{{#Wiki_filter:vJ--7D,--UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 19, 2006 OFFICE OF THE GENERAL COUNSEL Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 Administrative Judge Lester S. Rubenstein Atomic Safety and Licensing Board Panel 4760 East Country Villa Drive Tucson, AZ 85718 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.(Vermont Yankee Nuclear Power Station)Docket No. 50-271 -OLA Dear Administrative Judges: On December 21, 2005, the Atomic Safety and Licensing Board issued its"Memorandum and Order (Ruling on Deliberative Process Privilege Claims)" ("Order"), concerning the State of Vermont Department of Public Service's
{{#Wiki_filter:vJ--
("DPS") two Motions to Compel Production of Certain NRC Staff ("Staff")
UNITED STATES 7D,--
Documents, filed on August 31, 2005, and September 29, 2005, respectively.
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 19, 2006 OFFICE OF THE GENERAL COUNSEL Administrative Judge Alex S. Karlin, Chair           Administrative Judge Lester S. Rubenstein Atomic Safety and Licensing Board Panel              Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission                   4760 East Country Villa Drive Mail Stop: T-3F23                                   Tucson, AZ 85718 Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.
In the Order, the Board directed the Staff to resubmit its deliberative process privilege logs filed between September 6, 2005, and December 21, 2005, under procedures outlined by the Board, including "the name and job title of the most senior person who made the decision to withhold the document and assert the [deliberative process]privilege." In accordance with the Board's Order, the Staff submits the enclosed documents concerning its claim of the deliberative process privilege for the documents at issue.Jason C. Zorn Counsel for NRC Staff  
(Vermont Yankee Nuclear Power Station)
Docket No. 50-271 -OLA
 
==Dear Administrative Judges:==
 
On December 21, 2005, the Atomic Safety and Licensing Board issued its "Memorandum and Order (Ruling on Deliberative Process Privilege Claims)" ("Order"),
concerning the State of Vermont Department of Public Service's ("DPS") two Motions to Compel Production of Certain NRC Staff ("Staff") Documents, filed on August 31, 2005, and September 29, 2005, respectively. In the Order, the Board directed the Staff to resubmit its deliberative process privilege logs filed between September 6, 2005, and December 21, 2005, under procedures outlined by the Board, including "the name and job title of the most senior person who made the decision to withhold the document and assert the [deliberative process]
privilege." In accordance with the Board's Order, the Staff submits the enclosed documents concerning its claim of the deliberative process privilege for the documents at issue.
Jason C. Zorn Counsel for NRC Staff


==Enclosures:==
==Enclosures:==
Affidavit of Catherine Haney Deliberative Process Privilege Logs (Supplements 13 - 18) cc: Service List
I _W    -
January 18, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
                                                        )
ENTERGY NUCLEAR VERMONT YANKEE                      )        Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR                          )
OPERATIONS, INC.                                )        ASLBP No. 04-832-02-OLA (Vermont Yankee Nuclear Power Station)              )
AFFIDAVIT OF CATHERINE HANEY I, Catherine Haney, being first duly sworn, do hereby state as follows:
: 1.      I am employed as the Director of the Division of Operating Reactor Licensing
("DORL") in the Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation ("NRR"). My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Vermont Yankee Nuclear Power Station Extended Power Uprate ("EPU")
license amendment application.
: 2.      During the course of its review and evaluation of the EPU license amendment application, the NRC Staff has generated or used documents that Staff members under my supervision have identified as privileged because the documents contained predecisional information related to the Staff's deliberative process. Although the identity of those documents has been disclosed during a document review process conducted as part of this proceeding, the documents themselves have been withheld in accordance with 10 C.F.R. § 2.390(a)(5) and NRC Management Directive 3.4.
: 3.      I am aware that the Atomic Safety and Licensing Board ("Board") ordered the Staff to resubmit privilege logs that it had filed between September 6, 2005, and December 21,
2 2005, including the name and job title of a senior individual who has decided to withhold documents identified in those logs.
: 4.      The total number of privileged documents identified in the privilege logs filed from September 6, 2005, to December 21, 2005, is 141. Of those, 40 have previously been reviewed and withheld by myself or my predecessor, Ledyard B. Marsh. Further, those 101 documents had previously been reviewed by another person within NRR with less senior responsibilities. Thus, the Board's December 21, 2005, Order applies to a total of 101 documents.
: 5.      I have personally reviewed each of the 101 documents in question, and have determined, in accordance with the guidance contained in Management Directive 3.4, that they contain predecisional information concerning the Staff's review of the EPU application. All of the documents contain the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary to the Staff's review of the pending EPU application.
: 6.      Further, I have determined that disclosure of the 101 documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclose of their internal discussions on an unresolved issue would serve to chill all future deliberations and would interfere with our ability to engage in a free exchange of opinions and analyses prior to publishing our final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
: 7. Accordingly, I formally invoke the deliberative process privilege with respect to


Affidavit of Catherine Haney Deliberative Process Privilege Logs (Supplements 13 -18)cc: Service List I _W -January 18, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ))ENTERGY NUCLEAR VERMONT YANKEE ) Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR )OPERATIONS, INC. ) ASLBP No. 04-832-02-OLA (Vermont Yankee Nuclear Power Station) )AFFIDAVIT OF CATHERINE HANEY I, Catherine Haney, being first duly sworn, do hereby state as follows: 1. I am employed as the Director of the Division of Operating Reactor Licensing ("DORL") in the Nuclear Regulatory Commission's
Tr~  F, 3
("NRC") Office of Nuclear Reactor Regulation
each of the 101 documents affected by the Board's December 21, 2005, Order.
("NRR"). My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Vermont Yankee Nuclear Power Station Extended Power Uprate ("EPU")license amendment application.
: 8.      I hereby certify that the foregoing is true and complete to the best of my knowledge, information and belief.
: 2. During the course of its review and evaluation of the EPU license amendment application, the NRC Staff has generated or used documents that Staff members under my supervision have identified as privileged because the documents contained predecisional information related to the Staff's deliberative process. Although the identity of those documents has been disclosed during a document review process conducted as part of this proceeding, the documents themselves have been withheld in accordance with 10 C.F.R. § 2.390(a)(5) and NRC Management Directive 3.4.3. I am aware that the Atomic Safety and Licensing Board ("Board")
Cn            /
ordered the Staff to resubmit privilege logs that it had filed between September 6, 2005, and December 21, 2 2005, including the name and job title of a senior individual who has decided to withhold documents identified in those logs.4. The total number of privileged documents identified in the privilege logs filed from September 6, 2005, to December 21, 2005, is 141. Of those, 40 have previously been reviewed and withheld by myself or my predecessor, Ledyard B. Marsh. Further, those 101 documents had previously been reviewed by another person within NRR with less senior responsibilities.
Catherine Haneyv Subscribed and sworn to before me this 18t day of January, 2006.
Thus, the Board's December 21, 2005, Order applies to a total of 101 documents.
(_ \9(t
: 5. I have personally reviewed each of the 101 documents in question, and have determined, in accordance with the guidance contained in Management Directive 3.4, that they contain predecisional information concerning the Staff's review of the EPU application.
* 7  *LI
All of the documents contain the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary to the Staff's review of the pending EPU application.
                    )                   t~
: 6. Further, I have determined that disclosure of the 101 documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclose of their internal discussions on an unresolved issue would serve to chill all future deliberations and would interfere with our ability to engage in a free exchange of opinions and analyses prior to publishing our final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.7. Accordingly, I formally invoke the deliberative process privilege with respect to Tr~ F, 3 each of the 101 documents affected by the Board's December 21, 2005, Order.8. I hereby certify that the foregoing is true and complete to the best of my knowledge, information and belief.C n /Catherine Haneyv Subscribed and sworn to before me this 1 8t day of January, 2006.* *LI 7 (_ \9( t ) t~Mntn Mt Plihinu: My commission expires: VC 1h 9 X 7 CIRCE E. MARTIN NOTARY PUBLIC STATE OF MARYLAND My Commission Expires March 1, 2007 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 -September 6, 2005 Reissued January 19, 2006'Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information.
Mntn Mt Plihinu:
Pursuant to 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
My commission expires:                  VC 1h X        9    7 CIRCE E. MARTIN NOTARY PUBLIC STATE OF MARYLAND My Commission Expires March 1, 2007
Accession Author Title/Description:
 
Document Document Addressee
VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 - September 6, 2005 Reissued January 19, 2006' Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
/ Comment Page Number Name/Affiliation:
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
Date Type Addressee Count Affiliation ML052230210 Razzaque M M, E-mail Razzaque, 8/10/2005 E-Mail Ennis R B, Contains draft 3 NRC/NRR NRR, to Ennis, NRR NRC/NRR requests for Re: VY EPU RAls. information regarUin lthe the effect of the EPU on new and spent fuel storage 1 The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that the thirteen documents in this privilege log that have been shaded in grey should be withheld from public disclosure under the deliberative process privilege.
Accession              Author            Title/Description:      Document    Document        Addressee /            Comment      Page Number          Name/Affiliation:                                    Date        Type          Addressee                            Count Affiliation ML052230210        Razzaque M M,           E-mail Razzaque,        8/10/2005      E-Mail        Ennis R B,     Contains draft        3 NRC/NRR            NRR, to Ennis, NRR                                      NRC/NRR        requests for Re: VY EPU RAls.                                                        information regarUin lthe the effect of the EPU on new and spent fuel storage 1 The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that the thirteen documents in this privilege log that have been shaded in grey should be withheld from public disclosure under the deliberative process privilege. For those twenty-five documents not shaded in grey, Ledyard B. Marsh, the previous Director of the Division of Licensing and Project Management, had made the decision to withhold those documents under the deliberative process privilege. See NRC Staff's Answer to Vermont Department of Public Service's Second Motion to Compel at 10-1 1.
For those twenty-five documents not shaded in grey, Ledyard B. Marsh, the previous Director of the Division of Licensing and Project Management, had made the decision to withhold those documents under the deliberative process privilege.
 
