ML20237B673: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 26: Line 26:


==References:==
==References:==
: 1. Enclosure 2, Status Report, Georgia Tech letter dated October 6,1997 1
: 1. Enclosure 2, Status Report, Georgia Tech {{letter dated|date=October 6, 1997|text=letter dated October 6,1997}} 1
2, Georgia Tech Research Reactor NRC Amendment 12 to Facility License No. R-97
2, Georgia Tech Research Reactor NRC Amendment 12 to Facility License No. R-97
: 3. NRC Docket No. 50-160
: 3. NRC Docket No. 50-160

Revision as of 17:26, 19 March 2021

Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program for Month of Jul 1998
ML20237B673
Person / Time
Site: Neely Research Reactor
Issue date: 08/10/1998
From: Davidson J
Neely Research Reactor, ATLANTA, GA
To: Mendonca M
NRC (Affiliation Not Assigned)
References
NUDOCS 9808190141
Download: ML20237B673 (2)


Text

. - -- - __ . - - --

Georgia 0tmgGBm0@

m @9TechEm@D@gy

  • . College of Engineering Office of the Dean August 10,1998 Docket No. 50-160 United States Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Attention: Mr. Marvin M. Mendonca, Senior Project Manager .,

Non-Power Reactors and Decommissioning Project Directorate i Division of Reactor Program Management Office of Nuclear Reactor Regulation

Subject:

Monthly Status Report for July 1998 Georgia Tech Research Reactor (GTRR) D&D Project

References:

1. Enclosure 2, Status Report, Georgia Tech letter dated October 6,1997 1

2, Georgia Tech Research Reactor NRC Amendment 12 to Facility License No. R-97

3. NRC Docket No. 50-160

Dear Mr. Mendonca:

Enclosed for your information is the status report for the Georgia Tech Research Reactor Deconunissioning Program for the month of July 1998.

If you have any questions regarding this information, please contact our project manag Mr. Bill Miller, i -. at 404-894-4610.

Sincerely, 1n

. Narl Davids

- Associate Dean

l. Chair, Technical Safety Review Committee Enclos Je: as stated 1

i-Cc: Dr. G. Wayne Clough, President, Georgia Institute of Technology Members of the Technical Safety Review Committee

[

Ms. Tammy Tuley, Georgia Tech Office of External Affairs c 0 L . uCUJ 3 r. n o k h 9908190141 990810 PDR ADOCK 05000160l P PDR ;

Collegeof Engineering Atlanta, Georgia 30332-0360 U.S.A.

[ PHONE 404 894 3350 FAX 404 894 0168 l A Unit of the Unitmity System of Georgia An Equal Educatum and Employment Opportunity Institution i ..

p ' . z, ..

c, ll lC MONTHLY STATUS REPORT-JULY 1998

- Docket No. 50-160 l

Georgia Tech Research Reactor Decommissioning Program

. Monthly Status Report for July 1998 l

A.' General' The GTRR remains under a safe shutdown condition. The reactor facility is in compliance with its license conditions and current technical specifications (10CFR50.51(b)).

l

j. ' B. Activities for the Month ofJune 1998
1. The draft Decommissioning Plan, Characterization Report, and Letter of Financial Intent were submitted to USNRC on July 6,1998.
2. The heavy water coolant was successfully removed from the Georgia Tech Research Reactor on July 20,1998, and shipped to DOE-Aiken.

j~ C. Planned Activities in August l

1.' Respond to USNRC inquiries regarding the Decommissioning Plan as required.