|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402July 11, 201210 CFR 50.4ATTN: Document Control DeskU.S. Nuclear Regulatory CommissionWashington, D.C. 20555-0001Sequoyah Nuclear Plant, Units 1 and 2Facility Operating License Nos. DPR-77 and DPR-79NRC Docket Nos. 50-327 and 50-328Subject: Response to NRC Regulatory Issue Summary 2012-07, Preparationand Scheduling of Operator Licensing ExaminationsReference: 1. NRC Regulatory Issue Summary 2012-07, "Preparation andScheduling of Operator Licensing Examinations,"dated June 8, 20122. Letter from TVA to NRC, "Response to NRC Regulatory IssueSummary 2011-04, Preparation and Scheduling of OperatorLicensing Examinations," dated July 7, 2011Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2012-07(Reference 1) requested specific information regarding the Sequoyah NuclearPlant's (SQN) projected operator licensing examination schedules and the estimatednumber of applicants. The enclosure to this letter addresses the NRC's request andprovides an estimate of the examination requirements for the SQN on NRC Form 536,"Operator Licensing Examination Data." SQN has no initial operator licenseexamination planned for calendar year 2014.Please note that the information provided in the enclosure updates the informationpreviously provided in Reference 2. Information on the proposed GenericFundamentals Examination (GFE) schedule for calendar year 2013 is provided sincethe estimated number of candidates has been revised and also includes a changefrom June to September.Printed on recycled paper | | {{#Wiki_filter:Tennessee |
| U.S. Nuclear Regulatory CommissionPage 2July 11, 2012There are no regulatory commitments associated with this submittal. If you have anyquestions related to this response, please contact Rusty Proffitt at (423) 843-6651.Res tfully,SheacV c President, Nuclear LicensingEnclosure:NRC Form 536, Operator Licensing Examination Datacc (Enclosure):NRC Regional Administrator -Region IINRC Senior Resident Inspector -Sequoyah Nuclear Plant | | Valley Authority, 1101 Market Street, Chattanooga, Tennessee |
| ENCLOSURENRC Form 536Operator Licensing Examination DataTennessee Valley AuthoritySequoyah Nuclear PlantNRC Docket Nos. 50-327 and 50-328
| | 37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory |
| NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130120145-201"1) Estimated burden per response to comply with this voluntary information collection request:hour. This inforrnation collection is used to plan budgets and resources for operatorexaminations. Send comments-regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC .or by nterna e-mail to lrfocolect&Resource@nrc.gov. and to the Desk Ofkcr, Office of Information andEXAMINATION DATA Regulatory Affairs, NEOB.-10202, (3150-0131), Ofttce of Management and Budget, Washington,DC 20503. If a means used'to impose an information collection does not display a currentlyvalid OMBcontrol number, the NRC may not conduct or sponsor, and a person is riot required torespond to, the information cogection.FACILITY NRC REKGONSequoyah Nuclear Plant Region IIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015ESTIMATED NUMBER OFLICENSEE-PREPARED ] 1 1EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015NUMBER OF REACTOROPERATORS 7 8 8NUMBER OF SENIOR REACTOROPERATORS -INSTANT 2 6 7 3NUMBER OF SENIOR REACTOROPERATORS -UPGRADE I I I INUMBER OF SENIOR REACTOROPERATORS -LIMITED 0 0 0 0PROPOSED DATESPRIMARY D)ATE 05-13-20.13 12-02-2013 03-02-201.5 11.-30-2.015AL.TERNATE DATE 05-20-2013 12-09-2013 03-09-2015 12-07-2015C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2013 CY 2014P RO PO SED I_.. ... _ ........ ,I...... .,,I___NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 0 0 15 011 0 0CANDIDATESNRC FORM 536 (9-2011) | | Commission |
| NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 09/30/2014I(9-2011) Estimated burden per response to comply with this voluntary information collection request: Ihour. This intotmaiion coitectiorn is used to plan budgets and resources otI operatorexaEminatons. Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet eEXAMINATION DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on andRegulatory Affairs, NEOB-10202, (3150-0131), 0ffce of Management and Budget, Washington,DC 20503. It a means used to impose an information collection does not display a currentlyvalid OMB control number, the NRC may not conduct or sponsor, and a person is not required:torespond to, the information collection.FACILITY NRC REGIONSequoyah Nuclear Plant Region IIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/AESTIMATED NUMBER OFLICENSEE-PREPAREDEXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/ANUMBER OF REACTOROPERATORS 8 8NUMBER OF SENIOR REACTOROPERATORS -INSTANT 2NUMBER OF SENIOR REACTOROPERATORS -UPGRADE 1 2NUMBER OF SENIOR REACTOR o 0OPERArORS -LIMITEDPROPOSED DATESPRIMARY DATE 12-05-2016 12-04-2017ALTERNATE DATE 12-12-2016 12-11-2017C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 201.5 CY N/APROPOSED I INUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 0 11 0 0CANDIDATESNRC FORM 536 (9-2011) | | Washington, D.C. 20555-0001 |
| | | Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating |
| | License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Subject: Response to NRC Regulatory |
| | Issue Summary 2012-07, Preparation |
| | and Scheduling |
| | of Operator Licensing |
| | Examinations |
| | Reference: |
| | 1. NRC Regulatory |
| | Issue Summary 2012-07, "Preparation |
| | and Scheduling |
| | of Operator Licensing |
| | Examinations," dated June 8, 2012 2. Letter from TVA to NRC, "Response |
| | to NRC Regulatory |
| | Issue Summary 2011-04, Preparation |
| | and Scheduling |
| | of Operator Licensing |
| | Examinations," dated July 7, 2011 Nuclear Regulatory |
| | Commission's (NRC) Regulatory |
| | Issue Summary (RIS) 2012-07 (Reference |
| | 1) requested |
| | specific information |
| | regarding |
| | the Sequoyah Nuclear Plant's (SQN) projected |
| | operator licensing |
| | examination |
| | schedules |
| | and the estimated number of applicants. |
| | The enclosure |
| | to this letter addresses |
| | the NRC's request and provides an estimate of the examination |
| | requirements |
| | for the SQN on NRC Form 536,"Operator |
| | Licensing |
| | Examination |
| | Data." SQN has no initial operator license examination |
| | planned for calendar year 2014.Please note that the information |
| | provided in the enclosure |
| | updates the information |
| | previously |
| | provided in Reference |
| | 2. Information |
| | on the proposed Generic Fundamentals |
| | Examination (GFE) schedule for calendar year 2013 is provided since the estimated |
| | number of candidates |
| | has been revised and also includes a change from June to September. |
| | Printed on recycled paper |
| | U.S. Nuclear Regulatory |
| | Commission |
| | Page 2 July 11, 2012 There are no regulatory |
| | commitments |
| | associated |
| | with this submittal. |
| | If you have any questions |
| | related to this response, please contact Rusty Proffitt at (423) 843-6651.Res tfully, Shea cV c President, Nuclear Licensing Enclosure: |
| | NRC Form 536, Operator Licensing |
| | Examination |
| | Data cc (Enclosure): |
| | NRC Regional Administrator |
| | -Region II NRC Senior Resident Inspector |
| | -Sequoyah Nuclear Plant |
| | ENCLOSURE NRC Form 536 Operator Licensing |
| | Examination |
| | Data Tennessee |
| | Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328 |
| | NRC FORM 536 U.S. NUCLEAR REGULATORY |
| | COMMISSION |
| | APPROVED BY OMB: NO. 3150-0131 |
| | EXPIRES: 0913012014 |
| | 5-201"1) Estimated |
| | burden per response to comply with this voluntary |
| | information |
| | collection |
| | request: hour. This inforrnation |
| | collection |
| | is used to plan budgets and resources |
| | for operator examinations. |
| | Send comments-regarding |
| | burden estimate to the Information |
| | Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nudear Regulatory |
| | Commission, Washington, DC .or by nterna e-mail to lrfocolect&Resource@nrc.gov. |
| | and to the Desk Ofkcr, Office of Information |
| | and EXAMINATION |
| | DATA Regulatory |
| | Affairs, NEOB.-10202, (3150-0131), Ofttce of Management |
| | and Budget, Washington, DC 20503. If a means used'to impose an information |
| | collection |
| | does not display a currently valid OMBcontrol |
| | number, the NRC may not conduct or sponsor, and a person is riot required to respond to, the information |
| | cogection. |
| | FACILITY NRC REKGON Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION |
| | PREPARATION |
| | SCHEDULE PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 ESTIMATED |
| | NUMBER OF LICENSEE-PREPARED |