See NRC Staff's Answer to Vermont Department of Public Service's Second Motion to Compel at 10-1 1.
PRIVILEGE LOG - DELIBERATIVE PROCESS                                                    SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
Accession            Author            Title/Description:      Document        Document        Addressee /            Comment        Page Number        Name/Affiliation:                                    Date          Type            Addressee                            Count Affiliation ML052230209      Razzaque M M,            E-mail Razzaque,       8/10/2005        E-Mail          Ennis R B,      Contains draft        3 NRC/NRR            NRR, to Ennis, NRR,                                        NRC/NRR        requests for Re: VY EPU RAls.                                                          information regarding single loop operation of shutdown cooling and clarification of terms in previous responses to RAls ML052230204          Reddy D K-        F-mai! RPddy, NRR,       8!10200o5        F-Mai!          Ennis R R-      Contains staff        2 NRC/NRR            to Ennis, NRR, Re:                                        NRC/NRR        discussion of VY EPU RAls.                                                           responses to RAls regarding stability and reliability of condensate and feedwater system ML052310065        Ennis R' B,         E-mail Ennis, NRR,      8/15/2005        E-Mail    i      Pal A N,      Contains staff        2 iNRC/NRR                              .: toPal,
Document Document Addressee
:6      NRR, Re: VY:                                      NRC/NRR          recommendations EPU SBO Response.                                                          to draft safety evaluation regarding station
/ Comment Page Number Name/Affiliation:
:_:___
Date Type Addressee Count Affiliation ML052230209 Razzaque M M, E-mail Razzaque, 8/10/2005 E-Mail Ennis R B, Contains draft 3 NRC/NRR NRR, to Ennis, NRR, NRC/NRR requests for Re: VY EPU RAls. information regarding single loop operation of shutdown cooling and clarification of terms in previous responses to RAls ML052230204 Reddy D K- F-mai! RPddy, NRR, 8!10200o5 F-Mai! Ennis R R- Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAls. responses to RAls regarding stability and reliability of condensate and feedwater system ML052310065 Ennis R' B, E-mail Ennis, NRR, 8/15/2005 E-Mail i Pal A N, Contains staff 2 iNRC/NRR .: :6 toPal, NRR, Re: VY: NRC/NRR recommendations EPU SBO Response.
_ ____
to draft safety evaluation regarding station:_:___ ___ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -_ _ ___ ___ __ _ _ _ _ _ _ _ _ _ : ___ ___ ___ __ b lac ko ut an aly sis VI PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
_ ___
Document Document Addressee  
_ _ __ __ _ _  _ _ _ _ _ _ _ __ __ -__ ___  ___    __ __ __ _ __ _ _  : ___  ___  ___ __  blacko ut an alysis
/ Comment Page Number Name/Affiliation:
 
Date Type Addressee Count Affiliation ML052310072 Jacobson J, : E-mail Jacobson, 8/15/2005 E-Mail Ennis R, Pal A, Contains staff 2 NRC/NRR NRR, To Ennis, NRC/NRR recommendations NRR,:Re: VY EPU to draft safety SBQ Response.
VI PRIVILEGE LOG - DELIBERATIVE PROCESS                                                              SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
evaluation regarding station______________blackout analysis _ _ _ _ML052340120 Ennis R 1B, uNRC/NRR'E-mail Ennis,. NRR,l00 l to:Pal and:1 :. :.Razzaque,'NRR, Re;VY EPU RAls--.8/17/2005: E-Mail-.: Pal:A N, I'Razzaque M M, NRC/NRR-.
Accession        Author                      Title/Description:    Document              Document      Addressee /            Comment            Page Number     Name/Affiliation:                                           Date               Type         Addressee                                 Count Affiliation ML052310072      Jacobson J,                   : E-mail Jacobson,     8/15/2005             E-Mail     Ennis R, Pal A, Contains staff                2 NRC/NRR                         NRR, To Ennis,                                             NRC/NRR     recommendations NRR,:Re: VY EPU                                                           to draft safety SBQ Response.                                                           evaluation regarding station
.Contains: information regarding NRC's staff's internal scheduling practices and several pages of previously disclosed requests for additional information 9 ML052340040 Pal A N, E-mail.Pal, NRR, to 8/17/2005 E-Mail : Ennis R B3, Contains NRC/NRR/ADPT Ennis, NRR,, Re: VY NRC/NRR information EPU. RlAs. regarding NRC's staff's internal scheduling
______________blackout analysis _  _  _ _
__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _:.: _ _' _' _ _ _ _ _ _ --. i : .d .: p r a c t i c e s PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
ML052340120      Ennis R 1B,                  E-mail Ennis,. NRR,     8/17/2005            :E-Mail-      .:Pal:A N, I Contains:                      9 uNRC/NRR'                  l00 l to:Pal and:1 :. :.                                   'Razzaque M M, information Razzaque,'NRR, Re;                                              NRC/NRR-. . regarding NRC's VY EPU RAls--.                                                          staff's internal scheduling practices and several pages of previously disclosed requests for additional information ML052340040        Pal A N,                    E-mail.Pal, NRR, to    8/17/2005              E-Mail :      Ennis R B3,  Contains NRC/NRR/ADPT                    Ennis, NRR,, Re: VY                                            NRC/NRR      information EPU. RlAs.                                                            regarding NRC's staff's internal scheduling
Document Document Addressee
__          _                                                          _ _'_'_ ___ _.:
/ Comment Page Number Name/Affiliation:
___ ______ ______ ______ _ _:.:          i:.d
Date Type Addressee Count Affiliation ML052340037 Ennis R B, E-mail Ennis, NRR, 8/18/2005 E-Mail Pal-A N, Contains 2 NRC/NRR/ADPT to Razzaque and Razzaque M M, information Pal, NRR, Re: VY NRC/NRR/ADP regarding NRC's EPU Conference:
                                                                                        -_.                              p ra c t i c e s
T staff's internal Call. scheduling
 
_________-___
PRIVILEGE LOG - DELIBERATIVE PROCESS                                                SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
practices ML052340101 Ennis R B, E-mail Ennis, NRR, 8/18/2005 E-Mail Reddy D K, Contains draft 5 NRC/NRR to Reddy, NRR, Re: NRC/NRR requests for VY EPU RAls. additional information reaardina condensate and feedwater system ML052340038 Razzaque M M, E-mail Razzaque, 8/18/2005 E-Mail Ennis R B, Contains 2 NRC/NRR NRR,^to Ennis, NRR NRC/NRR information Re:VY EPU regarding NRC's Conference CAll. staff's internal scheduling
Accession          Author                Title/Description: Document      Document        Addressee /        Comment        Page Number      Name/Affiliation:                                  Date          Type        Addressee                        Count Affiliation ML052340037        Ennis R B,              E-mail Ennis, NRR, 8/18/2005        E-Mail        Pal-A N,  Contains               2 NRC/NRR/ADPT                  to Razzaque and                                Razzaque M M, information Pal, NRR, Re: VY                              NRC/NRR/ADP    regarding NRC's EPU Conference:                                        T      staff's internal Call.                                                   scheduling
_______________
_________-___                  practices ML052340101        Ennis R B,             E-mail Ennis, NRR, 8/18/2005       E-Mail       Reddy D K, Contains draft          5 NRC/NRR               to Reddy, NRR, Re:                                 NRC/NRR     requests for VY EPU RAls.                                               additional information reaardina condensate and feedwater system ML052340038    Razzaque M M,                E-mail Razzaque,  8/18/2005        E-Mail      Ennis R B,  Contains                2 NRC/NRR              NRR,^to Ennis, NRR                                  NRC/NRR    information Re:VY EPU                                                  regarding NRC's Conference CAll.                                              staff's internal scheduling
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _________
__ _ __ __ __ _ __ __ __ _ _________
_ _ _ p ra ctice s S PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06),1'Accession Author Title/Description:
_______________                                  _     S      _               _             p ra ctices
Document Document Addressee
 
/ Comment Page Number Name/Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)   ,1' Accession       Author         Title/Description: Document Document     Addressee /       Comment         Page Number     Name/Affiliation:                       Date     Type       Addressee                         Count Affiliation ML052310075    Reddy D K,     E-mail Reddy, NRR, 8/18/2005   E-Mail     Ennis R B,   Contains staff         5 NRC/NRR       to Ennis, NRR, Re:                         NRC/NRR      discussion of VY EPU RAls.                                          response to request for additional information regarding condensate and feedwater system ML052340089    Reddy D K,     E-mail Reddy, NRR, 8/18/2005  E-Mail      Ennis R B,  Contains staff          5 NRr/NRR        to Ennis, NRR, Re:                                      discussion of VY EPU RAls.                                         response to request for additional information regarding condensate and feedwater system ML052340108    Thomas G,          E-mail Thomas,  8/18/2005   E-Mail     Ennis R B,   Contains draft          2 NRC/NRR       NRR, to Ennis, NRR,                         NRC/NRR     request for Re: VY EPU Review.                                       additional information regarding accident and transient analyses
Date Type Addressee Count Affiliation ML052310075 Reddy D K, E-mail Reddy, NRR, 8/18/2005 E-Mail Ennis R B, Contains staff 5 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAls. response to request for additional information regarding condensate and feedwater system ML052340089 Reddy D K, E-mail Reddy, NRR, 8/18/2005 E-Mail Ennis R B, Contains staff 5 NRr/NRR to Ennis, NRR, Re: discussion of VY EPU RAls. response to request for additional information regarding condensate and feedwater system ML052340108 Thomas G, E-mail Thomas, 8/18/2005 E-Mail Ennis R B, Contains draft 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR request for Re: VY EPU Review. additional information regarding accident and transient analyses PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
 
Document Document Addressee
PRIVILEGE LOG - DELIBERATIVE PROCESS                                  SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
/ Comment Page Number Name/Affiliation:
Accession        Author        Title/Description:   Document  Document    Addressee /          Comment          Page Number      Name/Affiliation:                         Date    Type        Addressee                          Count Affiliation ML052340239      Ennis R B,    E-mail Ennis, NRR,    8/19/2005  E-Mail      Jones S R,    Contains staff        2 NRC/NRR        to Jones, NRR, Re:                             NRC/NRR      discussion of VY EPU RAls.                                            response to request for additional information regarding condensate and feedwater system ML052340258      Ennis R B,     E-mail Ennis, NRR,   8/19/2005   E-Mail     Thomas G,     Contains draft NRC/NRR         to Thomas, NRR,                             NRC/NRR       request for Re: VY EPU RAls.                                           additional information regarding accident and transient analyses ML052340262    Jones S R,     E-mail Jones, NRR,   8/19/2005   E-Mail       Ennis R B,   Contains staff          2 NRC/NRR         to Ennis, NRR, Re:                           NRC/NRR       discussion of VY EPU RAls.                                             response to request for additional information regarding condensate and J                                    J.
Date Type Addressee Count Affiliation ML052340239 Ennis R B, NRC/NRR E-mail Ennis, NRR, to Jones, NRR, Re: VY EPU RAls.8/19/2005 E-Mail Jones S R, NRC/NRR Contains staff discussion of response to request for additional information regarding condensate and feedwater system 2 ML052340258 Ennis R B, E-mail Ennis, NRR, 8/19/2005 E-Mail Thomas G, Contains draft NRC/NRR to Thomas, NRR, NRC/NRR request for Re: VY EPU RAls. additional information regarding accident and transient analyses ML052340262 Jones S R, NRC/NRR E-mail Jones, NRR, to Ennis, NRR, Re: VY EPU RAls.8/19/2005 E-Mail Ennis R B, NRC/NRR Contains staff discussion of response to request for additional information regarding condensate and feedwater system 2 J J. I PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
feedwater system   I
Document Document Addressee
 
