|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:N p, , |
| | * b / |
| | *~; .t a ','. * |
| | [O _ ;Q UNIVERSITY OF CALIFORNp3LOS ANGELES jf SIJLKELEY |
| | * DAVIS |
| | * IRVINE |
| | * 1.0S ANGELES |
| | * FIVERSIDE = SAN DIECO |
| | * SAN FRANCISCO SANTA BARBARA |
| | * SANT CRUZ SCHOOL OF ENCINEERING AND APPLIED SCIENCE |
| | * LOS ANGELES, CALIFORNIA 90024 January 30, 1976 |
| | .A . N |
| | . ' f |
| | ,' ,j',[ q., |
| | (X |
| | . '*.} # |
| | Karl R. Goller . |
| | ' [O t,,'"d )']d a f Assistant Director of Operating Reactors 'i . |
| | l Division of Reactor Licensing T 3 . . |
| | "'e q, * ' |
| | U.S. Nuclear Regulatory Commission . |
| | Washington, D.C. 20555 .'^~ |
| | um o |
| | ' -d ' |
| | |
| | ==Dear Mr. Coller:== |
| | |
| | Due to the sensitive nature of the contents of this letter, we request that this document be withheld from public disclosure pursuant to section 2.790 of 10 CFR Part 2. |
| | We have at this facility a full core loading of new fuel, fuel plate scrap, and uranyl nitrate solution, all at an enrichment of 93*.. |
| | Uc also have on hand two 32 gram Pu-239-Be neutron sources. This gives us a non-exempt SNM inventory. of Icss 'than 5 kg. , |
| | We request that we be allowed to retain this inventory for the following reasons: |
| | : a. To be abic to perform low power experiments along with computer code work, whereby irradiated fuel is temporarily replaced by ncn irradiated fuel. This would greatly reduce experimental error and personnel exposure, |
| | : b. To have on hand .'cw fuel to replace damaged fuel elements. |
| | : c. To have inherent flexibility because we are a university facility. Projects and experiments come up often with very littic 1 cad time. If we do not possess the proper material, it is more than likely that we may have extreme difficulty acquiring it and a finite possibility of not obtaining it. |
| | We therefore request permission to have on hand our existing SNM inventory. We have provided adequate protection according to NRC and have followed the advice of Doug Schuster of Region V to the letter. |
| | We are also within the limits set forth by 10 CFR. |
| | Sincerely yours, |
| | $[N Charles E. Ashbaugh III Reactor Supervisor 8210290051 820930 004 002-PDR FOIA HIRSCH82-381 PDR NUCLE AR ENERGY LADORATORY TItOMAS E. It!CKS. Professor and Director |
| | |
| | .. .w....an.... v........... |
| | N 4 |
| | 4,*Th'7,'f((,$. |
| | ? |
| | WASHit4GTCN. D. C' 20555 e- . 31.g,y: m. f a |
| | $, .cf / t January 29, 197d R. Purple, Chief, Operating Reactors Branch '1, D0k D. Ziemann, Chief, Operating Reactors Branch #2, DOR . |
| | ,G. Lear, Chief, Operating Reactors Branch #3, DOR- - |
| | R. Reid, Chief, Operating Reactors Branch :f 1, DOR WITIDIOLDING OF SPECIAL NUCLEAR !L\TERIAL (SNM) INVENTORY INFORMATION FOR NON-POWER REACTOR FACILITIES , |
| | * Although license authorization limits for SNM at non-power reactors are not . considered sensitive and c:ay be mentioned freely in any correspondence, the specific types, enrichments and amounts of SNM actually held on-hand by non-power reactor licensees should be |
| | " withheld from public disclosure". The amount .of-uranium - 235 (contained in uranium enriched to 20 percent or more'in the uranium - 235 isotope), uranius - 233, or plutoniun held by the licensee as unirradiated fuel is particularly sensitive intormation. , |
| | Therefore, in your preparation of safety evaluations or other documents for license amendments to reduce the authori:ation limit of SNM for non-power reactor licensecs, no reference should be made to the actual o,uantity of SN'! that a particular facility has on . |
| | hand. The current and projected authori:ation limits in the license l-e may,bc disclosed. * |
| | / ~& |
| | I - |
| | Karl R. Coller, Assistant Director |
| | . . . for Operating Reactors |
| | . Division of Operating Reactors |
| | ! l . |
| | -l . |
| | t l _ |
| | r i |
| | i i |
| | s |
| | ! t i |
| | l l . :. .. . s. . , ._- |
| | l . |
| | |
| | j:~pj G F g ) - ) ?/ |
| | \ A, - |
| | NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 IE Circular No. 76 - 03 DATE: September 13, 1976 RADIATION EXPOSURES IN REACTOR CAVITIES DESCRIPTION OF CIRCUMSTANCES: |
| | On March 18, 1976, an employee at the Zion station received a "whole body" radiation dose of 8 rems or more upon entering the cavity beneath the reactor vessel during a refueling out-age. On April 5, 1976, a similar reactor cavity entry at Indian Point resulted in a 10-rem whole body dose to a licen-see employee. A similar entry on October 5, 1972 caused a 5-rem dose to a Point Beach employee. |
| | These three overexposures appear to have been caused by failure to appropriately control entry into high radiation areas, failure to conduct adequate surveys and failure to compensate for expo-sure rate variations that can occur in various areas in power reactors, e.g., the cavity beneath cle3 reactor vessel. With the incore thimbles and detectors inserted into the core, radiation levels in the cavity appear to be low. With the thimbles or detectors withdrawn into the cavity', however, exposure rates of hundreds or possibly thousands of roentgens per hour can exist. |
