|
|
Line 148: |
Line 148: |
| ==SUMMARY== | | ==SUMMARY== |
| OF OPERATING E.3PERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date October 5, 1989 Completed By C. W. Krause Telephone 414/221-2001 Unit 2 operated at approximately 497 MWe net until September 8, i 1989 when the unit went into the end-of-life stretch operation. | | OF OPERATING E.3PERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date October 5, 1989 Completed By C. W. Krause Telephone 414/221-2001 Unit 2 operated at approximately 497 MWe net until September 8, i 1989 when the unit went into the end-of-life stretch operation. |
| ;
| |
| Power level decreased slightly from that point until September 23, 1989, where the unit was taken off line for its annual refueling and maintenance outage. | | Power level decreased slightly from that point until September 23, 1989, where the unit was taken off line for its annual refueling and maintenance outage. |
| i Major outage work includes replacing approximately 16 blades in the No. 2 low pressure turbine, replacing the axle and bearings in the turbine building crane, performing the 10-year reactor > | | i Major outage work includes replacing approximately 16 blades in the No. 2 low pressure turbine, replacing the axle and bearings in the turbine building crane, performing the 10-year reactor > |
Line 155: |
Line 154: |
| The station battery, D06, is also scheduled to be replaced this outage. | | The station battery, D06, is also scheduled to be replaced this outage. |
| The containment integrated leak rate test was successfully completed. Steam generator work includes eddy current, sleeving, plug repair, and sludge lancing. | | The containment integrated leak rate test was successfully completed. Steam generator work includes eddy current, sleeving, plug repair, and sludge lancing. |
| ;
| |
| l i | | l i |
| t}} | | t}} |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
T a,-
(#
- O W PontR coMPANr 231 W. MICHIGAN.P.O BOX 2046. MILWAUKEE,Wi$3201 (414)221 2345 VPNPD-89-529 NRC-89-123 October 9, 1989 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D. C. 20555 Gentlement DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS y-POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 '
Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of September 1989.
- - Very truly yours, l
~
L C. . Fay l Vice President Nuclear Power Attachments Copies to R. S. Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector
[t:7T 8910180006 890930 PDR R' ADOCK 05000266 PDC
~~~
.-]
OPERATING DATA REPORT DOCKET NO. 50-266 DATE October 5, 1989 COMPLETED BY C. W. KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .
- 2. REPORTING PERIOD: SEPTEMBER 1989 . .
- 3. LICENSED THERMAL POWER (MWT): 1518. . .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 6,551 165,695
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,519.3 136,134.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.T
- 14. HOURS GENERATOR ON LINE 720.0 5,497.8 133,330.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 951,439 7,827,128 185,169,952
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 314,880 2,647,700 62,476,750
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 299,782 2,526,862 59,511,330
- 19. UNIT SERVICE FACTOR 100.0 83.9 80.5
- 20. UNIT AVAILABILITY FACTOR 100.0 83.9 81.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 85.8 79.5 73.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 83.8 77.6 72.3
- 23. UNIT FORCED OUTAGE RATE O.0 0.0 1.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, E.*TIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FAC'iORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
. El DOCKET NOo 50-266 .
UNIT NAME Point Beach, Unit 1 DATE October 4, 1989 ~
COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH SEPTEMBER 1989 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 489 11 421 21 495 2 254 12 491 22 495 3 225 13 489 23 231 4 228 14 489 24 213 5 452 15 489 25 449 6 494 16 484 26 495 7 497 17 470 27 496 8 495 18 492 28 496 9 232 19 494 29 496 10 204 20 495 30 242 EQR-28a (04-86)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266- .
i UNIT NAME Foint Beach Unit 1-DATE October 5, 1989 REPORT MONTH SEPTEMBER 1989 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 c
s #
o Ca es 4-1 Q es d om C o 54 .
~
. t$
eo 2
e co ES P. 8 ".
a.TJ No. Date g -4 o Licensee Event 40 Cause & Corrective Action E.4 $3 $ '3$$ Report No. $O $0 To Prevent Recurrence a gym m o m
6 890902 S O F 5 Not applicable ZZ ZZ4 m Load reduced to low electrical demand and nuclear fuel conservation.
7 890909 S O F 5 Not applicable ZZ ZZZZZZ Load reduced to low electrical demand and nuclear fuel conservation.
8 890923 S O F 5 Not applicable ZZ ZZZZZZ Load reduced to low electrical demand and nuclear fuel conservation.