/ Comment Page Number Name/Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                                        SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
Date Type Addressee Count Affiliation ML052340251 Jones S R, E-mail Jones, NRR, 8/19/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAls. response to request for additional information regarding condensate and feedwater system ML052360313 Ennis R B, E-mail Ennis, NRR, 8/22/2005 E-Mail, PaIA N, Contains 9 NRG/NRR to RazzaqueNP, Requst Ifnr Razzaque M M, informton
Accession          Author          Title/Description:  Document  Document        Addressee /          Comment      Page Number      Name/Affiliation:                            Date      Type          Addressee                        Count Affiliation ML052340251        Jones S R,       E-mail Jones, NRR,  8/19/2005    E-Mail        Ennis R B,    Contains staff        2 NRC/NRR           to Ennis, NRR, Re:                               NRC/NRR        discussion of VY EPU RAls.                                                response to request for additional information regarding condensate and feedwater system ML052360313        Ennis R B,        E-mail Ennis, NRR,  8/22/2005    E-Mail,          PaIA N,      Contains              9 NRG/NRR          to RazzaqueNP,                Requst    Ifnr Razzaque M    M, informton        :
: Et. Al., ReL gVY EPU Additional Thomas G, regarding NRC RAls, Information NRC/NRR staff's internal (RAI) scheduling
Et. Al., ReL gVY EPU            Additional      Thomas G,      regarding NRC RAls,                Information        NRC/NRR      staff's internal (RAI)                        scheduling
._____________
          .___
.___ n__ ::__ :__ ::practices
._____________ n__            ::__:__    ::practices                                                            :
: ML052360320 Thomas G, E-Mail Thomas, 8/22/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR recommendations Re: VY EPU RAI. to changes to request for additional information PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
ML052360320        Thomas G,           E-Mail Thomas,   8/22/2005   E-Mail         Ennis R B,     Contains staff       2 NRC/NRR         NRR, to Ennis, NRR,                               NRC/NRR       recommendations Re: VY EPU RAI.                                               to changes to request for additional information
Document Document Addressee  
 
/ Comment Page Number Name/Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                                SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
Date Type Addressee Count Affiliation ML052410318 Abdullahi Z, E-mail Abdullahi, 8/25/2005 E-Mail Ennis R B, Contains staff 9 NRC/NRR NRR, to Ennis, NRR, NRC/NRR recommendations Re: VY EPU RAls. to changes to request for additional information regarding linear heat generation rate ML052410385 Abdullahi Z, E-mail Abdullahi, 8/25/2005 E-Mail Ennis R B, Contains staff 18 NRC/NRR NRR, to Ennis. NRR, NRrG/NRR rrcnmmrendations Re: VY EPU RAls. to changes to request for additional information regarding linear heat generation rate PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
Accession        Author        Title/Description: Document  Document    Addressee /       Comment          Page Number      Name/Affiliation:                        Date    Type        Addressee                        Count Affiliation ML052410318    Abdullahi Z,      E-mail Abdullahi, 8/25/2005  E-Mail      Ennis R B,   Contains staff          9 NRC/NRR       NRR, to Ennis, NRR,                         NRC/NRR     recommendations Re: VY EPU RAls.                                       to changes to request for additional information regarding linear heat generation rate ML052410385    Abdullahi Z,      E-mail Abdullahi, 8/25/2005  E-Mail      Ennis R B,  Contains staff        18 NRC/NRR        NRR, to Ennis. NRR,                        NRrG/NRR    rrcnmmrendations Re: VY EPU RAls.                                        to changes to request for additional information regarding linear heat generation rate
Document Document Addressee I Comment Page Number Name/Affiliation:
 
Date Type Addressee Count Affiliation ML052410296 Ennis R B, E-mail Ennis, NRR, 8/25/2005 E-Mail Holden C F, Contains staff 4 NRC/NRR to Holden, NRR, Re: NRC/NRR recommendations VY EPU & regarding internal Conference Call. procedures for following up responses to requests for additional information ML052410379 Ennis R B, E-mail Ennis, NRR, 8/25/2005 E-Mail Jones S R, Contains staff 6 NRC/NRR to Jones. NRR. Re: NRC/NRR recommendations VY EPU RAIs. to changes to request for additional information regarding condensate and feedwater system PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)'V Accession Author Title/Description:
PRIVILEGE LOG - DELIBERATIVE PROCESS                                SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
Document Document Addressee I Comment Page Number Name/Affiliation:
Accession        Author          Title/Description: Document  Document    Addressee I        Comment          Page Number     Name/Affiliation:                         Date     Type       Addressee                         Count Affiliation ML052410296      Ennis R B,     E-mail Ennis, NRR, 8/25/2005   E-Mail     Holden C F, Contains staff          4 NRC/NRR       to Holden, NRR, Re:                          NRC/NRR    recommendations VY EPU &                                          regarding internal Conference Call.                                      procedures for following up responses to requests for additional information ML052410379      Ennis R B,     E-mail Ennis, NRR, 8/25/2005   E-Mail     Jones S R,   Contains staff          6 NRC/NRR         to Jones. NRR. Re:                          NRC/NRR     recommendations VY EPU RAIs.                                         to changes to request for additional information regarding condensate and feedwater system
Date Type Addressee Count Affiliation ML052410310 Marsh L B, E-mail Marsh, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU Conference regarding internal Call. procedures for following up responses to requests for additional information ML052410383 Razzaque M M, E-mail Razzaque, 8/25/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR NRR, to Ennis, NRR, NRG/NRR recommendations Re: VY EPU RAls. to changes to request for additional information regarding maximum and average power densities PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
 
Document Document Addressee
PRIVILEGE LOG - DELIBERATIVE PROCESS                                SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)  'V Accession        Author          Title/Description: Document  Document    Addressee I       Comment          Page Number      Name/Affiliation:                        Date    Type        Addressee                        Count Affiliation ML052410310      Marsh L B,     E-mail Marsh, NRR,   8/25/2005   E-Mail     Ennis R B,   Contains staff         3 NRC/NRR         to Ennis, NRR, Re:                         NRC/NRR     recommendations VY EPU Conference                                        regarding internal Call.                                           procedures for following up responses to requests for additional information ML052410383    Razzaque M M,     E-mail Razzaque,   8/25/2005   E-Mail     Ennis R B,   Contains staff          2 NRC/NRR       NRR, to Ennis, NRR,                         NRG/NRR      recommendations Re: VY EPU RAls.                                       to changes to request for additional information regarding maximum and average power densities
/ Comment Number Name/Affiliation:
 
Date Type Addressee Affiliation ML052410391 Reddy D K, NRC/NRR E-mail Reddy, NRR, to Ennis, NRR Re: VY EPU RAis.8/25/2005 E-Mail Ennis R B, NRC/NRR Contains staff recommendations to changes to request for additional information regarding performance of safety relief valves 3 ML052410316 Reddy D K, E-mail Reddy, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff i 5 KNRC!NRR to Ennis, NRR, Re: NR r/NRR recommendations VY EPU RAls. to changes to request for additional information regarding condensate and feedwater system PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
PRIVILEGE LOG - DELIBERATIVE PROCESS                              SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
Document Document Addressee I Comment Page Number Name/Affiliation:
Accession        Author        Title/Description: Document  Document    Addressee /        Comment Number      Name/Affiliation:                      Date    Type        Addressee Affiliation ML052410391    Reddy D K,      E-mail Reddy, NRR, 8/25/2005  E-Mail      Ennis R B,  Contains staff          3 NRC/NRR        to Ennis, NRR Re:                          NRC/NRR    recommendations VY EPU RAis.                                         to changes to request for additional information regarding performance of safety relief valves ML052410316    Reddy D K,      E-mail Reddy, NRR, 8/25/2005  E-Mail      Ennis R B,  Contains staffi        5 KNRC!NRR      to Ennis, NRR, Re:                          NRr/NRR    recommendations VY EPU RAls.                                        to changes to request for additional information regarding condensate and feedwater system
Date Type Addressee Count Affiliation ML052410395 Tatum J E, E-mail Tatum, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAls. to changes to request for additional information regarding condensate and feedwater system ML052420358 Jones S R, E-Mail Jones, NRR, 8/26/2005 E-Mail Ennis R B. Contains staff 2 NRCKNRR to Ennis NIPP m ENRC/NRR recomnmendations VY EPU RA's. to changes to request for additional information regarding condensate and feedwater system PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
 
Document Document Addressee
PRIVILEGE LOG - DELIBERATIVE PROCESS                                SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
/ Comment Page Number Name/Affiliation:
Accession       Author       Title/Description: Document   Document     Addressee I        Comment         Page Number     Name/Affiliation:                       Date     Type       Addressee                         Count Affiliation ML052410395    Tatum J E,     E-mail Tatum, NRR, 8/25/2005   E-Mail     Ennis R B,   Contains staff         2 NRC/NRR       to Ennis, NRR, Re:                          NRC/NRR     recommendations VY EPU RAls.                                         to changes to request for additional information regarding condensate and feedwater system ML052420358    Jones S R,     E-Mail Jones, NRR, 8/26/2005   E-Mail     Ennis R B. Contains staff         2 NRCKNRR        to Ennis NIPP    m              ENRC/NRR                 recomnmendations VY EPU RA's.                                         to changes to request for additional information regarding condensate and feedwater system
Date Type Addressee Count Affiliation ML052420371 Jones S R, E-mail Jones, NRR, 8/26/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAI. to changes to request for additional information regarding condensate and feedwater system ML052420376 Jones S R, E-mail Jones, NRR, 8/26/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR to Fnnis, NRR, Re: NPrC!NRP rerommendations VY EPU RAI. to changes to request for additional information regarding performance of safety relief valves ML052420401 Razzaque MM, E-mail Pazzaque, 8/26/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR NRR, to PAL, NRR, NRC/NRR recommendations Re: VY EPUSBO to draft safety Input.: evaluation regarding station_____ _____ _________
 
_____ ____ _____ ____ blackout analysis _ _ _ _
PRIVILEGE LOG - DELIBERATIVE PROCESS                                       SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
Accession         Author       Title/Description:       Document   Document       Addressee /          Comment           Page Number     Name/Affiliation:                               Date     Type           Addressee                             Count Affiliation ML052420371      Jones S R,     E-mail Jones, NRR,         8/26/2005   E-Mail         Ennis R B,     Contains staff           2 NRC/NRR       to Ennis, NRR, Re:                                     NRC/NRR       recommendations VY EPU RAI.                                                     to changes to request for additional information regarding condensate and feedwater system ML052420376      Jones S R,     E-mail Jones, NRR,         8/26/2005   E-Mail         Ennis R B,     Contains staff           3 NRC/NRR       to Fnnis, NRR, Re:                                     NPrC!NRP      rerommendations VY EPU RAI.                                                     to changes to request for additional information regarding performance of safety relief valves ML052420401    Razzaque MM,      E-mail Pazzaque,          8/26/2005    E-Mail        Ennis R B,    Contains staff            3 NRC/NRR        NRR, to PAL, NRR,                                      NRC/NRR        recommendations Re: VY EPUSBO                                                        to draft safety Input.:                                                     evaluation regarding station
Document Document Addressee
_____    _____  _________      _____            ____  _____  ____ blackout analysis    _  _  _ _
/ Comment Page Number Name/Affiliation:
 