| | Overexposures can occur in seconds. |
| | All three overexposure events involved entry into potentially l |
| | high radiation areas without surveys and/or special controls over equipment which could cause transients in the exposure |
| | ! rate. |
| | l t |
| | Y g |
| | O yo / |
| | ~ |
| | 9bb |
| | |
| | ) |
| | ',_ tr bt . ' |
| | IE Circular No. 76 - 03 Date: September 13, 1976 ACTION TO BE TAKEN BY LICENSEES: |
| | While the three exposures above occurred at pressurized water reactors, similar situations could develop at other types of reactors, e.g., pneumatic irradiation equipment areas (research reactors) and traveling incore probe equipment areas (boiling water reactors). Accordingly, holders of power, test and research reactor operating licenses are to complete the following: |
| | : 1. Perform a thorough review of plant areas and operations to identify high radiation areas, both continuous and transient, as defined in 10 CFR 20.202(b). |
| | : 2. Verify that entryways into high radiation areas are con-spicuously posted and locked or otheruise controlled in such a manner as to explicitly identify the nature of the hazard, appropriately control entry, and require adequate pre-entry surveys, |
| | : 3. Ensure that radiation protection procedures and radiation protection training and retraining programs specifically address the matter of control of and access to such areas and initiate appropriate retraining of all plant personnel, |
| | : 4. Ensure rhat the procedures governing personnel entry into all actual or potential high radiation areas permit such entry only after appropriate management re- 'v and approval so that conditions within the area are known d not subject to change while the area is occupied, |
| | : 5. Periodically audit whatever controls result from item 1-4, above, to ensure their continued effectiveness, and |
| | : 6. Confirm by written reply within 60 days that the actions for items 1-4 above, have been or are being taken. A record, detailing findings, actions taken, and actions to be taken, should be retained for review by NRC during the next radiological safety inspection. |
| | This request for information was approved by GAO under a blanket clearance number B-180225 (R0072); this clearance expires July 31, 1977. |
| | k |
| | . . . . _ .-}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20080G1431995-01-24024 January 1995 Inquires About Reason for Puzzling Delay Concerning Patient Discharge Rule ML20080G1591995-01-10010 January 1995 Ack Receipt of ,Which Answered 941130 & 1212 Ltrs to Chairman.Informs That Ltr Entirely Unsatisfactory ML20057E2811993-09-17017 September 1993 Provides Correction to Second Paragraph of Page 1 of Final Rept of Confirmatory Survey of Boelter Reactor Facility for UCLA in Los Angeles,Ca ML20057C1001993-09-0909 September 1993 Forwards Final Rept of Confirmatory Survey of Boelter Reactor Facility,Univ of California,Los Angeles,Ca IR 05000142/19930011993-09-0303 September 1993 Forwards Orise Rept Also Being Identified as NRC Insp Rept 50-142/93-01.Areas Surveyed Appear to Meet Criteria of Reg Guide 1.86, Termination of OLs for Operating Reactors ML20057C5081993-08-24024 August 1993 Forwards Advance Copy of Final Rept of Confirmatory Survey of Boelter Reactor Facility,Univ of Ca. Bound Final Copies Will Be Mailed in Approx Two Wks ML20116L5461993-02-22022 February 1993 Forwards Response to Comments from NRC & Oak Ridge Inst Re Review of UCLA Rept, Final Decommissioning for Boelter Reactor Facility ML20128G2081993-01-28028 January 1993 Forwards Final Release Survey Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project ML20127K2731993-01-0404 January 1993 Forwards Final Decommissioning Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project ML20116E2951992-10-12012 October 1992 Provides Clarification of Two Items Noted in Insp Rept 50-142/92-01 & Informs of Personnel Change at UCLA ML20086J2451991-12-0404 December 1991 Discusses Changes in Organizational Structure at School of Engineering & Applied Sciences & Radiation Safety Ofc Since Issuance of NRC 890728 Order Authorizing Phase II Decommissioning.Revised Organization Chart Encl ML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20055J3881990-07-26026 July 1990 Advises That Author Retiring from Position of Radiation Safety Officer,Effective 900731 ML20248A3441989-09-20020 September 1989 Advises That Batch of Approx 5,000 Lb of Neutron Activated Lead Transferred on 890818 to Another Licensee for Possible Recycle Into Shielding for Waste Disposal.No Radioactive Matl Remaining at Univ & Licensee Complied W/Agreement ML20246F6201989-08-24024 August 1989 Forwards Commission Safety Evaluation & Environ Assessment & Finding of No Significant Impact for Phase II Decommissioning of UCLA Research Reactor,Per 890810 Request.W/O Encl ML20247Q6951989-07-28028 July 1989 Forwards Order Authorizing Phase II of Facility Dismantling & Disposition of Component Parts,Per 880610,21,1207 & 890331 