| | ] 1 1 EXAMINATIONS |
| | ESTIMATED |
| | NUMBER OF NRC-PREPARED |
| | 0 0 0 0 EXAMINATIONS |
| | B. INITIAL OPERATOR LICENSE EXAMINATIONS |
| | PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 NUMBER OF REACTOR OPERATORS |
| | 7 8 8 NUMBER OF SENIOR REACTOR OPERATORS |
| | -INSTANT 2 6 7 3 NUMBER OF SENIOR REACTOR OPERATORS |
| | -UPGRADE I I I I NUMBER OF SENIOR REACTOR OPERATORS |
| | -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY D)ATE 05-13-20.13 |
| | 12-02-2013 |
| | 03-02-201.5 |
| | 11.-30-2.015 |
| | AL.TERNATE |
| | DATE 05-20-2013 |
| | 12-09-2013 |
| | 03-09-2015 |
| | 12-07-2015 |
| | C. PROPOSED GENERIC FUNDAMENTALS |
| | EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 P RO PO SED I_.. ... _ ........ ,I...... .,,I___NUMBER MARCH JUNE SEPTEMBER |
| | DECEMBER MARCH JUNE SEPTEMBER |
| | DECEMBER ESTIMATED NUMBER OF 0 0 15 011 0 0 CANDIDATES |
| | NRC FORM 536 (9-2011) |
| | NRC FORM 536 U.S. NUCLEAR REGULATORY |
| | COMMISSION |
| | APPROVED BY OMB: NO, 3150-0131 |
| | EXPIRES: 09/30/2014 |
| | I(9-2011) |
| | Estimated |
| | burden per response to comply with this voluntary |
| | information |
| | collection |
| | request: I hour. This intotmaiion |
| | coitectiorn |
| | is used to plan budgets and resources |
| | otI operator exaEminatons. |
| | Send comments regarding |
| | burden estimate to the Information |
| | Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory |
| | Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION |
| | DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on |
| | and Regulatory |
| | Affairs, NEOB-10202, (3150-0131), 0ffce of Management |
| | and Budget, Washington, DC 20503. It a means used to impose an information |
| | collection |
| | does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required:to |
| | respond to, the information |
| | collection. |
| | FACILITY NRC REGION Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION |
| | PREPARATION |
| | SCHEDULE PROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/A ESTIMATED |
| | NUMBER OF LICENSEE-PREPARED |
| | EXAMINATIONS |
| | ESTIMATED |
| | NUMBER OF NRC-PREPARED |
| | 0 0 EXAMINATIONS |
| | B. INITIAL OPERATOR LICENSE EXAMINATIONS |
| | PROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/A NUMBER OF REACTOR OPERATORS |
| | 8 8 NUMBER OF SENIOR REACTOR OPERATORS |
| | -INSTANT 2 NUMBER OF SENIOR REACTOR OPERATORS |
| | -UPGRADE 1 2 NUMBER OF SENIOR REACTOR o 0 OPERArORS |
| | -LIMITED PROPOSED DATES PRIMARY DATE 12-05-2016 |
| | 12-04-2017 |
| | ALTERNATE |
| | DATE 12-12-2016 |
| | 12-11-2017 |
| | C. PROPOSED GENERIC FUNDAMENTALS |
| | EXAMINATION (GFE) SCHEDULE CY 201.5 CY N/A PROPOSED I I NUMBER MARCH JUNE SEPTEMBER |
| | DECEMBER MARCH JUNE SEPTEMBER |
| | DECEMBER ESTIMATED NUMBER OF 0 11 0 0 CANDIDATES |
| | NRC FORM 536 (9-2011) |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) ML23257A0062023-09-14014 September 2023 Enforcement Action EA-22-129 Inspection Postponement Request ML23254A2192023-09-11011 September 2023 Emergency Plan Implementing Procedure Revisions ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 ML23233A0122023-08-17017 August 2023 Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML23215A1572023-08-0303 August 2023 Enforcement Action EA-22-129 Inspection Readiness Notification CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-01-04
[Table view] Category:License-Operator
MONTHYEARML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML22322A1072022-11-18018 November 2022 2023-301 Sequoyah - Licensed Operator Retake Initial Examination Corporate Notification Letter IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 ML22200A0402022-07-19019 July 2022 Exam Post Exam Comments ML22132A0282022-05-10010 May 2022 NRC Operator Licensing Examination Approval 05000327/2022301 and 05000328/2022301 ML22095A2632022-04-0505 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21286A6232021-10-13013 October 2021 301 Exam Corporate Notification Letter Aka 210-day Letter ML21111A0772021-04-20020 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20226A0972020-08-13013 August 2020 File 2B, Normal Release Exam Doc- 8-Written Exam Grading Quality Check Sheet (ES-403-1) ML20225A0292020-08-12012 August 2020 File 2A-3 Exam Administrative Items (Delayed Release) ML20225A0242020-08-12012 August 2020 File 2A-2 Exam Final Items (Delayed Release) ML20106F0732020-04-14014 