Date Type Addressee Count Affiliation ML052420384 Tatum J E, NRC/NRR E-mail Tatum, NRR, to Ennis, NRR, Re: VY EPU RAis.8/26/2005 E-Mail Ennis R B, NRC/NRR Contains staff recommendations to changes to request for additional information regarding condensate and feedwater system 2 ML052420409 Ennis R'B, E-rmailEnnis, NRR, 1 8/29/2005'l:
PRIVILEGE LOG - DELIBERATIVE PROCESS                                              SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
E-Mail [ Holden C F, Contains 1NRC/NRR 4. to Holden, NRR, Et- info^rmatio,,:Al., Re:,VYEPU' regarding NRC Conference Cal. ' staff internal scheduling
Accession              Author            Title/Description:   Document      Document      Addressee /          Comment      Page Number          Name/Affiliation:                              Date          Type          Addressee                      Count Affiliation ML052420384          Tatum J E,       E-mail Tatum, NRR,     8/26/2005       E-Mail       Ennis R B, Contains staff       2 NRC/NRR           to Ennis, NRR, Re:                                  NRC/NRR     recommendations VY EPU RAis.                                                 to changes to request for additional information regarding condensate and feedwater system ML052420409          Ennis R'B,
____ __ __ __ _ practices ML052420408 Ennis R B, E-mail, Ennis, NRR, 8/29/2005 E-Mail Holden C F, Contains NRC/NRR to Holden, NRR, Et. NRC/NRR information Al., Re: VY EPU regarding NRC Conference Call. staff internal scheduling
: 4. 1NRC/NRRE-Mail[
-'_________'-
E-rmailEnnis, NRR, to Holden, NRR, Et-1 8/29/2005'l:                 Holden C F,  Contains info^rmatio,,
__ '____________
:Al., Re:,VYEPU'                                              regarding NRC Conference Cal.  '                                            staff internal scheduling
_ __ __ __ __' p ra ctic es PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)Accession Author Title/Description:
____  __                          __            __            _              practices ML052420408          Ennis R B,        E-mail, Ennis, NRR,    8/29/2005       E-Mail       Holden C F, Contains NRC/NRR           to Holden, NRR, Et.                                  NRC/NRR    information Al., Re: VY EPU                                                regarding NRC Conference Call.                                                staff internal scheduling
Document Document Addressee
-'_________'- __ '____________      _ __                    __            __            __'            p ra ctices
/ Comment Page Number Name/Affiliation:
 
Date Type Addressee Count Affiliation ML052440380 Ennis R B, E-mail Ennis, NRR, 8/30/2005 E-Mail Abdullahi Z, Contains 3 NRC/NRR to Wermiel, NRR, Et. Akstulewicz F information AL., Re:VY:EPUGE M, Wermiel-J regarding NRC Audit. S. NRC/NRR staff internal scheduling
PRIVILEGE LOG - DELIBERATIVE PROCESS                                                                                          SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)
_______________
Accession        Author                              Title/Description:                            Document        Document          Addressee /                      Comment  Page Number      Name/Affiliation:                                                                          Date          Type              Addressee                                Count Affiliation ML052440380      Ennis R B,                         E-mail Ennis, NRR,                             8/30/2005        E-Mail            Abdullahi Z,              Contains          3 NRC/NRR                         to Wermiel, NRR, Et.                                                                 Akstulewicz F              information AL., Re:VY:EPUGE                                                                    M, Wermiel-J                regarding NRC Audit.                                                            S. NRC/NRR                staff internal scheduling
__________________
_________________________________ ___                                        ___  __ -
___ ___ __ __ _ _ _ _ _ ________:_0
__  _ _ f _ : _ _: ________:_0
-f : : ;:: practiceses:
                                                                                                                                      ;::                        practiceses:
ML052440378 Ennis R B, E-mail Ennis, NRR, 8/31/2005 E-Mail' Thomas G, Contains 2 NRC/NRR to Thormias,'Re:R VY NRC/NRR; information EPU Question.
ML052440378      Ennis R B,                          E-mail Ennis, NRR,                             8/31/2005         E-Mail'          Thomas G,                 Contains           2 NRC/NRR                             to Thormias,'Re:R                  VY                                                NRC/NRR;                information EPU Question.                                                 '    :z                                regarding NRC staff internal~
' :z regarding NRC staff internal~sheduling,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p ra c tic e s_ _ _ _ _ML052440373 Ennis R B, E-mail Ennis, NRR, 8/31/2005:
sheduling,
:l E-Mail We rmiel J S, Contains 3 NRC/NRR to Wermiel, NRR, N RC/NPRR: information Re: VY EPU Audit. regarding NRC Staff internal scheduling
__ __ _  _ _ _ _ __    _  _    _    _  _  _  _    _      _  _  _  _  _  _ _                            _ _ _ _  _ _ _ _ _  _ _ _ _ p ra c tic e s_  _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p ra c tic e s_ _ _ _ _
ML052440373      Ennis R B,                          E-mail Ennis, NRR,                            8/31/2005:    :l  E-Mail          We rmiel J S,              Contains          3 NRC/NRR                               to Wermiel, NRR,                                                                  NRC/NPRR:              information Re: VY EPU Audit.                                                                                            regarding NRC Staff internal scheduling
VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -September 29,2005 Reissued January 19, 20061 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information.
__ __ __  _ __ _ __ _  _  _ _ _ _ _ __ _ _ __ _ _ _ _ _ _ _ __ _ _  _ _                                  _  _ _ _ _  _ _ _ _  _ _ _  p rac tice s_  _ _ _ _
Pursuant to 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
 
PDP Accession Author Title/ Document Document Addressee  
VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - September 29,2005 Reissued January 19, 20061 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
/ Comment Page No. Number Name/
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
PDP       Accession           Author               Title/         Document     Document       Addressee /             Comment         Page No.         Number             Name/          


== Description:==
== Description:==
Date        Type          Addressee                              Count Affiliation:                                                        Affiliation 14-01    ML052500332        Stutzke M A,      E-mail, Stutzke,      9/2/2005      E-Mail        Ennis R B,      Contains NRC staff      2 NRC/NRR          NRR, to Ennis,                                    NRC/NRR          discussion of NRR, Re: VY                                                        preliminary results of EPU                                                          risk evaluation of Containment                                                        containment Overpressure                                                      overpressure credit Credit.
14-02    ML052450441          Ward L W,          E-mail, Ward,        9/2/2005      E-Mail        Lobel R M,      Contains NRC staff      2 NRC/NRR          NRR, to Lobel,                                    NRC/NRR          analysis of LBLOCA NRR, Re: BY                                                        mass and energy EPU LBLOCA                                                        release calculations Calc.
                ' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
1 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                                 SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)
Affiliation 14-01 ML052500332 Stutzke M A, E-mail, Stutzke, 9/2/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of NRR, Re: VY preliminary results of EPU risk evaluation of Containment containment Overpressure overpressure credit Credit.14-02 ML052450441 Ward L W, E-mail, Ward, 9/2/2005 E-Mail Lobel R M, Contains NRC staff 2 NRC/NRR NRR, to Lobel, NRC/NRR analysis of LBLOCA NRR, Re: BY mass and energy EPU LBLOCA release calculations Calc.' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
PDP     Accession       Author           Title/       Document   Document     Addressee I         Comment         Page No.     Number         Name/      
1 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type        Addressee                            Count Affiliation:                                            Affiliation 14-03  ML052500337    Abdullahi Z, E-mail, Abdullahi,  9/8/2005    E-Mail  Gehin J C, Oak  Contains discussion      4 NRC/NRR      NRR, to Gehin,                          Ridge National of internal NRC staff ORNL, Re: VY                              Lab (ORNL)    auditing procedures EPU GE Audit.
14-04  ML052550202      Ennis,      Email, Ennis,    9/8/2005    Email      Abdullahi Z,  Contains information      2 NRC/NRR      NRR, Abdullahi,                            NRC/NRR      regarding internal NRR, re: VY EPU                                          NRC staff scheduling Conference Call                                          practices 14-05  ML052560046    Wang A B.      E-mail Wang,      9/9/2005    E-Mail      Ennis R B,  Contains discussion      2 NRC/NRR      NRR, to Ennis,                            NRC/NRR      of internal NRC staff NRR, Re: VY                                            auditing procedures EPU Conference Call.
14-06  ML052560045    Abdullahi Z,  E-mail Ennis,    9/12/2005    E-Mail      Ennis R B,  Contains information      2 Akstulewicz F    NRR, to                                NRC/NRR      regarding internal M, NRC/NRR      Abdullahi and                                          NRC staff scheduling Akstulewicz,                                          practices NRR, Re: VY EPU Conference Call.
2 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)
Affiliation 14-03 ML052500337 Abdullahi Z, E-mail, Abdullahi, 9/8/2005 E-Mail Gehin J C, Oak Contains discussion 4 NRC/NRR NRR, to Gehin, Ridge National of internal NRC staff ORNL, Re: VY Lab (ORNL) auditing procedures EPU GE Audit.14-04 ML052550202 Ennis, Email, Ennis, 9/8/2005 Email Abdullahi Z, Contains information 2 NRC/NRR NRR, Abdullahi, NRC/NRR regarding internal NRR, re: VY EPU NRC staff scheduling Conference Call practices 14-05 ML052560046 Wang A B. E-mail Wang, 9/9/2005 E-Mail Ennis R B, Contains discussion 2 NRC/NRR NRR, to Ennis, NRC/NRR of internal NRC staff NRR, Re: VY auditing procedures EPU Conference Call.14-06 ML052560045 Abdullahi Z, E-mail Ennis, 9/12/2005 E-Mail Ennis R B, Contains information 2 Akstulewicz F NRR, to NRC/NRR regarding internal M, NRC/NRR Abdullahi and NRC staff scheduling Akstulewicz, practices NRR, Re: VY EPU Conference Call.2 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
PDP       Accession       Author             Title/   Document Document     Addressee /           Comment           Page No.       Number         Name/      
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                              Count Affiliation:                                            Affiliation 14-07    ML052570529    Jones S R,    E-mail, Jones,  9/12/2005  E-Mail      Ennis R B,    Contains NRC staff      3 NRC/NRR      NRR, to Ennis,                          NRC/NRR      analysis of NRR, Re: VY                                          responses to EPU Supplement                                          requests for
: 32.                                            additional information 14-08    ML052580571    Burns T F,  Erosion-          9/12/2005 Memoranda  Anderson C J,    Contains NRC staff's    8 NRC/RGN-    Corrosion/Flow-                          NRC/RGN-      analysis and I/DRS/PSB2    Accelerated-                              I/DRP/PB5      preliminary Corrosion                                                recommendations Monitorin                                                resulting from Activities for                                          inspection of Power Uprate                                            Erosion-Inspection                                              Corrosion/Flow-Feeder for                                              Accelerated-Vermont Yankee,                                          Corrosion Monitoring Inspection Report                                        Activities 05000271/20050 04 14-09    ML052570534    Ennis R B,    E-mail, Ennis,  9/13/2005  E-Mail    Abdullahi Z,    Contains information    4 NRC/NRR          NRR, to                              NRC/NRR      regarding internal Abdullahi, NRR,                                        NRC staff scheduling Et. Al., Re: VY                                        practices EPU Schedule                                    _    _
3 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 14- 09/29/05 (Reissued 01/19/06)
Affiliation 14-07 ML052570529 Jones S R, E-mail, Jones, 9/12/2005 E-Mail Ennis R B, Contains NRC staff 3 NRC/NRR NRR, to Ennis, NRC/NRR analysis of NRR, Re: VY responses to EPU Supplement requests for 32. additional information 14-08 ML052580571 Burns T F, Erosion- 9/12/2005 Memoranda Anderson C J, Contains NRC staff's 8 NRC/RGN- Corrosion/Flow-NRC/RGN- analysis and I/DRS/PSB2 Accelerated-I/DRP/PB5 preliminary Corrosion recommendations Monitorin resulting from Activities for inspection of Power Uprate Erosion-Inspection Corrosion/Flow-Feeder for Accelerated-Vermont Yankee, Corrosion Monitoring Inspection Report Activities 05000271/20050 04 14-09 ML052570534 Ennis R B, E-mail, Ennis, 9/13/2005 E-Mail Abdullahi Z, Contains information 4 NRC/NRR NRR, to NRC/NRR regarding internal Abdullahi, NRR, NRC staff scheduling Et. Al., Re: VY practices EPU Schedule _ _3 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14- 09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/
PDP       Accession       Author           Title/     Document   Document   Addressee I         Comment         Page No.       Number         Name/      


