| Q | CCA | Title |
---|
05000255/FIN-2014002-02 | 2014Q1 | P.2 | Failure to Complete Volumetric Examinations for DM Butt Welds in Branch Connections |
05000255/FIN-2014002-03 | 2014Q1 | | Spent Fuel Pool Region II Criticality Analysis |
05000255/FIN-2014406-02 | 2014Q1 | | Security |
05000255/FIN-2014406-01 | 2014Q1 | | Security |
05000255/FIN-2014403-01 | 2014Q1 | H.13 | Security |
05000255/FIN-2014002-01 | 2014Q1 | H.3 | Inadequate Installation of Steam Generator Nozzle Dams |
05000255/FIN-2014002-04 | 2014Q1 | | Introduction of Foreign Material Into the SW System |
05000255/FIN-2014002-05 | 2014Q1 | | Failure to Follow Procedures During Reactor Vessel Head Lift |
05000255/FIN-2014002-06 | 2014Q1 | | Failure to Maintain Radiation Exposure ALARA on CRDM 24 Repairs |
05000255/FIN-2014003-03 | 2014Q2 | | Failure to Notify the NRC Within 30 Days of Discovering Changes in Medical Conditions |
05000255/FIN-2014003-04 | 2014Q2 | H.4 | Failure to Evaluate Long-Term Scaffolds in Accordance with Procedures |
05000255/FIN-2014003-02 | 2014Q2 | H.8 | Exam Security Issues |
05000255/FIN-2014003-01 | 2014Q2 | | Written NRC Biennial Written Examinations Did Not Meet Qualitative Standards |
05000255/FIN-2014004-03 | 2014Q3 | | Failure to Evaluate the Adverse Effects of the Use of Non-Seismic Temporary Jumpers |
05000255/FIN-2014004-02 | 2014Q3 | P.5 | Spent Fuel Pool Region II Criticality Analysis |
05000255/FIN-2014004-01 | 2014Q3 | H.9 | Inadequate Procedure for Protection against High Winds |
05000255/FIN-2014008-09 | 2014Q4 | | Failure To Include The Degraded Voltage Channel Time Delay In TS Surveillance Requirement 3.3.5.2.a |
05000255/FIN-2014008-12 | 2014Q4 | | Component Cooling Water System Licensing Bases |
05000255/FIN-2014008-11 | 2014Q4 | | Classification of CCW Piping and Components Inside the Reactor Containment Building |
05000255/FIN-2014008-10 | 2014Q4 | | Lack of Analysis for Electrical Containment Penetration Protection |
05000255/FIN-2014008-08 | 2014Q4 | H.14 | Failure to Establish an Adequate Test Program for the Shutdown Cooling Heat Exchangers |
05000255/FIN-2014008-07 | 2014Q4 | | Failure to Identify Non-Safety-Related Sub-Components Improperly Supplied with Safety-Related Valves |
05000255/FIN-2014008-06 | 2014Q4 | | Failure to Correctly Translate Valve Leakage Limits into Test Procedure |
05000255/FIN-2014405-01 | 2014Q4 | | Security |
05000255/FIN-2014005-01 | 2014Q4 | P.1 | Failure to Follow Procedure for Storage of Equipment in the Vicinity of Safety-Related Equipment |
05000255/FIN-2014008-13 | 2014Q4 | H.1 | Non-Conservative Surveillance for Emergency Diesel Generator Largest Load Reject Test |
05000255/FIN-2014008-05 | 2014Q4 | P.2 | Failure to Perform Comprehensive Pump Testing of Containment Spray Pump P-54A in accordance with the Inservice Testing Program |
05000255/FIN-2014008-04 | 2014Q4 | | Failure to Ensure that 480V System Voltages do not Exceed Equipment Ratings |
05000255/FIN-2014008-03 | 2014Q4 | H.6 | Undersized Motors |
05000255/FIN-2014008-02 | 2014Q4 | H.6 | Undersized Supply Cables from Startup Transformer to 2400V Buses |
05000255/FIN-2014008-01 | 2014Q4 | | Failure to Ensure Engineered Safeguards Systems Arent Adversely Affected By Air Entrainment |
05000255/FIN-2014010-01 | 2014Q4 | H.3 | Failure to Monitor The Highest Exposed Part Of The Compartment When Using EDEX |