April 2020 301 Final RO Written Exam ML20106F0992020-04-14014 April 2020 301 Final SRO Written Exam ML20106F0712020-03-31031 March 2020 301 Post Exam Comments ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18045A0772018-02-14014 February 2018 301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 Yrs ML18045A0712018-02-14014 February 2018 301 Post Exam Comments ML18045A1232018-02-14014 February 2018 301 Final As-Given SRO Written Exam with Answer Key - Delay Release 2 Yrs ML17352B2242017-12-11011 December 2017 NRC Operator Licensing Examination Approval 05000327/2017301 and 05000328/2017301 ML17307A2832017-11-0303 November 2017 Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17263B1802017-09-20020 September 2017 Draft SRO Written Exam - Delay Release 2 Yrs ML17263B1792017-09-20020 September 2017 Draft RO Written Exam - Delay Release 2 Yrs ML17209B2092017-07-28028 July 2017 Draft Admin JPMs ML17209A9782017-07-28028 July 2017 Draft Administrative Documents ML17193A9652017-07-12012 July 2017 (Retake) 2016-302 Exam Administrative Items - Delay Release 2 Yrs ML17193A9632017-07-12012 July 2017 (Retake) 2016-302 Exam Final Items - Delay Release 2 Yrs ML17193A9612017-07-12012 July 2017 (Retake) 2016-302 Exam Draft Items - Delay Release 2 Yrs ML17125A0792017-05-0404 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16201A1192016-07-18018 July 2016 (Retake) Operator Licensing Operating Test Approval 05000327/2016302 and 05000328/2016302 ML16200A0372016-07-18018 July 2016 Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML16190A4252016-07-0505 July 2016 June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter ML16110A0272016-04-18018 April 2016 (Section 8) Sequoyah Initial Exam 2016-301 Final RO Written Exam ML16068A4452016-03-0303 March 2016 Operator Licensing Written Examination Approval 05000327,328/2016301 ML15293A5332015-10-20020 October 2015 Examination 05000327/2016301 and 0500328/2016301, October 15, 2015, Sequoyah Nuclear Plant - Notification of Licensed Operator ML15126A4392015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15126A4462015-05-0606 May 2015 Initial Exam 2015-301 Post Exam Comments ML15126A4442015-05-0606 May 2015 Initial Exam 2015-301 Final Sim IN-Plant JPMs ML15126A4402015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative Documents ML15126A4232015-05-0606 May 2015 Initial Exam 2015-301 Draft Sim IN-Plant JPMs ML15126A4212015-05-0606 May 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15126A4182015-05-0606 May 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15126A4162015-05-0606 May 2015 Initial Exam 2015-301 Draft RO Written Exam ML15126A4112015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative Documents ML15126A4412015-05-0606 May 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15126A4452015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative JPMs ML15092A8482015-04-0202 April 2015 Initial Exam 2015-301 Final RO Written Exam ML15092A8542015-04-0202 April 2015 Initial Exam 2015-301 Final SRO Written Exam 2023-08-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML22322A1072022-11-18018 November 2022 2023-301 Sequoyah - Licensed Operator Retake Initial Examination Corporate Notification Letter IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 ML22200A0402022-07-19019 July 2022 Exam Post Exam Comments ML22132A0282022-05-10010 May 2022 NRC Operator Licensing Examination Approval 05000327/2022301 and 05000328/2022301 ML22095A2632022-04-0505 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21286A6232021-10-13013 October 2021 301 Exam Corporate Notification Letter Aka 210-day Letter ML21111A0772021-04-20020 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20226A0972020-08-13013 August 2020 File 2B, Normal Release Exam Doc- 8-Written Exam Grading Quality Check Sheet (ES-403-1) ML20225A0242020-08-12012 August 2020 File 2A-2 Exam Final Items (Delayed Release) ML20225A0292020-08-12012 August 2020 File 2A-3 Exam Administrative Items (Delayed Release) ML20106F0732020-04-14014 April 2020 301 Final RO Written Exam ML20106F0992020-04-14014 April 2020 301 Final SRO Written Exam ML20106F0712020-03-31031 March 2020 301 Post Exam Comments ML18045A0712018-02-14014 February 2018 301 Post Exam Comments ML18045A1232018-02-14014 February 2018 301 Final As-Given SRO Written Exam with Answer Key - Delay Release 2 Yrs ML18045A0772018-02-14014 