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                          Affiliation 14-10    ML052570530    Ennis R B,    E-mail, Ennis,  9/13/2005    E-Mail    Jones S R,    Contains information    4 NRC/NRR      NRR, to Jones,                            NRC/NRR      regarding internal NRR, Re: VY                                          NRC staff scheduling EPU Supplement                                          practices 32 14-11    ML052570507    Ennis R B,    E-mail, Ennis,  9/13/2005    E-Mail    Sienel B E,  Contains NRC staff      2 NRC/NRR      RGN-1, to Sienel,                        NRC/RGN-I    discussion of NRR, Re: VY                                          contents of draft EPU Review.                                          safety evaluation 14-12    ML052570536    Jones S R,    E-mail, Jones,  9/13/2005    E-Mail    Ennis R B,    Contains information    3 NRC/NRR      NRR, to Ennis,                            NRC/NRR      regarding internal NRR, Re: VY                                          NRC staff scheduling EPU Supplement                                          practices 32.
14-13    ML052570547    Lobel R M,    E-mail, Lobel,  9/13/2005    E-Mail    Ennis R B,    Contains information    3 NRC/NRR      NRR, to Ennis,                            NRC/NRR      regarding internal NRR, Re: VY                                          NRC staff scheduling EPU Schedule.                                          practices 14-14    ML052570544      Pal A N,  E-mail, Pal, NRR,  9/13/2005  E-Mail      Ennis R B,  Contains information    2 NRC/NRR      to Ennis, NRR,                            NRC/NRR      regarding internal Re: VY EPU                                          NRC staff scheduling Schedule.                                          practices 4 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 14 - 09/29105 (Reissued 01/19/06)
Affiliation 14-10 ML052570530 Ennis R B, E-mail, Ennis, 9/13/2005 E-Mail Jones S R, Contains information 4 NRC/NRR NRR, to Jones, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Supplement practices 32 14-11 ML052570507 Ennis R B, E-mail, Ennis, 9/13/2005 E-Mail Sienel B E, Contains NRC staff 2 NRC/NRR RGN-1, to Sienel, NRC/RGN-I discussion of NRR, Re: VY contents of draft EPU Review. safety evaluation 14-12 ML052570536 Jones S R, E-mail, Jones, 9/13/2005 E-Mail Ennis R B, Contains information 3 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Supplement practices 32.14-13 ML052570547 Lobel R M, E-mail, Lobel, 9/13/2005 E-Mail Ennis R B, Contains information 3 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Schedule.
PDP     Accession       Author           Title/     Document Document   Addressee I           Comment         Page No.     Number         Name/      
practices 14-14 ML052570544 Pal A N, E-mail, Pal, NRR, 9/13/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR to Ennis, NRR, NRC/NRR regarding internal Re: VY EPU NRC staff scheduling Schedule.
practices 4 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09/29105 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                          Affiliation 14-15  ML052570518    Sienel B E,    E-mail, Sienel, 9/13/2005  E-Mail    Ennis R B,    Contains NRC staff      2 NRC/RGN-I    RGN-1, to Ennis,                        NRC/NRR        discussion of NRR, Re: VY                                          contents of draft EPU Review.                                          safety evaluation 14-16  ML052590139    Ennis R B,    E-mail, Ennis,  9/14/2005  E-Mail    Jones S R,    Contains information    2 NRC/NRR      NRR, to Ready,                          Reddy D K,    regarding internal NRR, Et. AL., Re:                        Tatum J E,    NRC staff scheduling VY EPU                              NRC/NRR        practices Conference Call.
14-17  ML052570537    Ennis R B,    E-mail, Ennis,  9/14/2005  E-Mail    Reddy D K,    Contains NRC staff      2 NRC/NRR      NRR, to Reddy,                          NRC/NRR        discussion of NRR, Re: VY                                          contents of draft EPU SBO RAI                                          safety evaluation 14-18  ML052590099  Razzaque M        E-mail,      9/14/2005  E-Mail    Ennis R B,    Contains NRC staff      3 M, NRC/NRR    Razzaque, NRR,                          NRC/NRR        discussion regarding to Ennis, NRR,                                        internal review Re: VY EPU                                          practices and Supplement 32                                          contents of draft safety evaluation 5 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                             SUPPLEMENT 14- 09/29/05 (Reissued 01/19/06)
Affiliation 14-15 ML052570518 Sienel B E, E-mail, Sienel, 9/13/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/RGN-I RGN-1, to Ennis, NRC/NRR discussion of NRR, Re: VY contents of draft EPU Review. safety evaluation 14-16 ML052590139 Ennis R B, E-mail, Ennis, 9/14/2005 E-Mail Jones S R, Contains information 2 NRC/NRR NRR, to Ready, Reddy D K, regarding internal NRR, Et. AL., Re: Tatum J E, NRC staff scheduling VY EPU NRC/NRR practices Conference Call.14-17 ML052570537 Ennis R B, E-mail, Ennis, 9/14/2005 E-Mail Reddy D K, Contains NRC staff 2 NRC/NRR NRR, to Reddy, NRC/NRR discussion of NRR, Re: VY contents of draft EPU SBO RAI safety evaluation 14-18 ML052590099 Razzaque M E-mail, 9/14/2005 E-Mail Ennis R B, Contains NRC staff 3 M, NRC/NRR Razzaque, NRR, NRC/NRR discussion regarding to Ennis, NRR, internal review Re: VY EPU practices and Supplement 32 contents of draft safety evaluation 5 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14- 09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
PDP       Accession       Author           Title/     Document Document   Addressee /         Comment         Page No.       Number         Name/      
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                        Affiliation 14-19    ML052570525    Devender R    E-mail, Reddy,  9/14/2005  E-Mail    Ennis R B,    Contains NRC staff      2 K, NRC/NRR    NRR, to Ennis,                        NRC/NRR      discussion regarding NRR, Re: VY                                        internal review EPU SBO RAls                                        practices and contents of draft safety evaluation 14-20    ML052570517    Reddy D K,    E-mail, Reddy,  9/14/2005  E-Mail    Jones S R,    Contains NRC staff      4 NRC/NRR      NRR, to Jones,                        NRC/NRR      discussion of NPR R: VY                                          contet      ofd EPU SBO RAls.                                        safety evaluation 14-21    ML052590136    Tatum J E,    E-mail, Tatum,  9/14/2005  E-Mail    Ennis R B,    Contains information    2 NRC/NRR      NRR, to Ennis,                        NRC/NRR      regarding internal NRR, Re: VY                                        NRC staff scheduling EPU Conference                                        practices Call.
14-22    ML052620316    Ennis R B,    E-mail, Ennis, 9/15/2005  E-Mail  Razzaque M M,  Contains NRC staff      5 NRC/NRR        NRR, to                            NRC/NRR      discussion of Razzaque, NRR,                                        contents of draft
                                      - Re: VY EPU                                        safety evaluation and Supplement 32.                                        draft requests for additional information 6 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                             SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)
Affiliation 14-19 ML052570525 Devender R E-mail, Reddy, 9/14/2005 E-Mail Ennis R B, Contains NRC staff 2 K, NRC/NRR NRR, to Ennis, NRC/NRR discussion regarding NRR, Re: VY internal review EPU SBO RAls practices and contents of draft safety evaluation 14-20 ML052570517 Reddy D K, E-mail, Reddy, 9/14/2005 E-Mail Jones S R, Contains NRC staff 4 NRC/NRR NRR, to Jones, NRC/NRR discussion of NPR R: VY contet ofd EPU SBO RAls. safety evaluation 14-21 ML052590136 Tatum J E, E-mail, Tatum, 9/14/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Conference practices Call.14-22 ML052620316 Ennis R B, E-mail, Ennis, 9/15/2005 E-Mail Razzaque M M, Contains NRC staff 5 NRC/NRR NRR, to NRC/NRR discussion of Razzaque, NRR, contents of draft-Re: VY EPU safety evaluation and Supplement
PDP       Accession       Author           Title/     Document Document   Addressee /         Comment           Page No.       Number         Name/      
: 32. draft requests for additional information 6 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                        Affiliation 14-23    ML052620313    Jones S R,    E-mail, Jones, 9/15/2005  E-Mail    Lyons J E,    Contains NRC staff        4 NRC/NRR      NRR, to Lyons,                        NRC/NRR      analysis of NRR, Re: VY                                        responses to EPU Issues.                                        requests for additional information regarding condensate and feedwater system      .    -
14-24    ML052620321  Razzaque M        E-mail;    9/15/2005  E-Mail    Enniq R R. Contains NRC staff        9 M, NRC/NRR    Razzaque, NRR,                          NRC/NRR      discussion of to Ennis, Re: VY                                      contents of draft EPU Supplement                                        safety evaluation and
: 32.                                            draft requests for additional information 14-25    ML052590108    Reddy D K,    E-mail, Reddy,  9/15/2005  E-Mail    Ennis R B,    Contains NRC staff        2 NRC/NRR      NRR, to Ennis,                        NRC/NRR      discussion of NRR, Re: VY                                          contents of draft EPU SBO Input.                                        safety evaluation 14-26    ML052590060    Reddy D K,    E-mail, Reddy,  9/15/2005  E-Mail      Pal A N,    Contains NRC staff        3 NRC/NRR        NRR, to Pal,                        NRC/NRR      discussion of NRR, Re: VY                                        contents of draft EPU SBO Input.                                        safety evaluation 7 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 14- 09/29/05 (Reissued 01/19/06)
Affiliation 14-23 ML052620313 Jones S R, E-mail, Jones, 9/15/2005 E-Mail Lyons J E, Contains NRC staff 4 NRC/NRR NRR, to Lyons, NRC/NRR analysis of NRR, Re: VY responses to EPU Issues. requests for additional information regarding condensate and feedwater system .-14-24 ML052620321 Razzaque M E-mail; 9/15/2005 E-Mail Enniq R R. Contains NRC staff 9 M, NRC/NRR Razzaque, NRR, NRC/NRR discussion of to Ennis, Re: VY contents of draft EPU Supplement safety evaluation and 32. draft requests for additional information 14-25 ML052590108 Reddy D K, E-mail, Reddy, 9/15/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of NRR, Re: VY contents of draft EPU SBO Input. safety evaluation 14-26 ML052590060 Reddy D K, E-mail, Reddy, 9/15/2005 E-Mail Pal A N, Contains NRC staff 3 NRC/NRR NRR, to Pal, NRC/NRR discussion of NRR, Re: VY contents of draft EPU SBO Input. safety evaluation 7 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14- 09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
PDP       Accession       Author         Title/       Document Document   Addressee /           Comment         Page No.       Number         Name/      
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                          Count Affiliation:                                          Affiliation 14-27    ML052590121  Scarbrough T      E-mail,      9/15/2005  E-Mail    Ennis R B,    Contains NRC staff      2 G, NRC/NRR      Scarbrough,                            NRC/NRR      discussion regarding NRR, to Ennis,                                        internal review NRR, Re: VY                                          practices EPU Supplement 33.
14-28    ML052590132  Scarbrough T      E-mail,      9/15/2005  E-Mail    Ennis R B,    Contains NRC staff      2 G, NRC/NRR      Scarbrough,                            NRC/NRR      discussion regarding KIPP to Pnnia                                        interna2l reiew NRR, Re: V                                          practices EPU Supplement 33.
14-29    ML052660070    Ennis R B,    E-mail, Ennis,  9/15/2005  E-Mail  Scarbrough T G, Contains NRC staff      2 NRC/NRR        NRR, to                              NRC/NRR      discussion regarding Scarbrough,                                          internal review NRR, Et. Al., Re:                                      practices VY EPU Supplement 33.
8 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)
Affiliation 14-27 ML052590121 Scarbrough T E-mail, 9/15/2005 E-Mail Ennis R B, Contains NRC staff 2 G, NRC/NRR Scarbrough, NRC/NRR discussion regarding NRR, to Ennis, internal review NRR, Re: VY practices EPU Supplement 33.14-28 ML052590132 Scarbrough T E-mail, 9/15/2005 E-Mail Ennis R B, Contains NRC staff 2 G, NRC/NRR Scarbrough, NRC/NRR discussion regarding KIPP to Pnnia interna2l reiew NRR, Re: V practices EPU Supplement 33.14-29 ML052660070 Ennis R B, E-mail, Ennis, 9/15/2005 E-Mail Scarbrough T G, Contains NRC staff 2 NRC/NRR NRR, to NRC/NRR discussion regarding Scarbrough, internal review NRR, Et. Al., Re: practices VY EPU Supplement 33.8 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/
PDP       Accession       Author           Title/     Document Document   Addressee I           Comment         Page No.       Number         Name/      


