Line 67: Line 67:
also. While the pump motor is offsite .the pump vill be removed and inspected for
also. While the pump motor is offsite .the pump vill be removed and inspected for
.                  any abnormal problems.
.                  any abnormal problems.
A detailed investigation of 'the fire protection system, including pump ~ failure, is-to be completed and results submitted by December 31, 1980. The results of
A detailed investigation of 'the fire protection system, including pump ~ failure, is-to be completed and results submitted by December 31, 1980. The results of this fire protection study will be formalized by February 1, 1980.                                      ,
;
this fire protection study will be formalized by February 1, 1980.                                      ,
i 4
i 4
?
?

Latest revision as of 08:16, 18 February 2020

Updated LER 80-069/01T-1:on 800920,motor-driven Fire Pump Motor Failed After Rebuild.Cause Being Investigated.Motor Sent Offsite to Be Rebuilt Again
ML19343A932
Person / Time
Site: Beaver Valley
Issue date: 11/14/1980
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19343A931 List:
References
LER-80-069-01T, LER-80-69-1T, NUDOCS 8011240301
Download: ML19343A932 (2)


Text

___

D inacposeeses-U. 3. NUCLEAR recut.ATORY CC8metWON r7Tn Update Raport - Previous Report Dated 10/3/80 LICENSEu EVENT REPORT CcNTwot StoCxy l I l l l I 1 irtE4sa rn:NT oR Type ALL REOuiREO INFORheATIONI i e@

lo } s8 l9 l P IWCEN844CQOg A l 5 lV I S 11 l@l 010 l- 1010 l0 l010 l- 1010 l e 4 11uCENSE 11 11Tvre1140l@ls16AT l l 68 @

'1 to IS uCENstNuMetm is CCN'T lolil yy*,"c} lL @ l0l 5 l0 10 10 13 I3 14 @ l0 19 l2 101 81 0l@ 14 l 11 11MEPQRT 75 11 48 QAT1 SI Ol @ $Q 7 4 60 61 OOCK ET NuMOSM e4 W (V EN T QATE EVENT oEsCMIPTION AND PRC8ASLE CONSEQUENCES h t o 121 l The motor-driven fire pump motor failed after being rebuilt a second time. This I f7TTTI report is for information purposes only. A temporarv fire pump is still available I l o 141 l along with the installed engine-driven fire oumo. I l

lo isi i I

io is i l I

lo irl i .

I 1010 l l "

7 . .

st,8 COD'E su OE OE coot su E 00MPONENT CoOE iois]

7 .

IA lB l h l El @ ulX l h lM

. io i, o l0 IT l0 lR IX l h I Zl h lZ l h

i. i. .,

SEQUENT!*4 CCOUAAENCE mtPCRT MEvisioN (VENTYEAM REPCRTNO. CCCE TYet No.

(gnfgo O'7 ,,'g 18lol I-- I I 01 61 91 1/1 1 01 i l i Tl I - --.1 Ill 2, n n 2 a 2r a a u 1. n oP r MT  % Rs sus i 8 CPM S. E MA uf FER RN oN l2l@ lZl9l9I9l@

i L,L @saW @

u I.sZ l@

I.e Zlh 10 10 10 lo l 21 ao W@

as Ia2N l@ ss a ,,

CAUSE CESCRIPTICN AND CORRECTIVE ACTIONS 27 li;o1 l The cause for this failure is being investigated further. The motor has been sent ]

li ;i l I off-site to be rebuilt again and the pump will be removed for further investiestiont ,

gl A follow-up report will be submitted when this problem is completely solved. I l' ill I l

lii41 1 80 7 4 3 YAN  %#cW8R CTwemsTATus i NRY casc0VERv otscmiPTioN Operator observation h l Ii Is l l Hl@ l 0 l 010l@l Design l

lBl@las as ao 7

8 , b ,,, J T,y, '2 i

}1 l6l=si.

o aucuNT g N/A $/gcationac ivetv l hl tcCATioN es ansAst h N/A I Asto@on ' '

astaAsa l " " "

nasoNNs$. execsi Es Nuueen Tvn ossCaieTicN@

l? i7ll0l010j@lZl@l N/A l

nasoNNe'd,NJiss Nuusen oescnietioNh N/A I li 141 7 4 9 l 0 l 0 l 0 l@l>2 11 80 LCss QF 08 OAMAGE TO EACluTY O me cesemietioN C/

l'lil 4W9 @l

  • 0 -

N/A 30 I

.ggyg 1 : l e l I N f@OE l CMiPTioNN/A l 1I IIIIIIII IIli r a a ia sa ss n.:

  • DAME Op enEP AAER w* S* t*#c"V PwCNE.

8011240$ng

q i

Attachment To LZR 80-69/0lT Beaver Valley Power Station Duquesne Light Company Docket No. 50-334 4

This report is to serve as a follow-up information-source on the status of the.BVPS Unit 1 Motor-Driven Fire Pump [FP-P-1]. Presently, the pump motor is being rebuilt by Westinghouse and is being checked for any oil seal or aligmzent and binding problems. Une chronology of Motor-Driven Fire Pump [FP-P-1] problems is explained in the following.

On February 26, 1980, we submitted a Special Report to you which advised you that the [FP-P-1] pump upper motor bearing was very hot to touch and it was found smoking after an extended run.

From February 26, 1980 through September, 1980, the [FP-P-1] motor parts were ordered and the mater. bearings were replaced onsite.

On September 20, 1980, we submitted LER 80-069/01T to report that the [FP-P-1]

upper motor bearing had burned up after being rebuilt onsite. Debris was found in the cooling water strainer, so the pump was not inspected at this time. The motor was sent to Westinghouse to be rebuilt.

On November 1,1980, .the motor was returned from Westinghouse and was re-installed and subsequently burned up again. At this time, Westinghouse was contracted to ,

i rebuilt the motor again. Westinghouse was instructed to check.for a bent rotor 1

also. While the pump motor is offsite .the pump vill be removed and inspected for

. any abnormal problems.

A detailed investigation of 'the fire protection system, including pump ~ failure, is-to be completed and results submitted by December 31, 1980. The results of this fire protection study will be formalized by February 1, 1980. ,

i 4

?

t I

. V

, - - - - . , . , - - - . . - . . . . . . - , , -- , - - - . . - .- .-. .,-