Requests.Environ Assessment & Finding of No Significant Impact & Safety Evaluation Also Encl ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20245C5411989-04-12012 April 1989 Submits Followup to & Response to Ltrs from C Woodhead & D Hirsh Re EPA Regulatory Problems Concerning Transfer of Neutron Activated Lead Remaining at Reactor Facility to Univ License for Future Use as Shield Matl ML20248F7901989-03-31031 March 1989 Forwards Plan for Improvement of Procedures & Documentation for Final Reactor Facility Decommissioning,In Response to Insp Rept 50-142/89-10 ML20236C9381989-03-14014 March 1989 Forwards Request for Addl Info Re Decommissioning Phase II Plan Submitted on 880610 & Suppls on 880621 & 1207.Response Requested within 15 Days of Ltr Date ML20235Z1401989-03-0303 March 1989 Responds to Appeal of Denial of FOIA Request for Documents 36-61 on App C.Releases Documents C-38 - C-58,C-60 & C-61. Other App C Documents Withheld (Ref FOIA Exemption 5) ML20236A1481989-02-27027 February 1989 Forwards Insp Rept 50-142/89-01 on 890131-0201.No Noncompliance Noted ML20235V1671989-02-14014 February 1989 Informs That Proposal Re Transfer of 4,000 Lb of Radioactive Lead Shot & 1,000 Lb Lead Brick Does Not Conform to Settlement Agreement.Related Correspondence ML20195D6371988-10-27027 October 1988 Responds to Re Decomissioning Review of Reactor Facility ML20207M1931988-10-12012 October 1988 Forwards Request for Addl Info Re 880610 & 21 Phase II Decommissioning Plan.Response Requested within 60 Days of Ltr Date ML20154M8311988-09-20020 September 1988 Responds to Request for Info Re Phase I Nuclear Reactor Decommissioning.Concerns Raised Re Time Element for Review of Phase I Rept While Awaiting Approval Order for Removing Remaining Reactor Structures & Decommissioning Facility ML20207D1741988-07-18018 July 1988 Partial Response to FOIA Request for Documents.App G Documents Partially Withheld (Ref FOIA Exemption 4) ML20195E5741988-06-24024 June 1988 Ack Receipt of 780616 Response to 750529 Notice of Violation.Understands That Necessary Training of Police Officers Will Be Completed in Jul 1975 ML20195G6351988-06-21021 June 1988 Forwards Revised Pages for Phase II Plan for Former Reactor Facility.Some Editorial Corrections Made on Pages 6,12,15 & 16 ML20195G5041988-06-21021 June 1988 Forwards Pages 6,12,15 & 16 for Placement in Phase II Plan for Former Reactor Facility Sent on 880610.Editorial Changes Made to Pages ML20195E5531988-06-13013 June 1988 Partial Response to FOIA Request for Documents.App F Documents Encl & Available in PDR ML20155C6211988-06-10010 June 1988 Forwards Rept of UCLA Reactor Decommissioning,Guide for Phase Ii,Final Phase. Rept Covers Removal of Remaining Structures.Expeditious Review to Enable Distribution of Request for Proposal to Prospective Contractors Requested ML20155H4331988-06-0303 June 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents.App D & E Documents Available in PDR ML20154E5341988-05-13013 May 1988 Partial Response to FOIA Request.App C Documents Encl & Available in PDR ML20151S6331988-04-19019 April 1988 Forwards Amended Page of Attachment I to Je Mclaughlin to a Adams Correcting Typos ML20151G2601988-04-12012 April 1988 Forwards Responses to Questions 9-15 & Phase I of Summary Rept Dismantlement of Reactor,Per NRC .Phase II Plan Under Development ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20149M0501988-02-18018 February 1988 Ack Receipt of 880112 Answers to Remaining Questions Re Phase I of Decommissioning Effort & Request for Quotation Concerning Phase Ii.Plan to Dismantle Facility & Dispose of Component Parts Requested Per 10CFR50.82 ML20215C0501987-06-11011 June 1987 Informs of Recent Reorganization in Nrr.Organization Now Called Standardization & Non-Power Reactor Project Directorate.Project Manager for Facility Is a Adams ML20203M8871986-08-30030 August 1986 Informs of Change of Address ML20211Q2831986-07-14014 July 1986 Forwards Order Authorizing Phase I of Facility Dismantling & Disposition of Component Parts,Per 851029 Application. Finding of No Significant Environ Impact,Safety Evaluation & Environ Assessment Encl ML20210H9231986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20140D0901986-03-21021 March 1986 Forwards Answers to NRC Questions 1-8 Re Reactor Facility Dismantling Plan.Questions 9-15 Will Be Answered as Part of Rept Submitted at Conclusion of Phase I of Dismantling Operations ML20141P1521986-03-12012 March 1986 Forwards Request for Addl Info Re 851029 Reactor Decommissioning Plan.Response Requested by 860321 ML20136C5061985-12-16016 December 1985 Repts Organizational & Other Changes Made in Response to App 2 of ASLB Order ML20137Y8731985-12-0404 December 1985 Responds to 850925 Request for Amend to License R-71 Tech Specs.No Action Can Be Taken on Request.Aslb 851108 Order Terminated & Superseded License R-71 ML20210A4121985-11-13013 November 1985 Forwards Correction to ASLB Proposed Order Prepared in Response to 851030 Memorandum & Order on Behalf of Parties ML20210A4421985-11-0606 November 1985 Requests Signature on Encl Correction to Settlement Agreement ML20138M8861985-10-29029 October 1985 Forwards Decommissioning Plan:Phase I:Dismantlement & Radiological Assessment of UCLA Argonaut Reactor Facility. Final Step of Plan Includes Submission of Formal Plan for Achieving Ultimate Decommissioning of Facility ML20138L4091985-10-25025 October 1985 Forwards Draft Response to Board 851016 Order for Review,Per Request.Notification of Receipt Requested Prior to 851030. W/O Encl.Related Correspondence 1995-01-24