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                          Affiliation 14-30    ML052640132    Ennis R B,    E-mail, Ennis,  9/16/2005  E-Mail    Imbro E V,    Contains NRC staff      4 NRC/NRR      NRR, to Imbro,                          NRC/NRR      discussion of NRR, Re: VY                                          contents of draft EPU GE Review.                                        safety evaluation and draft requests for additional information 14-31    ML052640165    Grimes C I,  E-mail, Grimes,  9/16/2005  E-Mail    Marsh L B,    Contains NRC staff      4 NRC/NRR    NRR, to Mayfield                        Mayfield M E,  analysis of and Marsh,  MNOR                        NIO!NIO        responses to Re: VY EPU                                          requests for Steam Dryer.                                          information regarding steam dryer review 14-32    ML052640148    Imbro E V,    E-mail, Imbro,  9/16/2005  E-Mail    Ennis R B,    Contains NRC staff      4 NRC/NRR      NRR, to Ennis,                          NRC/NRR        discussion of internal NRR, Re: VY                                          NRC staff scheduling EPU Review.                                          practices and contents of draft safety evaluation 9 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                                     SUPPLEMENT 14 - 09129/05 (Reissued 01/19/06)
Affiliation 14-30 ML052640132 Ennis R B, E-mail, Ennis, 9/16/2005 E-Mail Imbro E V, Contains NRC staff 4 NRC/NRR NRR, to Imbro, NRC/NRR discussion of NRR, Re: VY contents of draft EPU GE Review. safety evaluation and draft requests for additional information 14-31 ML052640165 Grimes C I, E-mail, Grimes, 9/16/2005 E-Mail Marsh L B, Contains NRC staff 4 NRC/NRR NRR, to Mayfield Mayfield M E, analysis of and Marsh, MNOR NIO!NIO responses to Re: VY EPU requests for Steam Dryer. information regarding steam dryer review 14-32 ML052640148 Imbro E V, E-mail, Imbro, 9/16/2005 E-Mail Ennis R B, Contains NRC staff 4 NRC/NRR NRR, to Ennis, NRC/NRR discussion of internal NRR, Re: VY NRC staff scheduling EPU Review. practices and contents of draft safety evaluation 9 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09129/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
PDP     Accession       Author           Title/         Document   Document   Addressee /             Comment             Page No.       Number         Name/    
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                                  Count Affiliation:                                                Affiliation 14-33    ML052640150    Imbro E V,    E-mail, Imbro,      9/16/2005    E-Mail    Ennis R B,    Contains NRC staff            4 NRC/NRR      NRR, to Ennis,                                NRC/NRR        discussion of internal NRR, Re: VY                                                NRC staff scheduling EPU Review.                                                practices and contents of draft safety evaluation 14-34    ML052620274    Ennis R B,    E-mail, Ennis,      9/16/2005    E-Mail  Jones S, Reddy  Contains information          2 NRC/NRR      NRR, to Reddy,                                D, Tatum J,    regarding internal IR' rn, Re1. V I'dI                            1l, 1II'I l ,  Iva La.II actI IVUI11 IV EPU Conference                                                practices Call.
14-35    ML052620295    Ennis R B,    E-mail, Ennis,      9/16/2005    E-Mail    Roberts D J,    Contains NRC staff            4 NRC/NRR    NRR, to Roberts,                              NRC/NRR        discussion of draft NRR, Et. Al., Re:                                            safety evaluation and VY EPU Review.                                                internal NRC staff scheduling practices 14-36    ML052640135    Abdullahi Z, E-mail, Abdullahi,    9/18/2005    E-Mail    Ennis R B,    Contains NRC staff            2 NRC/NRR      NRR, to Ennis,                                NRC/NRR        discussion of draft NRR, Re: VY                                                safety evaluation and EPU GE                                                  internal NRC staff Conference call.                                              scheduling practices 10 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)
Affiliation 14-33 ML052640150 Imbro E V, E-mail, Imbro, 9/16/2005 E-Mail Ennis R B, Contains NRC staff 4 NRC/NRR NRR, to Ennis, NRC/NRR discussion of internal NRR, Re: VY NRC staff scheduling EPU Review. practices and contents of draft safety evaluation 14-34 ML052620274 Ennis R B, E-mail, Ennis, 9/16/2005 E-Mail Jones S, Reddy Contains information 2 NRC/NRR NRR, to Reddy, D, Tatum J, regarding internal IR' rn, Re1. V I'dI 1l, 1II'I l , Iva La.II actI IVUI11 IV EPU Conference practices Call.14-35 ML052620295 Ennis R B, E-mail, Ennis, 9/16/2005 E-Mail Roberts D J, Contains NRC staff 4 NRC/NRR NRR, to Roberts, NRC/NRR discussion of draft NRR, Et. Al., Re: safety evaluation and VY EPU Review. internal NRC staff scheduling practices 14-36 ML052640135 Abdullahi Z, E-mail, Abdullahi, 9/18/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Re: VY safety evaluation and EPU GE internal NRC staff Conference call. scheduling practices 10 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
PDP     Accession       Author         Title/     Document   Document   Addressee /           Comment         Page No.       Number         Name/      
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                          Affiliation 14-37    ML052640141  Alexion T W,  E-mail, Alexion, 9/19/2005    E-Mail    Ennis R B,    Contains NRC staff      2 NRC/NRR      NRR, to Ennis,                          NRC/NRR        discussion regarding NRR, Re: VY                                          internal review EPU Testing.                                          practices 14-38    ML052640122    Ennis R B,    E-mail, Ennis, 9/19/2005    E-Mail    Marsh T B,    Contains information    2 NRC/NRR      NRR, to Marsh,                          NRC/NRR        regarding internal NRR, Re: VY                                          NRC staff scheduling EPU Steam                                            practices Conference Calls.
14-39    ML052640155    Marsh L B,    E-mail, Marsh,  9/19/2005    E-Mail    Alexion T W,    Contains NRC staff      2 NRC/NRR      NRR, to Alexion,                        NRC/NRR        discussion regarding NRR, Re: VY                                          internal review EPU Testing.                                          practices 14-40    ML052640143    Marsh L B,    E-mail, Marsh,  9/19/2005    E-Mail    Ennis R B,    Contains information    2 NRC/NRR      NRR, to Ennis,                          NRC/NRR        regarding internal NRR, Re: VY                                          NRC staff scheduling EPU Conference                                          practices Calls.
11 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)
Affiliation 14-37 ML052640141 Alexion T W, E-mail, Alexion, 9/19/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion regarding NRR, Re: VY internal review EPU Testing. practices 14-38 ML052640122 Ennis R B, E-mail, Ennis, 9/19/2005 E-Mail Marsh T B, Contains information 2 NRC/NRR NRR, to Marsh, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Steam practices Conference Calls.14-39 ML052640155 Marsh L B, E-mail, Marsh, 9/19/2005 E-Mail Alexion T W, Contains NRC staff 2 NRC/NRR NRR, to Alexion, NRC/NRR discussion regarding NRR, Re: VY internal review EPU Testing. practices 14-40 ML052640143 Marsh L B, E-mail, Marsh, 9/19/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Conference practices Calls.11 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
PDP     Accession       Author           Title/     Document   Document   Addressee /           Comment         Page No.       Number         Name/      
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                          Affiliation 14-41    ML052640138    Marsh L B,    E-mail, Marsh,  9/19/2005    E-Mail    Ennis R B,    Contains NRC staff      2 NRC/NRR      NRR, to Ennis,                            NRC/NRR      discussion of NRR, Re: VY                                            responses to EPU Supplement                                          requests for
: 34.                                              additional information regarding steam dryer load 14-42    ML052640160  Thatcher D F, E-mail, Thatcher, 9/19/2005    E-Mail    Alexion T W,    Contains NRC staff      2 NRC/NRR    NRR to Alexion,                            NRC/NRR      discussion regarding NRR, Re: VY                                            internal review EPU Testing.                                          practices 14-43    ML052640415  Akstulewicz F      E-mail      9/20/2005    E-Mail    Holden C F,    Contains NRC staff      3 M, NRC/NRR      Akstulewicz,                            NRC/NRR      analysis of NRR, to Holden,                                          responses to NRR, Et. Al., Re:                                        requests for VY EPU SRXB                                            additional information Status.
14-44    ML052640419    Jones S R,    E-mail Jones,  9/20/2005    E-Mail      Ennis R B,    Contains information    2 NRC/NRR      NRR, to Ennis,                            NRC/NRR      regarding internal NRR, Et. Al., Re:                                        NRC staff scheduling VY EPU                                              practices Conference Call.
12 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)
Affiliation 14-41 ML052640138 Marsh L B, E-mail, Marsh, 9/19/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of NRR, Re: VY responses to EPU Supplement requests for 34. additional information regarding steam dryer load 14-42 ML052640160 Thatcher D F, E-mail, Thatcher, 9/19/2005 E-Mail Alexion T W, Contains NRC staff 2 NRC/NRR NRR to Alexion, NRC/NRR discussion regarding NRR, Re: VY internal review EPU Testing. practices 14-43 ML052640415 Akstulewicz F E-mail 9/20/2005 E-Mail Holden C F, Contains NRC staff 3 M, NRC/NRR Akstulewicz, NRC/NRR analysis of NRR, to Holden, responses to NRR, Et. Al., Re: requests for VY EPU SRXB additional information Status.14-44 ML052640419 Jones S R, E-mail Jones, 9/20/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling VY EPU practices Conference Call.12 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
PDP       Accession       Author           Title/     Document   Document   Addressee /             Comment       Page No.       Number         Name/      
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                          Affiliation 14-45    ML052640424    Reddy D K,    E-mail Reddy,    9/20/2005    E-Mail    Ennis R B,      Contains information    3 NRC/NRR      NRR, to Ennis,                          NRC/NRR        regarding internal NRR, Et. Al., Re:                                        NRC staff scheduling VY EPU                                              practices Conference Call.
14-46    ML052640417    Tatum J E,    E-mail Tatum,    9/20/2005    E-Mail    Ennis R B,      Contains information    2 NRC/NRR      NRR, to Ennis,                          NRC/NRR        regarding internal NRR, Et. Al., Re:                                        NRC staff scheduling V  EPI I                                            nrac-tiacs Conference Call.
14-47    ML052640432    Ennis R B,    E-mail, Ennis,  9/20/2005    E-Mail    Reddy D K,      Contains information    3 NRC/NRR      NRR, to Reddy,                            NRC/NRR        regarding internal NRR, Et. Al., Re:                                        NRC staff scheduling VY EPU                                                practices Conference Call.
14-48    ML052640412    Marsh L B,    E-mail Marsh,    9/21/2005    E-Mail    Boger B A,      Contains information    3 NRC/NRR      NRR, to Boger,                          NRC/NRR        regarding internal NRR, Et. Al., Re:                                        NRC staff scheduling VY EPU SE                                              practices Inputs.                                          _ _
13 of 14