February 2018 301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 Yrs ML17352B2242017-12-11011 December 2017 NRC Operator Licensing Examination Approval 05000327/2017301 and 05000328/2017301 ML17307A2832017-11-0303 November 2017 Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17263B1792017-09-20020 September 2017 Draft RO Written Exam - Delay Release 2 Yrs ML17263B1802017-09-20020 September 2017 Draft SRO Written Exam - Delay Release 2 Yrs ML17209A9782017-07-28028 July 2017 Draft Administrative Documents ML17209B2092017-07-28028 July 2017 Draft Admin JPMs ML17193A9632017-07-12012 July 2017 (Retake) 2016-302 Exam Final Items - Delay Release 2 Yrs ML17193A9652017-07-12012 July 2017 (Retake) 2016-302 Exam Administrative Items - Delay Release 2 Yrs ML17193A9612017-07-12012 July 2017 (Retake) 2016-302 Exam Draft Items - Delay Release 2 Yrs ML17125A0792017-05-0404 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16201A1192016-07-18018 July 2016 (Retake) Operator Licensing Operating Test Approval 05000327/2016302 and 05000328/2016302 ML16200A0372016-07-18018 July 2016 Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML16110A0272016-04-18018 April 2016 (Section 8) Sequoyah Initial Exam 2016-301 Final RO Written Exam ML16068A4452016-03-0303 March 2016 Operator Licensing Written Examination Approval 05000327,328/2016301 ML15293A5332015-10-20020 October 2015 Examination 05000327/2016301 and 0500328/2016301, October 15, 2015, Sequoyah Nuclear Plant - Notification of Licensed Operator ML15126A4392015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15126A4462015-05-0606 May 2015 Initial Exam 2015-301 Post Exam Comments ML15126A4452015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative JPMs ML15126A4402015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative Documents ML15126A4232015-05-0606 May 2015 Initial Exam 2015-301 Draft Sim IN-Plant JPMs ML15126A4212015-05-0606 May 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15126A4182015-05-0606 May 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15126A4162015-05-0606 May 2015 Initial Exam 2015-301 Draft RO Written Exam ML15126A4112015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative Documents ML15126A4442015-05-0606 May 2015 Initial Exam 2015-301 Final Sim IN-Plant JPMs ML15126A4412015-05-0606 May 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15092A8482015-04-0202 April 2015 Initial Exam 2015-301 Final RO Written Exam ML15092A8542015-04-0202 April 2015 Initial Exam 2015-301 Final SRO Written Exam ML14080A0292014-03-21021 March 2014 Initial Exam 2013-302 Draft Administrative Documents ML14080A0322014-03-21021 March 2014 Initial Exam 2013-302 Draft RO Written Exam ML14080A0332014-03-21021 March 2014 Initial Exam 2013-302 Draft SRO Written Exam 2023-08-03
[Table view] |
See also: RIS 2012-07
Text
Tennessee
Valley Authority, 1101 Market Street, Chattanooga, Tennessee
37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory
Commission
Washington, D.C. 20555-0001
Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating
License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Subject: Response to NRC Regulatory
Issue Summary 2012-07, Preparation
and Scheduling
of Operator Licensing
Examinations
Reference:
1. NRC Regulatory
Issue Summary 2012-07, "Preparation
and Scheduling
of Operator Licensing
Examinations," dated June 8, 2012 2. Letter from TVA to NRC, "Response
to NRC Regulatory
Issue Summary 2011-04, Preparation
and Scheduling
of Operator Licensing
Examinations," dated July 7, 2011 Nuclear Regulatory
Commission's (NRC) Regulatory
Issue Summary (RIS) 2012-07 (Reference
1) requested
specific information
regarding
the Sequoyah Nuclear Plant's (SQN) projected
operator licensing
examination
schedules
and the estimated number of applicants.
The enclosure
to this letter addresses
the NRC's request and provides an estimate of the examination
requirements
for the SQN on NRC Form 536,"Operator
Licensing
Examination
Data." SQN has no initial operator license examination
planned for calendar year 2014.Please note that the information
provided in the enclosure
updates the information
previously
provided in Reference
2. Information
on the proposed Generic Fundamentals
Examination (GFE) schedule for calendar year 2013 is provided since the estimated
number of candidates
has been revised and also includes a change from June to September.