[Table view] Category:EDUCATIONAL INSTITUTION TO NRC
MONTHYEARML20055J3881990-07-26026 July 1990 Advises That Author Retiring from Position of Radiation Safety Officer,Effective 900731 ML20245C5411989-04-12012 April 1989 Submits Followup to & Response to Ltrs from C Woodhead & D Hirsh Re EPA Regulatory Problems Concerning Transfer of Neutron Activated Lead Remaining at Reactor Facility to Univ License for Future Use as Shield Matl ML20248F7901989-03-31031 March 1989 Forwards Plan for Improvement of Procedures & Documentation for Final Reactor Facility Decommissioning,In Response to Insp Rept 50-142/89-10 ML20154M8311988-09-20020 September 1988 Responds to Request for Info Re Phase I Nuclear Reactor Decommissioning.Concerns Raised Re Time Element for Review of Phase I Rept While Awaiting Approval Order for Removing Remaining Reactor Structures & Decommissioning Facility ML20195G5041988-06-21021 June 1988 Forwards Pages 6,12,15 & 16 for Placement in Phase II Plan for Former Reactor Facility Sent on 880610.Editorial Changes Made to Pages ML20195G6351988-06-21021 June 1988 Forwards Revised Pages for Phase II Plan for Former Reactor Facility.Some Editorial Corrections Made on Pages 6,12,15 & 16 ML20155C6211988-06-10010 June 1988 Forwards Rept of UCLA Reactor Decommissioning,Guide for Phase Ii,Final Phase. Rept Covers Removal of Remaining Structures.Expeditious Review to Enable Distribution of Request for Proposal to Prospective Contractors Requested ML20151S6331988-04-19019 April 1988 Forwards Amended Page of Attachment I to Je Mclaughlin to a Adams Correcting Typos ML20151G2601988-04-12012 April 1988 Forwards Responses to Questions 9-15 & Phase I of Summary Rept Dismantlement of Reactor,Per NRC .Phase II Plan Under Development ML20140D0901986-03-21021 March 1986 Forwards Answers to NRC Questions 1-8 Re Reactor Facility Dismantling Plan.Questions 9-15 Will Be Answered as Part of Rept Submitted at Conclusion of Phase I of Dismantling Operations ML20136C5061985-12-16016 December 1985 Repts Organizational & Other Changes Made in Response to App 2 of ASLB Order ML20210A4421985-11-0606 November 1985 Requests Signature on Encl Correction to Settlement Agreement ML20138M8861985-10-29029 October 1985 Forwards Decommissioning Plan:Phase I:Dismantlement & Radiological Assessment of UCLA Argonaut Reactor Facility. Final Step of Plan Includes Submission of Formal Plan for Achieving Ultimate Decommissioning of Facility ML20133G1461985-10-0808 October 1985 Advises That Dismantling & Decommissioning of Reactor Will Be Done in-house Rather than by Outside Contractor,Per Review on Informal Bids.Detailed Analysis of Radiological Status,Dismantling Plans & Organizational Charts Encl ML20133A3631985-09-25025 September 1985 Forwards Suppl to 850830 Application for Amend to License R-71,consisting of Proposed Amend 14 of Tech Specs, Eliminating All Authorization to Possess SNM & Need for Physical Security Plan Attendant ML20099H5901985-03-13013 March 1985 Advises That Development of Detailed Plans for Dismantling & Decommissioning Reactor Continuing.Excerpt from Third Generation Draft of Request for Proposal & Brief Synopsis of Present Status of Reactor Encl ML20107F9241985-02-15015 February 1985 Forwards Info Re Disassembly of Reactors as Followup to Author ,Per Request.Univ Will Not Submit Dismantlement Plan Until Contractor Proposal for Work Plan Reviewed ML20113D4001985-01-16016 January 1985 Advises That UCLA Has Returned All Reactor Fuel Described in License R-71 to DOE at Idaho Chemical Processing Plant ML20113E1311985-01-16016 January 1985 Informs That Disassembly of Reactor Core Necessary to Conduct Radiation Survey of Residual Radiation,In Anticipation of Reactor Decommissioning.Authorization to Conduct Intended Survey Assumed Unnecessary ML20113E3371985-01-16016 January 1985 Requests That All NRC-approved Security Plans & Amends Be Returned to Univ or Treated as Proprietary Info & Withheld from Public Disclosure to Restrict Dissemination of Hardware Info ML20112C8891985-01-0707 January 1985 Advises That Transfer of All Irradiated Fuel from UCLA Reactor to DOE Reprocessing Facility in Idaho Falls,Id Completed.Related Correspondence ML20099E3511984-11-13013 November 1984 Forwards Changes to Security Plan.Changes Withheld (Ref 10CFR2.790) ML20108A9451984-11-13013 November 1984 Forwards Univ Answer to Committee to Bridge the Gap 841024 Petition for Hearing & Leave to Intervene.Placement of Names of Univ Attys on Svc List Requested ML20094A0641984-10-31031 October 1984 Informs That Conditions for Withdrawal of License Renewal Application Unchanged.Use of Suitable