise of Enforcement Discretion IR 05000255/20214042021-11-15015 November 2021 NRC Independent Spent Fuel Storage Installation Security Inspection Report 05000255/2021404 and 07200007/2021401 IR 05000255/20210032021-11-0303 November 2021 Integrated Inspection Report 05000255/2021003 IR 05000255/20214032021-10-21021 October 2021 Material Control and Accounting Program Inspection Report 05000255/2021403 IR 05000255/20214022021-10-0606 October 2021 Security Baseline Inspection Report 05000255/2021402 IR 05000255/20210052021-09-0101 September 2021 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2021005) IR 05000255/20210022021-08-10010 August 2021 Integrated Inspection Report 05000255/2021002 ML21197A0322021-07-21021 July 2021 Review of the Fall 2020 Steam Generator Tube Inspection Report IR 05000255/20210012021-05-12012 May 2021 Integrated Inspection Report 05000255/2021001 IR 05000255/20214012021-04-14014 April 2021 Security Baseline Inspection Report 05000255/2021401 IR 05000255/20200062021-03-0404 March 2021 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2020006) IR 05000255/20200042021-02-11011 February 2021 Integrated Inspection Report 05000255/2020004 IR 05000255/20204012021-01-0606 January 2021 Security Baseline Inspection Report 05000255/2020401 ML20342A1812020-12-10010 December 2020 Security Inspection Report Cover Letter 05000255/2020420 IR 05000255/20204202020-12-10010 December 2020 Security Inspection Report 05000255/2020420 IR 05000255/20204022020-11-30030 November 2020 Cyber Security Inspection Report 05000255/2020402 IR 05000255/20205012020-11-20020 November 2020 Emergency Preparedness Inspection Report 05000255/2020501 IR 05000255/20200032020-11-13013 November 2020 Integrated Inspection Report 05000255/2020003 IR 05000255/20200052020-09-0101 September 2020 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2020005) IR 05000255/20200102020-08-24024 August 2020 Biennial Problem Identification and Resolution Inspection Report 05000255/2020010 IR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 IR 05000255/20200022020-08-11011 August 2020 Integrated Inspection Report 05000255/2020002 and Exercise of Enforcement Discretion IR 05000255/20010082020-05-12012 May 2020 Final ASP Analysis - Palisades (IR 050002552001008) IR 05000255/20200012020-05-12012 May 2020 Integrated Inspection Report 05000255/2020001 IR 05000255/20200112020-04-21021 April 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000255/2020011 IR 05000254/20204012020-03-23023 March 2020 Security Baseline Inspection Report 05000254/2020401 and 05000265/2020401 IR 05000255/20190062020-03-0303 March 2020 Annual Assessment Letter Palisades Nuclear Plant (Report 05000255/2019006) IR 05000255/20190042020-01-28028 January 2020 Integrated Inspection Report 05000255/2019004 and 07200007/2019001 ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 IR 05000255/20190112019-11-27027 November 2019 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2019011 IR 05000255/20194112019-11-25025 November 2019 Security Baseline Inspection Report 05000255/2019411 and Independent Spent Fuel Storage Security Inspection Report 07200007/2019401 (Cover Letter Only) (DRS-M.Ziolkowski) IR 05000255/20190032019-11-14014 November 2019 Integrated Inspection Report 05000255/2019003 IR 05000255/20190102019-10-29029 October 2019 Reissue - Palisades Nuclear Plant - Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 ML19294A2872019-10-21021 October 2019 Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 IR 05000255/20190052019-08-28028 August 2019 Updated Inspection Plan for Palisades Nuclear Plant, Unit 1 (Report 05000255/2019005) ML19210D4022019-07-29029 July 2019 Ltr. 07/29/19 Palisades Nuclear Plant - Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000255/2019011 (DRS-D.Szwarc) IR 05000255/20190022019-07-26026 July 2019 Integrated Inspection Report 05000255/2019002 IR 05000255/20194102019-06-0404 June 2019 NRC Security Baseline Inspection Report 05000255/2019410 (Cover Letter Only) (DRS-N.Egan) IR 05000255/20190012019-05-10010 May 2019 Errata - Palisades Nuclear Plant, Unit 1 - NRC Integrated Inspection Report 05000255/2019001 ML19123A1742019-05-0303 May 2019 NRC Integrated Inspection Report 05000255/2019001 IR 05000255/20150032019-04-11011 April 2019 Errata - Palisades Nuclear Plant, NRC Integrated Inspection Report 05000255/2015003 (DRS-K.Stoedter) 2023-07-19
[Table view] Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
-4352 November 21, 2014 Mr. Anthony Vitale Vice-President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043
-9530
SUBJECT: PALISADES NUCLEAR PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000255/201 4 40 5
Dear Mr. Vitale:
On October 9, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Baseline Inspection of your Palisades Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on Octobe r 9, 2014, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
One self-revealing finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) was identified during this inspection.
The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. As documented in EA
-14-013, Confirmatory Order, dated July 21, 2014, the NRC is not issuing enforcement action related to this finding.
Further, a licensee-identified violation which was determined to be of very low security significance (Green) is listed in this report. The NRC is treating th i s violation as Non-Cited Violation (NCV) consistent with Section 2.3.2 of the NRC's Enforcement Policy.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. The finding had a cross
-cutting aspect in the area of Human Performance, Consistent Process (H.13), for failing to use a consistent, systematic approach to make decisions related to verifying security officer qualifications. If you disagree with a cross
-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report with the basis for your disagreement to the Regional Administrator, Region III and the NRC Resident Inspector at the Palisades Nuclear Plant.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security
-Related Information in accordance with 10 CFR 2.390(d)(1)
and its disclosure to unauthorized individuals could present a security vulnerability.
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information
- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,/RA by S. K. Orth Acting For/
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50
-255 License No. DPR
-20 Nonpublic
Enclosure:
Inspection Report 05000255/2014405
w/Attachment:
Supplemental Information cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR
T. Dimitriadis, RI B. Desai, RII M. Haire, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl:
Distribution via LISTSERV A. Vital e -2- The finding had a cross
-cutting aspect in the area of Human Performance, Consistent Process (H.13), for failing to use a consistent, systematic approach to make decisions related to verifying security officer qualifications. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report with the basis for your disagreement to the Regional Administrator, Region III and the NRC Resident Inspector at the Palisades Nuclear Plant.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security
-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information
- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,/RA by S. K. Orth Acting For/
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50
-255 License No. DPR
-20 Nonpublic
Enclosure:
Inspection Report 05000255/2014405
w/Attachment:
Supplemental Information cc w/encl:
N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl:
Distribution via LISTSERV DISTRIBUTION
- See next page DOCUMENT NAME:
G:\DRSIII\DRS\W IP 2\PAL 2014 405 DRS OUO Cover Letter GPH.docx
-Publicly Available
-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/enc l "N" = No copy OFFICE RIII RIII NAME GHansen:ls SOrth for RSkokowski DATE 11/21/14 11/21/14 OFFICIAL RECORD COPY Letter to Anthony Vitale from Richard A. Skokowski dated November 21, 201 4.
SUBJECT: PALISADES NUCLEAR PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000255/2014405 DISTRIBUTION
- John Jandovitz RidsNrrPMPalisades Resource RidsNrrDorlLpl3
-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn
DRPIII DRSIII Jim Clay Carmen Olteanu ROPreports Resource