Printed on recycled paper
U.S. Nuclear Regulatory
Commission
Page 2 July 11, 2012 There are no regulatory
commitments
associated
with this submittal.
If you have any questions
related to this response, please contact Rusty Proffitt at (423) 843-6651.Res tfully, Shea cV c President, Nuclear Licensing Enclosure:
NRC Form 536, Operator Licensing
Examination
Data cc (Enclosure):
NRC Regional Administrator
-Region II NRC Senior Resident Inspector
-Sequoyah Nuclear Plant
ENCLOSURE NRC Form 536 Operator Licensing
Examination
Data Tennessee
Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328
NRC FORM 536 U.S. NUCLEAR REGULATORY
COMMISSION
APPROVED BY OMB: NO. 3150-0131
EXPIRES: 0913012014
5-201"1) Estimated
burden per response to comply with this voluntary
information
collection
request: hour. This inforrnation
collection
is used to plan budgets and resources
for operator examinations.
Send comments-regarding
burden estimate to the Information
Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nudear Regulatory
Commission, Washington, DC .or by nterna e-mail to lrfocolect&Resource@nrc.gov.
and to the Desk Ofkcr, Office of Information
and EXAMINATION
DATA Regulatory
Affairs, NEOB.-10202, (3150-0131), Ofttce of Management
and Budget, Washington, DC 20503. If a means used'to impose an information
collection
does not display a currently valid OMBcontrol
number, the NRC may not conduct or sponsor, and a person is riot required to respond to, the information
cogection.
FACILITY NRC REKGON Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION
PREPARATION
SCHEDULE PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 ESTIMATED
NUMBER OF LICENSEE-PREPARED
] 1 1 EXAMINATIONS
ESTIMATED
NUMBER OF NRC-PREPARED
0 0 0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 NUMBER OF REACTOR OPERATORS
7 8 8 NUMBER OF SENIOR REACTOR OPERATORS
-INSTANT 2 6 7 3 NUMBER OF SENIOR REACTOR OPERATORS
-UPGRADE I I I I NUMBER OF SENIOR REACTOR OPERATORS
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY D)ATE 05-13-20.13
12-02-2013
03-02-201.5
11.-30-2.015
AL.TERNATE
DATE 05-20-2013
12-09-2013
03-09-2015
12-07-2015
C. PROPOSED GENERIC FUNDAMENTALS
EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 P RO PO SED I_.. ... _ ........ ,I...... .,,I___NUMBER MARCH JUNE SEPTEMBER
DECEMBER MARCH JUNE SEPTEMBER
DECEMBER ESTIMATED NUMBER OF 0 0 15 011 0 0 CANDIDATES
NRC FORM 536 (9-2011)
NRC FORM 536 U.S. NUCLEAR REGULATORY
COMMISSION
APPROVED BY OMB: NO, 3150-0131
EXPIRES: 09/30/2014
I(9-2011)
Estimated
burden per response to comply with this voluntary
information
collection
request: I hour. This intotmaiion
coitectiorn
is used to plan budgets and resources
otI operator exaEminatons.
Send comments regarding
burden estimate to the Information
Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION
DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on
and Regulatory
Affairs, NEOB-10202, (3150-0131), 0ffce of Management
and Budget, Washington, DC 20503. It a means used to impose an information
collection
does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required:to
respond to, the information
collection.
FACILITY NRC REGION Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION
PREPARATION
SCHEDULE PROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/A ESTIMATED
NUMBER OF LICENSEE-PREPARED
EXAMINATIONS
ESTIMATED
NUMBER OF NRC-PREPARED
0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/A NUMBER OF REACTOR OPERATORS
8 8 NUMBER OF SENIOR REACTOR OPERATORS
-INSTANT 2 NUMBER OF SENIOR REACTOR OPERATORS
-UPGRADE 1 2 NUMBER OF SENIOR REACTOR o 0 OPERArORS
-LIMITED PROPOSED DATES PRIMARY DATE 12-05-2016
12-04-2017
ALTERNATE
DATE 12-12-2016
12-11-2017
C. PROPOSED GENERIC FUNDAMENTALS
EXAMINATION (GFE) SCHEDULE CY 201.5 CY N/A PROPOSED I I NUMBER MARCH JUNE SEPTEMBER
DECEMBER MARCH JUNE SEPTEMBER
DECEMBER ESTIMATED NUMBER OF 0 11 0 0 CANDIDATES
NRC FORM 536 (9-2011)