Shipping Casks Secured & Arrangements Made to Ship Remaining Nuclear Fuel ML20098E9741984-09-26026 September 1984 Advises That WE Kastenberg Replaced I Catton as Director of Nuclear Energy Lab & Subsequently Appointed to Chair Radiation Use Committee,Effective 840920 ML20099A0581984-09-0707 September 1984 Forwards Correspondence Between Aftergood & G Turin Re Request for Meeting to Discuss Decommissioning.Related Correspondence ML20095F0061984-08-13013 August 1984 Forwards M Gonzalez-Cuesta Memo Re Assessment of Risk from Seismic Errors in Design & Const,Per 840810 Telcon ML20093L4381984-07-27027 July 1984 Forwards W Wegst to H Denton Requesting Amend to License R-71 & Tech Specs & 840726 Application to Terminate License Per 10CFR50.82 ML20090C7691984-07-11011 July 1984 Requests Opportunity to Reply to Committee to Bridge the Gap 840703 Response to Univ Request to Withdraw Application for License Renewal.Reply Will Be Served by 840720 ML20090C7631984-07-11011 July 1984 Forwards Response in Opposition to Committee to Bridge the Gap 840622 Emergency Petition.W/O Encl ML20207D2281984-07-10010 July 1984 Forwards 14 Partially Withheld Pages to Amend 7 to Physical Security Plan ML20092P7361984-07-0202 July 1984 Forwards Wf Wegst to HR Denton Requesting OL Be Amended to Possession Only License & Describing Action Taken to Render Reactor Inoperable.Related Correspondence ML20092N1621984-06-26026 June 1984 Forwards Correspondence Between State of CA Assemblyman G Davis & UCLA Executive Vice Chancellor Wd Schaefer Re UCLA Plans for Reactor Security During Olympic Games.Related Correspondence ML20197H3421984-06-14014 June 1984 Notifies of Decision to Withdraw Application for Renewal of License & of Intention to Decommission Reactor.Potential Expense of Reactor Operation Unjustified in Light of Decline in Importance to Academic Programs.Related Correspondence ML20092G9761984-06-14014 June 1984 Informs of Decision to Withdraw Application for Renewal of License R-71 & of Plans to Decommission Reactor ML20092G9581984-06-14014 June 1984 Forwards CE Young to Commissioner Palladino Re Withdrawal of Application for Renewal of License R-71. Application for Termination of License Will Be Submitted ML20197G6621984-06-11011 June 1984 Forwards Transcript of B Ramberg 840607 Deposition.W/O Encl.Related Correspondence ML20091A8711984-05-24024 May 1984 Forwards Prof Qualifications of GL Hofman,Testifying in Response to Committee to Bridge the Gap Hearsay Objection to Answer 8 of UCLA Rebuttal.Related Correspondence ML20084F1831984-05-0101 May 1984 Forwards Declaration in Response to ASLB 840413 Memorandum & Order.App a to Declaration Contains Protected Info & Is Being Served Per ASLB Protective Order Requirements ML20088A7051984-04-0606 April 1984 Forwards Suppl to Rebuttal on Credibility of Graphite Fire at Facility & Suppl to Rebuttal on Credibility of Cbg Fission Product Release Model,Per ASLB 840322 Order ML20087N6311984-03-30030 March 1984 Informs That Schedule for Required Maint & Restart of Reactor Not Established & Will Not Be Considered Until at Least After Conclusion of Summer Olympic Games ML20087K9691984-03-20020 March 1984 Responds to 840315 Inquiry Re Info Reported in 840310 Washington Post Article.Reactor Will Remain Shut Down Until After Olympic Games.Barricades & Armed Guards Planned. Related Correspondence ML20079P7921984-01-25025 January 1984 Forwards Proposed List of Authorized Persons Who Need Access to Protected Info,In Response to ASLB 840118 Memorandum & Order.Addition of Paragraph Clarifying Exemption Clause of Protective Order Requested ML20083J2071984-01-10010 January 1984 Forwards Affidavit of Nc Ostrander in Support of Univ 830909 Response to Citizens to Bridge the Gap Comments on Fuel Inventory,Per ASLB 831223 Order ML20079R2511984-01-10010 January 1984 Responds to NRC Re Violations Noted in IE Insp Rept 50-142/83-04.Corrective Actions:Emergency Drill Conducted on 831220 ML20083A5711983-12-13013 December 1983 Informs That Criticism Stated in J Davidson Resulting from Newspaper Article in Daily Bruin Incorrectly Inferred.Testimony Not Understood by ASLB Because of Univ Failure to Respond Comprehensibly to Specific Questions ML20082R6851983-12-0707 December 1983 Forwards Neutron Transport Calculations Supporting Proposed Renewal of License,In Response to Committee to Bridge the Gap 831118 Request.Related Correspondence ML20082M3091983-12-0202 December 1983 Forwards Requested Supplementation of Shutdown Mechanism Testimony.Encl Rewritten to Simplify Unduly Complicated Matters ML20082B4821983-11-17017 November 1983 Forwards Corrected 831107 Rebuttal Testimony Re Shutdown Mechanism ML20081M3041983-11-0707 November 1983 Forwards Rebuttal Testimony Re Reactor Shutdown Mechanism & of Credibility of Graphite Fire & of Committee to Bridge the Gap (Cbg) Fission Product Release Model & Rebuttal to Cbg Panel I Rebuttal & to Cbg Energy & Dispersion Testimony 1990-07-26
