ML19254D923: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
{{#Wiki_filter:Alabama Power Company
{{#Wiki_filter:Alabama Power Company
     * -
     * -
* 600 North 18th Street Post Office Box 2641 Dirmingham. Alabama 35291 Telephwie 205 323-5341 L  k Eboi'v^c'e'#,h@nt                                                      AlabamaPower the smn elettnc systern
* 600 North 18th Street Post Office Box 2641 Dirmingham. Alabama 35291 Telephwie 205 323-5341 L  k Eboi'v^c'e'#,h@nt                                                      AlabamaPower the smn elettnc systern October 23, 1979 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Mr. A. Schwencer
                                                                    .
October 23, 1979 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Mr. A. Schwencer
-


==Dear Mr. Schwencer:==
==Dear Mr. Schwencer:==
Line 37: Line 34:
If you have any questions, please advise.
If you have any questions, please advise.
Yours very truly,
Yours very truly,
                                                                                      ,
                                                                         &    l$ tL -
                                                                         &    l$ tL -
                                                             'F)L.Clayton,Jr.        i V
                                                             'F)L.Clayton,Jr.        i V

Latest revision as of 01:11, 2 February 2020

Forwards Proposed Changes to Tech Specs Re Addition of Feedwater Bypass Valves.Supporting Documentation & Class III Fee Encl
ML19254D923
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/23/1979
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19254D924 List:
References
NUDOCS 7910300319
Download: ML19254D923 (2)


Text

Alabama Power Company

  • -
  • 600 North 18th Street Post Office Box 2641 Dirmingham. Alabama 35291 Telephwie 205 323-5341 L k Eboi'v^c'e'#,h@nt AlabamaPower the smn elettnc systern October 23, 1979 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Mr. A. Schwencer

Dear Mr. Schwencer:

RE: Change to Operating License No.

NPF-2 Technical Specifications Alabama Power Company proposes the attached change to Joseph M. Farley Nuclear Plant Operating License No. NPF-2 Technical Specification involving the following item:

Technical Specification Table 3.3-5 concerning addition of feedwater bypass valves to this table of engineered

__ safety features response times.

The Plant Operations Review Committee and the Nuclear Operations Revicu Board have reviewed the above proposed change and have detercined that the change does not involve an unreviewed safety question as shown in the attached safety evaluation.

This item is designated class III according to 10 CFR 170 requirements.

A check for $4,000 is enclosed to cover the fees required.

~~

In accordance with 10CFR50.30(c)(1)(1), three (3) signed originals and thirty-seven(37) additional copies of this proposed amendment are enclosed.

If you have any questions, please advise.

Yours very truly,

& l$ tL -

'F)L.Clayton,Jr. i V

FLCJr/TNE:bhj SWORN TO AND SUBSCRIBED BEFORE ME THIS & DAY OF October __.

Enclosures 1979.

cc: Mr. R. A. Thomas Mr. G. F. Trowbridge /)r [2 y[fL a }' f

[h'o tarypublic G/

My Commission Expires: 5-22-82 79103003/7 jvz 77-