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)
Affiliation 14-45 ML052640424 Reddy D K, E-mail Reddy, 9/20/2005 E-Mail Ennis R B, Contains information 3 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling VY EPU practices Conference Call.14-46 ML052640417 Tatum J E, E-mail Tatum, 9/20/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling V EPI I nrac-tiacs Conference Call.14-47 ML052640432 Ennis R B, E-mail, Ennis, 9/20/2005 E-Mail Reddy D K, Contains information 3 NRC/NRR NRR, to Reddy, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling VY EPU practices Conference Call.14-48 ML052640412 Marsh L B, E-mail Marsh, 9/21/2005 E-Mail Boger B A, Contains information 3 NRC/NRR NRR, to Boger, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling VY EPU SE practices Inputs. _ _13 of 14 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 14 -09/29/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
PDP       Accession       Author         Title/     Document   Document     Addressee /         Comment         Page No.       Number         Name/      
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                          Affiliation 14-49    ML052650195    Ennis R B,    E-mail, Ennis, 9/21/2005    E-Mail    Grimes C I,    Contains information    3 NRC/NRR    NRR, to Grimes,                          NRC/NRR      regarding internal NRR, Re: VY                                          NRC staff scheduling EPU                                              practices Communications.
14-50    ML052650197    Grimes C 1,  E-mail, Grimes, 9/21/2005    E-Mail  Scarbrough T G,  Contains NRC staff      2 NRC/NRR        NRR, to                              NRC/NRR      discussion regarding Scarbrough,                                          internal review NRR, Et A!,Re:                                          practices VY EPU Communications.
14-51    ML052650086    Jones S R,    E-mail, Jones,  9/21/2005    E-Mail      Ennis R B,    Contains NRC staff      2 NRC/NRR      NRR, to Ennis,                          NRC/NRR      recommendations NRR, Re: VY                                          regarding content of EPU License                                          draft safety Condition.                                          evaluation 14 of 14


Date Type Addressee Count Affiliation:
VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - October 31, 2005 Reissued January 19, 20061 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
Affiliation 14-49 ML052650195 Ennis R B, E-mail, Ennis, 9/21/2005 E-Mail Grimes C I, Contains information 3 NRC/NRR NRR, to Grimes, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU practices Communications.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
14-50 ML052650197 Grimes C 1, E-mail, Grimes, 9/21/2005 E-Mail Scarbrough T G, Contains NRC staff 2 NRC/NRR NRR, to NRC/NRR discussion regarding Scarbrough, internal review NRR, Et A!, Re: practices VY EPU Communications.
PDP         Accession           Author                 Title/         Document     Document       Addressee /             Comment         Page No.         Number             Name/          
14-51 ML052650086 Jones S R, E-mail, Jones, 9/21/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR recommendations NRR, Re: VY regarding content of EPU License draft safety Condition.
evaluation 14 of 14 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -October 31, 2005 Reissued January 19, 20061 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information.
Pursuant to 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date        Type          Addressee                              Count Affiliation:                                                        Affiliation 15-01    ML052710076          Ennis R B,        E-mail, Ennis,      9/22/2005      E-Mail      Akstulewicz F      Contains information    2 NRC/NRR                NRR to                                      M, NRC/NRR        concerning NRC Akstulewicz,                                                      Staff scheduling NRR, Re: VY                                                        practices EPU Conference Call.
15-02    ML052650199          Grimes C I,      E-mail, Grimes,      9/22/2005      E-Mail        Ennis R B,      Contains information    2 NRC/NRR          NRR, to Ennis,                                      NRC/NRR        concerning NRC NRR Re: VY                                                        Staff review practices EPU                                                          (Redacted version Communications.                                                      will be made available in Supplement 16) 1The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
1 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-01 ML052710076 Ennis R B, E-mail, Ennis, 9/22/2005 E-Mail Akstulewicz F Contains information 2 NRC/NRR NRR to M, NRC/NRR concerning NRC Akstulewicz, Staff scheduling NRR, Re: VY practices EPU Conference Call.15-02 ML052650199 Grimes C I, E-mail, Grimes, 9/22/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR Re: VY Staff review practices EPU (Redacted version Communications.
PDP     Accession       Author           Title/     Document Document   Addressee /           Comment         Page No.     Number         Name/      
will be made available in Supplement 16)1 The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
1 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                          Affiliation 15-03  ML052710080  Kotzalas M A, E-mail, Kolzalas, 9/22/2005  E-Mail    Ennis R B,    Contains NRC Staff        5 NRC/NRR      NRR, to Ennis,                          NRC/NRR      recommended input NRR, Re: VY                                          to draft SER EPU SBO Input.                                          regarding effect of EPU on station blackout 15-04  ML052710041  Sekerak S P,  E-mail, Sekerak,  9/23/2005  E-Mail      Wu C,      Contains NRC Staff      11 NRC/NRR        NRR, to Wu,                            NRC/NRR      recommended input NRR, Re: VY                                          to draft SER EPU Draft SER                                          regarding effect of Inp. o+
                                          .II 1JtL.                                        =DI I ,- 0DI supports, RPV internals and core support structures, and CRDM pressure boundary housing 15-05  ML052710044  Razzaque M        E-mail,      9/26/2005  E-Mail    Ennis R B,    Contains NRC Staff M, NRC/NRR    Razzaque, NRR,                          NRC/NRR      discussion of draft to Ennis, NRR,                                        RAls concerning Re: VY EPU                                          LBLOCAs, fuel SRXB RAIs                                          storage, and RHR 15-06  ML052710043    Ennis R B,    E-mail, Ennis,  9/27/2005  E-Mail  Razzaque M M,  Contains NRC Staff NRC/NRR          NRR, to                            NRC/NRR      discussion of draft Razzaque, NRR,                                          RAls concerning Re: VY EPU                                          LBLOCAs, fuel SRXB RAls                                          storage, and RHR 2 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 15 - 10/31/05 (Reissued 01/1 9/06)
Affiliation 15-03 ML052710080 Kotzalas M A, E-mail, Kolzalas, 9/22/2005 E-Mail Ennis R B, Contains NRC Staff 5 NRC/NRR NRR, to Ennis, NRC/NRR recommended input NRR, Re: VY to draft SER EPU SBO Input. regarding effect of EPU on station blackout 15-04 ML052710041 Sekerak S P, NRC/NRR E-mail, Sekerak, NRR, to Wu, NRR, Re: VY EPU Draft SER Inp. o+.II 1JtL.9/23/2005 E-Mail Wu C, NRC/NRR Contains NRC Staff recommended input to draft SER regarding effect of=DI I ,- 0DI supports, RPV internals and core support structures, and CRDM pressure boundary housing 1 1 15-05 ML052710044 Razzaque M E-mail, 9/26/2005 E-Mail Ennis R B, Contains NRC Staff M, NRC/NRR Razzaque, NRR, NRC/NRR discussion of draft to Ennis, NRR, RAls concerning Re: VY EPU LBLOCAs, fuel SRXB RAIs storage, and RHR 15-06 ML052710043 Ennis R B, E-mail, Ennis, 9/27/2005 E-Mail Razzaque M M, Contains NRC Staff NRC/NRR NRR, to NRC/NRR discussion of draft Razzaque, NRR, RAls concerning Re: VY EPU LBLOCAs, fuel SRXB RAls storage, and RHR 2 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/1 9/06)PDP Accession Author Title/ Document Document Addressee  
PDP     Accession       Author         Title/       Document Document   Addressee /           Comment           Page No.       Number         Name/      
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                          Affiliation 15-07    ML052710045    Huang T L,    E-mail, Huang,  9/27/2005  E-Mail    Ennis R B,    Contains NRC Staff      2 NRC/NRR      NRR, to Ennis,                          NRC/NRR      discussion of draft NRR, Re: VY                                          RAls concerning EPU SRXB RAls.                                          LBLOCAs, fuel storage, and RHR 15-08    ML052720436    Ennis R B,    E-mail, Ennis,  9/28/2005  E-Mail    Akstulewicz F  Contains information      4 NRC/NRR          NRR, to                            M, NRC/NRR    concerning NRC Akstulewicz,                                        Staff reviewing and NRR, Et. Al., Re:                                      scheduling practices VY EPU SE 15-09    ML052720447    Jones S R,    E-mail, Jones,  9/28/2005  E-Mail    Ennis R B,    Contains information      2 NRC/NRR      NRR, to Ennis,                          NRC/NRR      concerning NRC NRR, Re: VY                                          Staff reviewing and EPU SE Status.                                        scheduling practices 15-10    ML052720444  Kotzalas M A, E-mail, Kotzalas, 9/28/2005  E-Mail    Ennis R B,    Contains information      2 NRC/NRR      NRR, to Ennis,                          NRC/NRR      concerning NRC NRR, Re: VY                                          Staff reviewing and EPU SE Status.                                        scheduling practices 3 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-07 ML052710045 Huang T L, E-mail, Huang, 9/27/2005 E-Mail Ennis R B, Contains NRC Staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Re: VY RAls concerning EPU SRXB RAls. LBLOCAs, fuel storage, and RHR 15-08 ML052720436 Ennis R B, E-mail, Ennis, 9/28/2005 E-Mail Akstulewicz F Contains information 4 NRC/NRR NRR, to M, NRC/NRR concerning NRC Akstulewicz, Staff reviewing and NRR, Et. Al., Re: scheduling practices VY EPU SE 15-09 ML052720447 Jones S R, E-mail, Jones, 9/28/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR, Re: VY Staff reviewing and EPU SE Status. scheduling practices 15-10 ML052720444 Kotzalas M A, E-mail, Kotzalas, 9/28/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR, Re: VY Staff reviewing and EPU SE Status. scheduling practices 3 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/
PDP       Accession       Author         Title/     Document Document   Addressee I           Comment         Page No.       Number         Name/    