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20080G1431995-01-24024 January 1995 Inquires About Reason for Puzzling Delay Concerning Patient Discharge Rule ML20080G1591995-01-10010 January 1995 Ack Receipt of ,Which Answered 941130 & 1212 Ltrs to Chairman.Informs That Ltr Entirely Unsatisfactory ML20057E2811993-09-17017 September 1993 Provides Correction to Second Paragraph of Page 1 of Final Rept of Confirmatory Survey of Boelter Reactor Facility for UCLA in Los Angeles,Ca ML20057C1001993-09-0909 September 1993 Forwards Final Rept of Confirmatory Survey of Boelter Reactor Facility,Univ of California,Los Angeles,Ca ML20057C5081993-08-24024 August 1993 Forwards Advance Copy of Final Rept of Confirmatory Survey of Boelter Reactor Facility,Univ of Ca. Bound Final Copies Will Be Mailed in Approx Two Wks ML20116L5461993-02-22022 February 1993 Forwards Response to Comments from NRC & Oak Ridge Inst Re Review of UCLA Rept, Final Decommissioning for Boelter Reactor Facility ML20128G2081993-01-28028 January 1993 Forwards Final Release Survey Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project ML20127K2731993-01-0404 January 1993 Forwards Final Decommissioning Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project ML20116E2951992-10-12012 October 1992 Provides Clarification of Two Items Noted in Insp Rept 50-142/92-01 & Informs of Personnel Change at UCLA ML20086J2451991-12-0404 December 1991 Discusses Changes in Organizational Structure at School of Engineering & Applied Sciences & Radiation Safety Ofc Since Issuance of NRC 890728 Order Authorizing Phase II Decommissioning.Revised Organization Chart Encl ML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20055J3881990-07-26026 July 1990 Advises That Author Retiring from Position of Radiation Safety Officer,Effective 900731 ML20248A3441989-09-20020 September 1989 Advises That Batch of Approx 5,000 Lb of Neutron Activated Lead Transferred on 890818 to Another Licensee for Possible Recycle Into Shielding for Waste Disposal.No Radioactive Matl Remaining at Univ & Licensee Complied W/Agreement ML20245C5411989-04-12012 April 1989 Submits Followup to & Response to Ltrs from C Woodhead & D Hirsh Re EPA Regulatory Problems Concerning Transfer of Neutron Activated Lead Remaining at Reactor Facility to Univ License for Future Use as Shield Matl ML20248F7901989-03-31031 March 1989 Forwards Plan for Improvement of Procedures & Documentation for Final Reactor Facility Decommissioning,In Response to Insp Rept 50-142/89-10 ML20154M8311988-09-20020 September 1988 Responds to Request for Info Re Phase I Nuclear Reactor Decommissioning.Concerns Raised Re Time Element for Review of Phase I Rept While Awaiting Approval Order for Removing Remaining Reactor Structures & Decommissioning Facility ML20195G5041988-06-21021 June 1988 Forwards Pages 6,12,15 & 16 for Placement in Phase II Plan for Former Reactor Facility Sent on 880610.Editorial Changes Made to Pages ML20195G6351988-06-21021 June 1988 Forwards Revised Pages for Phase II Plan for Former Reactor Facility.Some Editorial Corrections Made on Pages 6,12,15 & 16 ML20155C6211988-06-10010 June 1988 Forwards Rept of UCLA Reactor Decommissioning,Guide for Phase Ii,Final Phase. Rept Covers Removal of Remaining Structures.Expeditious Review to Enable Distribution of Request for Proposal to Prospective Contractors Requested ML20151S6331988-04-19019 April 1988 Forwards Amended Page of Attachment I to Je Mclaughlin to a Adams Correcting Typos ML20151G2601988-04-12012 April 1988 Forwards Responses to Questions 9-15 & Phase I of Summary Rept Dismantlement of Reactor,Per NRC .Phase II Plan Under Development ML20203M8871986-08-30030 August 1986 Informs of Change of Address ML20140D0901986-03-21021 March 1986 Forwards Answers to NRC Questions 1-8 Re Reactor Facility Dismantling Plan.Questions 9-15 Will Be Answered as Part of Rept Submitted at Conclusion of Phase I of Dismantling Operations ML20136C5061985-12-16016 December 1985 Repts Organizational & Other Changes Made in Response to App 2 of ASLB Order ML20210A4421985-11-0606 November 1985 Requests Signature on Encl Correction to Settlement Agreement ML20138M8861985-10-29029 October 1985 Forwards Decommissioning Plan:Phase I:Dismantlement & Radiological Assessment of UCLA Argonaut Reactor Facility. Final Step of Plan Includes Submission of Formal Plan for Achieving Ultimate Decommissioning of Facility ML20133G1461985-10-0808 October 1985 Advises That Dismantling & Decommissioning of Reactor Will Be Done in-house Rather than by Outside Contractor,Per Review on Informal Bids.Detailed Analysis of Radiological Status,Dismantling Plans & Organizational Charts Encl ML20133A3631985-09-25025 September 1985 Forwards Suppl to 850830 Application for Amend to License R-71,consisting of Proposed Amend 14 of Tech Specs, Eliminating All Authorization to Possess SNM & Need for Physical Security Plan Attendant ML20127A0521985-07-29029 July 1985 Submits Current Committee to Bridge the Gap Svc List,Per Proposed License Renewal & Request for Orders Authorizing Dismantlement.Related Correspondence ML20133H6641985-07-29029 July 1985 Forwards Current Svc List for Committee to Bridge the Gap Re staff-generated Correspondence & Documents Concerning Facility