9 890930 S O F 5 Not applicable ZZ ZZZZZZ Load reduced to low electrical demand and nuclear fuel conservation.
1F: Forced 2 Reason: 3 Method: 4 Exhibit F-Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Mancal Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load SExhibit H-Same Source F - Administrative 6 - Other (explain) 4 G - Operational Error (explain)
H - Other (explain)
EQR-28B (04-87)
F s
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE t Docket No. 50-266 :
Unit Name Point Beach Unit 1 Date October 5, 1989
! '. Completed By C. W. Krause Telephone 414/221-2001 ;
Unit 1 operated at approximately 494 MWe net throughout the .
report period with the exception of four significant load t-reductions. The load reductions were the result of low '
system demand in conjunction with nuclear fuel Conservation.
's> -
- , %, x .. .
yT; . 3
- % i o, - $$
OPERATING DATA REPORT '
.f DOCKET NO. 50-301
.=
DATE ' October 5,:1989 COMPLETED BY. C. W. KRAUSE TELEPHONE 414.221 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
- 2. REPORTING PERIODt SEPTEMBER 1989, . .
- 3. LICENSED THERMAL POWER (MWT): 1518. . .
'4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497. :. .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . . . w ...;
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SIMCE LAST REPORT, GIVE REASONE:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY'(NET MWE):- NOT APPLICABLE
- 10. REASONS FOR. RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 6,551 150,480
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 535.0 6,331.6 132,433.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.6 216.7
- 14. HOURS GENERATOR ON LINE 530.0 6,232.7 130,329.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 4.8 3G2.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 776,156 9,372,685 185,318,519
- 17. GROSS ELECTRICAL ENERGY GENERATED-(MWH) 265,520 3,216,010 62.889,710
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 252,200 3,C70,816 59,925,238
- 19. UNIT SERVICE FACTOR 73.6 95.1 86.6
- 20. UNIT AVAILABILITY FACTOR 73.6 95.2 86.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 72.2 96.7 81.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 70.6 94.3 80.1-
- 23. UNIT FORCED OUTAGE RATE O.0 2.0 1.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
FONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:. November 10, 1989 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 .;
.a
~ _ . _ - _ . - , - - . ,. .
5 DOCKET NO. 50-301 .
UNIT NAME Point Beach, Unit- 2 DATE October 5, 1989
' COMPLETED BY C.-W. Kraure TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH SEPTEMBER 1989 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 496 11 478 21 461 2 494 12 480 22 423 3 493 13 475 23 -12 4 498 14 473 24 -16 5 502 15 470 25 -10 6 499 16 468 26 -2 7 500 17 467 27 -2 8 498 18 466 28 0 9 492 19 465 29 -2 10 493 20 464 30 -2 EQR-28a (04-86)
a UNIT SHUTDOWNS AND POWER REDUCTIONS- DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE October 8, 1989 REPORT MONTH SEPTEMBER 1989 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 1 c
o o ca a u no c om c o 4 e
- -4 u o tr o E, cc-e av a oca ee oo . .
No. Date g eo e o -4 o Licensee Event ue o,-J Cause & Corrective Action g $3 $ $0, Report No. EO @O To Prevent Recurrence o e o a: m o E .c m
4 890923 5 190 C 1 Not Applicable ZZ ZZZZZZ Commence annual refueling and maintenance outage.
1F: Forced 2 Reason: 3 Method: 4 Exhibit F-Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-Ol61)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load SExhibit H-Same Source F - Administrative 6 - Other (explain)
G - Operational Error (explain)
H -_Other (explain)
EQR-28B (00-87)
..~~
NARRATIVE
SUMMARY
OF OPERATING E.3PERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date October 5, 1989 Completed By C. W. Krause Telephone 414/221-2001 Unit 2 operated at approximately 497 MWe net until September 8, i 1989 when the unit went into the end-of-life stretch operation.
Power level decreased slightly from that point until September 23, 1989, where the unit was taken off line for its annual refueling and maintenance outage.
i Major outage work includes replacing approximately 16 blades in the No. 2 low pressure turbine, replacing the axle and bearings in the turbine building crane, performing the 10-year reactor >
vessel inspection, and hydro testing the reactor coolant system, ,
safety injection system, and residual heat removal system.
The station battery, D06, is also scheduled to be replaced this outage.
The containment integrated leak rate test was successfully completed. Steam generator work includes eddy current, sleeving, plug repair, and sludge lancing.
l i
t