ML20117M2551985-05-13013 May 1985 Advises That Negotiations Among Parties Not Complete.Target Date for Completion of Written Stipulation Postponed to 850715 by Oral Agreement of Parties.Related Correspondence ML20134D5881985-05-0808 May 1985 FOIA Request for Documents Re NRC Proposed Decommissioning Rule & Implementation of Rule to Decommissioned Reactors ML20237H6471985-03-21021 March 1985 FOIA Request for 11 Categories of Documents Re Safeguards & Security at UCLA Reactor Facility & SNM Formerly Possessed Under License R-71 ML20099H5901985-03-13013 March 1985 Advises That Development of Detailed Plans for Dismantling & Decommissioning Reactor Continuing.Excerpt from Third Generation Draft of Request for Proposal & Brief Synopsis of Present Status of Reactor Encl ML20107F9241985-02-15015 February 1985 Forwards Info Re Disassembly of Reactors as Followup to Author ,Per Request.Univ Will Not Submit Dismantlement Plan Until Contractor Proposal for Work Plan Reviewed ML20113E3371985-01-16016 January 1985 Requests That All NRC-approved Security Plans & Amends Be Returned to Univ or Treated as Proprietary Info & Withheld from Public Disclosure to Restrict Dissemination of Hardware Info ML20113E1311985-01-16016 January 1985 Informs That Disassembly of Reactor Core Necessary to Conduct Radiation Survey of Residual Radiation,In Anticipation of Reactor Decommissioning.Authorization to Conduct Intended Survey Assumed Unnecessary ML20113D4001985-01-16016 January 1985 Advises That UCLA Has Returned All Reactor Fuel Described in License R-71 to DOE at Idaho Chemical Processing Plant ML20112C8891985-01-0707 January 1985 Advises That Transfer of All Irradiated Fuel from UCLA Reactor to DOE Reprocessing Facility in Idaho Falls,Id Completed.Related Correspondence ML20100G6171984-11-18018 November 1984 Informs of Recent Communications W/Doe Re Shipment of UCLA Reactor Fuel to Idaho Falls,Id.Jb Whitsett to Aftergood & to Nc Ostrander Encl.Related Correspondence ML20108A9451984-11-13013 November 1984 Forwards Univ Answer to Committee to Bridge the Gap 841024 Petition for Hearing & Leave to Intervene.Placement of Names of Univ Attys on Svc List Requested ML20099E3511984-11-13013 November 1984 Forwards Changes to Security Plan.Changes Withheld (Ref 10CFR2.790) ML20094A0641984-10-31031 October 1984 Informs That Conditions for Withdrawal of License Renewal Application Unchanged.Use of Suitable Shipping Casks Secured & Arrangements Made to Ship Remaining Nuclear Fuel ML20098E9741984-09-26026 September 1984 Advises That WE Kastenberg Replaced I Catton as Director of Nuclear Energy Lab & Subsequently Appointed to Chair Radiation Use Committee,Effective 840920 ML20107M0101984-09-20020 September 1984 FOIA Request for Correspondence Between UCLA & NRC Re Research Reactor Decommissioning.Documents Not Served on Parties in Reactor Relicensing Proceeding in Previous 6 Months Required ML20097A5661984-09-0707 September 1984 Requests That D Thompson Be Replaced W/Rl Kohn on Svc List. D Thompson Will Be Out of Ofc Temporarily for Extended Period Beginning on or About 840910 ML20099A0581984-09-0707 September 1984 Forwards Correspondence Between Aftergood & G Turin Re Request for Meeting to Discuss Decommissioning.Related Correspondence ML20096D7441984-08-29029 August 1984 Forwards D Hirsch on UCLA Application for License Amend & Order Re Facility Dismantlement ML20096D7471984-08-25025 August 1984 Discusses UCLA 840614 Application to Withdraw Renewal Application & Order Re Facility Dismantlement.Committee to Bridge the Gap Insists on Rights to Participate in Proceeding If Dismantlement Issue Deferred ML20096A6591984-08-25025 August 1984 Requests Prompt Notification When Petitions for Leave to Intervene & for Hearing May Be Formally Filed on Proposed Parallel License Amends & Related 10CFR50.82 Dismantlement/ License Termination Application 1995-01-24
[Table view] |
Text
N p, ,
[O _ ;Q UNIVERSITY OF CALIFORNp3LOS ANGELES jf SIJLKELEY
- SAN FRANCISCO SANTA BARBARA
- SANT CRUZ SCHOOL OF ENCINEERING AND APPLIED SCIENCE
.A . N
. ' f
,' ,j',[ q.,
(X
. '*.} #
Karl R. Goller .
' [O t,,'"d )']d a f Assistant Director of Operating Reactors 'i .
l Division of Reactor Licensing T 3 . .
"'e q, * '
U.S. Nuclear Regulatory Commission .
Washington, D.C. 20555 .'^~
um o
' -d '
Dear Mr. Coller:
Due to the sensitive nature of the contents of this letter, we request that this document be withheld from public disclosure pursuant to section 2.790 of 10 CFR Part 2.
We have at this facility a full core loading of new fuel, fuel plate scrap, and uranyl nitrate solution, all at an enrichment of 93*..
Uc also have on hand two 32 gram Pu-239-Be neutron sources. This gives us a non-exempt SNM inventory. of Icss 'than 5 kg. ,
We request that we be allowed to retain this inventory for the following reasons:
- a. To be abic to perform low power experiments along with computer code work, whereby irradiated fuel is temporarily replaced by ncn irradiated fuel. This would greatly reduce experimental error and personnel exposure,
- b. To have on hand .'cw fuel to replace damaged fuel elements.
- c. To have inherent flexibility because we are a university facility. Projects and experiments come up often with very littic 1 cad time. If we do not possess the proper material, it is more than likely that we may have extreme difficulty acquiring it and a finite possibility of not obtaining it.
We therefore request permission to have on hand our existing SNM inventory. We have provided adequate protection according to NRC and have followed the advice of Doug Schuster of Region V to the letter.
We are also within the limits set forth by 10 CFR.
Sincerely yours,
$[N Charles E. Ashbaugh III Reactor Supervisor 8210290051 820930 004 002-PDR FOIA HIRSCH82-381 PDR NUCLE AR ENERGY LADORATORY TItOMAS E. It!CKS. Professor and Director
.. .w....an.... v...........
N 4
4,*Th'7,'f((,$.
?
WASHit4GTCN. D. C' 20555 e- . 31.g,y: m. f a
$, .cf / t January 29, 197d R. Purple, Chief, Operating Reactors Branch '1, D0k D. Ziemann, Chief, Operating Reactors Branch #2, DOR .
,G. Lear, Chief, Operating Reactors Branch #3, DOR- -
R. Reid, Chief, Operating Reactors Branch :f 1, DOR WITIDIOLDING OF SPECIAL NUCLEAR !L\TERIAL (SNM) INVENTORY INFORMATION FOR NON-POWER REACTOR FACILITIES ,
- Although license authorization limits for SNM at non-power reactors are not . considered sensitive and c:ay be mentioned freely in any correspondence, the specific types, enrichments and amounts of SNM actually held on-hand by non-power reactor licensees should be
" withheld from public disclosure". The amount .of-uranium - 235 (contained in uranium enriched to 20 percent or more'in the uranium - 235 isotope), uranius - 233, or plutoniun held by the licensee as unirradiated fuel is particularly sensitive intormation. ,
Therefore, in your preparation of safety evaluations or other documents for license amendments to reduce the authori:ation limit of SNM for non-power reactor licensecs, no reference should be made to the actual o,uantity of SN'! that a particular facility has on .
hand. The current and projected authori:ation limits in the license l-e may,bc disclosed. *
/ ~&
I -
Karl R. Coller, Assistant Director
. . . for Operating Reactors
. Division of Operating Reactors
! l .
-l .
t l _
r i
i i
s
! t i
l l . :. .. . s. . , ._-
l .
j:~pj G F g ) - ) ?/
\ A, -
NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 IE Circular No. 76 - 03 DATE: September 13, 1976 RADIATION EXPOSURES IN REACTOR CAVITIES DESCRIPTION OF CIRCUMSTANCES:
On March 18, 1976, an employee at the Zion station received a "whole body" radiation dose of 8 rems or more upon entering the cavity beneath the reactor vessel during a refueling out-age. On April 5, 1976, a similar reactor cavity entry at Indian Point resulted in a 10-rem whole body dose to a licen-see employee. A similar entry on October 5, 1972 caused a 5-rem dose to a Point Beach employee.
These three overexposures appear to have been caused by failure to appropriately control entry into high radiation areas, failure to conduct adequate surveys and failure to compensate for expo-sure rate variations that can occur in various areas in power reactors, e.g., the cavity beneath cle3 reactor vessel. With the incore thimbles and detectors inserted into the core, radiation levels in the cavity appear to be low. With the thimbles or detectors withdrawn into the cavity', however, exposure rates of hundreds or possibly thousands of roentgens per hour can exist.
Overexposures can occur in seconds.
All three overexposure events involved entry into potentially l
high radiation areas without surveys and/or special controls over equipment which could cause transients in the exposure
! rate.
l t
Y g
O yo /
~
9bb
)
',_ tr bt . '
IE Circular No. 76 - 03 Date: September 13, 1976 ACTION TO BE TAKEN BY LICENSEES:
While the three exposures above occurred at pressurized water reactors, similar situations could develop at other types of reactors, e.g., pneumatic irradiation equipment areas (research reactors) and traveling incore probe equipment areas (boiling water reactors). Accordingly, holders of power, test and research reactor operating licenses are to complete the following:
- 1. Perform a thorough review of plant areas and operations to identify high radiation areas, both continuous and transient, as defined in 10 CFR 20.202(b).
- 2. Verify that entryways into high radiation areas are con-spicuously posted and locked or otheruise controlled in such a manner as to explicitly identify the nature of the hazard, appropriately control entry, and require adequate pre-entry surveys,
- 3. Ensure that radiation protection procedures and radiation protection training and retraining programs specifically address the matter of control of and access to such areas and initiate appropriate retraining of all plant personnel,
- 4. Ensure rhat the procedures governing personnel entry into all actual or potential high radiation areas permit such entry only after appropriate management re- 'v and approval so that conditions within the area are known d not subject to change while the area is occupied,
- 5. Periodically audit whatever controls result from item 1-4, above, to ensure their continued effectiveness, and
- 6. Confirm by written reply within 60 days that the actions for items 1-4 above, have been or are being taken. A record, detailing findings, actions taken, and actions to be taken, should be retained for review by NRC during the next radiological safety inspection.
This request for information was approved by GAO under a blanket clearance number B-180225 (R0072); this clearance expires July 31, 1977.
k
. . . . _ .-