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                          Affiliation 15-11    ML052790699  Thatcher D F,    Draft Safety  9/29/2005 Memoranda  Roberts D J,    Contains NRC Staff      18 NRC/NRR/DI    Evaluation Power              Safety  NRC/NRR/DLP      recommended input PM/IPSB        Ascension              Evaluation    M/LPD2      to draft SER Testing for                                          regarding power Vermont Yankee,                                        ascension testing Dated September 10, 2003.
15-12    ML052720443    Fischer D C,  E-mail, Fischer, 9/29/2005  E-Mail    Ennis R B,    Contains information    2 NRC/NRR      NRR, to Ennis,                          NRC/NRR        concerning NRC NRR, Re: VY                                          Staff reviewing and EPU SE Status                                          scheduling practices 15-13    ML052790091      Pal A N,  E-mail, Pal, NRR, 9/29/2005  E-Mail    Ennis R B,    Contains information    2 NRC/NRR      to Ennis, NRR,                          NRC/NRR        concerning NRC Re: VY EPU SE                                          Staff reviewing and Status.                                            scheduling practices 15-14    ML052790087    Pettis R L,  E-mail, Pettis, 9/29/2005  E-Mail    Ennis R B,    Contains information    2 NRC/NRR      NRR, to Ennis,                          NRC/NRR        concerning NRC NRR, Re: VY                                          Staff reviewing and EPU SE Status                                          scheduling practices 15-15    ML052730071  Jenkins R V,  Vermont Yankee:  9/29/2005 Memoranda  Roberts D J,    Contains NRC Staff      15 NRC/NRR/DE    Thermal Power                Safety  NRC/NRR/DLP      recommended input
                            /EEIB    Uprate - Station          Evaluation    M/LPD2        to draft SER Blackout.                                          regarding station blackout 4 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                             SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-11 ML052790699 Thatcher D F, Draft Safety 9/29/2005 Memoranda Roberts D J, Contains NRC Staff 18 NRC/NRR/DI Evaluation Power Safety NRC/NRR/DLP recommended input PM/IPSB Ascension Evaluation M/LPD2 to draft SER Testing for regarding power Vermont Yankee, ascension testing Dated September 10, 2003.15-12 ML052720443 Fischer D C, E-mail, Fischer, 9/29/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR, Re: VY Staff reviewing and EPU SE Status scheduling practices 15-13 ML052790091 Pal A N, E-mail, Pal, NRR, 9/29/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR to Ennis, NRR, NRC/NRR concerning NRC Re: VY EPU SE Staff reviewing and Status. scheduling practices 15-14 ML052790087 Pettis R L, E-mail, Pettis, 9/29/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR, Re: VY Staff reviewing and EPU SE Status scheduling practices 15-15 ML052730071 Jenkins R V, Vermont Yankee: 9/29/2005 Memoranda Roberts D J, Contains NRC Staff 15 NRC/NRR/DE Thermal Power Safety NRC/NRR/DLP recommended input/EEIB Uprate -Station Evaluation M/LPD2 to draft SER Blackout.
PDP     Accession       Author         Title/     Document Document   Addressee I           Comment           Page No.     Number         Name/    
regarding station blackout 4 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                        Affiliation 15-16  ML052790059    Jones S R,    E-mail, Jones, 9/30/2005  E-Mail    Tatum J E,    Contains NRC Staff        2 NRC/NRR      NRR, to Tatum,                        NRC/NRR      discussion of draft NRR, Re: VY                                          license condition EPU License                                          regarding transient Condition.                                        testing 15-17  ML052790061    Jones S R,    E-mail, Jones, 9/30/2005  E-Mail    Tatum J E,    Contains NRC Staff        2 NRC/NRR      NRR, to Tatum,                        NRC/NRR      discussion of draft NRR, Re: VY                                          license condition EPU License                                          regarding transient onnditio.nn                                      testing 15-18  ML052790063    Jones S R,    E-mail, Jones, 9/30/2005  E-Mail    Tatum J E,    Contains NRC Staff      2 NRC/NRR      NRR, to Tatum,                        NRC/NRR        discussion of draft NRR, Re: VY                                          license condition EPU License                                          regarding transient Condition.                                        testing 15-19  ML052790064    Tatum J E,  E-mail, Tatum,  9/30/2005  E-Mail    Jones S R,    Contains NRC Staff      2 NRC/NRR      NRR, to Jones,                        NRC/NRR      discussion of draft NRR, Re: VY                                          license condition EPU License                                          regarding transient Condition.                                        testing 5 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-16 ML052790059 Jones S R, E-mail, Jones, 9/30/2005 E-Mail Tatum J E, Contains NRC Staff 2 NRC/NRR NRR, to Tatum, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient Condition.
PDP       Accession     Author           Title/     Document Document   Addressee /           Comment         Page No.       Number         Name/      
testing 15-17 ML052790061 Jones S R, E-mail, Jones, 9/30/2005 E-Mail Tatum J E, Contains NRC Staff 2 NRC/NRR NRR, to Tatum, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient onnditio.nn testing 15-18 ML052790063 Jones S R, E-mail, Jones, 9/30/2005 E-Mail Tatum J E, Contains NRC Staff 2 NRC/NRR NRR, to Tatum, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient Condition.
testing 15-19 ML052790064 Tatum J E, E-mail, Tatum, 9/30/2005 E-Mail Jones S R, Contains NRC Staff 2 NRC/NRR NRR, to Jones, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient Condition.
testing 5 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                          Affiliation 15-20    ML052790068    Tatum J E,    E-mail, Tatum,  9/30/2005  E-Mail    Jones J R,    Contains NRC Staff      2 NRC/NRR      NRR, to Jones,                          NRC/NRR        discussion of draft NRR, Re: VY                                          license condition EPU License                                          regarding transient Condition.                                          testing 15-21    ML052790066    Tatum J E,    E-mail, Tatum,  9/30/2005  E-Mail    Jones S R,    Contains NRC Staff      2 NRC/NRR      NRR, to Jones,                          NRC/NRR        discussion of draft NRR, Re: WY                                            license condition EPU License                                          regarding transient 15-22    ML052730335    Manoly K A,  Safety Evaluation 9/30/2005 Memoranda  Roberts D J,    Contains NRC Staff      40 NRC/NRR/DE      of Vermont                Safety  NRC/NRR/DLP      recommended input
                        /EMEB      Yankee Nuclear              Evaluation    M/LPD1      to draft SER Power Station,                                        regarding structural License No.                                          and pressure DPR-28 (Docket                                          boundary integrity of No. 50-271),                                        various systems, Technical                                          effect of EPU on Specification                                        condensate and Proposed                                          feedwater system, Change No. 263,                                        and performance of Extended Power                                        safety-related valves Uprate.
6 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-20 ML052790068 Tatum J E, E-mail, Tatum, 9/30/2005 E-Mail Jones J R, Contains NRC Staff 2 NRC/NRR NRR, to Jones, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient Condition.
PDP     Accession       Author           Title/     Document Document   Addressee /           Comment         Page No.       Number         Name/      
testing 15-21 ML052790066 Tatum J E, E-mail, Tatum, 9/30/2005 E-Mail Jones S R, Contains NRC Staff 2 NRC/NRR NRR, to Jones, NRC/NRR discussion of draft NRR, Re: WY license condition EPU License regarding transient 15-22 ML052730335 Manoly K A, Safety Evaluation 9/30/2005 Memoranda Roberts D J, Contains NRC Staff 40 NRC/NRR/DE of Vermont Safety NRC/NRR/DLP recommended input/EMEB Yankee Nuclear Evaluation M/LPD1 to draft SER Power Station, regarding structural License No. and pressure DPR-28 (Docket boundary integrity of No. 50-271), various systems, Technical effect of EPU on Specification condensate and Proposed feedwater system, Change No. 263, and performance of Extended Power safety-related valves Uprate.6 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                          Affiliation 15-23    ML052730219    Dennig R L,  Safety Evaluation 9/30/2005 Memoranda    Roberts D J,  Contains NRC Staff      38 NRC/NRR/DS      Report Input -                      NRC/NRR/DLP      recommended input SA/SPSB        Review of                              M/LPD1      to draft SER Containment                                          regarding Systems and                                          containment system Analysis for the                                      safety Vermont Yankee Nuclear Power Station Extended Power Uprate (TAC IVIC76i) 15-24    ML052710446    Jones S R,  Vermont Yankee    9/30/2005 Memoranda    Roberts D J,  Contains NRC Staff      28 NRC/NRR/DS      EPU SPLB-A                          NRC/NRR/DLP      recommended input SANSPLB        BOP Input.                            M/LPD1      to draft SER regarding balance of plant systems 15-25    ML052790105    Ennis R B,    E-mail, Ennis,  10/1/2005  E-Mail  Scarbrough T G,  Contains NRC Staff      11 NRC/NRR          NRR, to                              NRC/NRR      discussion of draft Scarbrough,                                          license condition NRR, Re: VY                                          regarding potential EPU Steam                                            adverse flow effects Dryer License Conditions.
7 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                           SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-23 ML052730219 Dennig R L, Safety Evaluation 9/30/2005 Memoranda Roberts D J, Contains NRC Staff 38 NRC/NRR/DS Report Input -NRC/NRR/DLP recommended input SA/SPSB Review of M/LPD1 to draft SER Containment regarding Systems and containment system Analysis for the safety Vermont Yankee Nuclear Power Station Extended Power Uprate (TAC IVIC76i)15-24 ML052710446 Jones S R, Vermont Yankee 9/30/2005 Memoranda Roberts D J, Contains NRC Staff 28 NRC/NRR/DS EPU SPLB-A NRC/NRR/DLP recommended input SANSPLB BOP Input. M/LPD1 to draft SER regarding balance of plant systems 15-25 ML052790105 Ennis R B, E-mail, Ennis, 10/1/2005 E-Mail Scarbrough T G, Contains NRC Staff 11 NRC/NRR NRR, to NRC/NRR discussion of draft Scarbrough, license condition NRR, Re: VY regarding potential EPU Steam adverse flow effects Dryer License Conditions.
PDP     Accession       Author         Title/     Document Document   Addressee /           Comment         Page No.     Number         Name/    
7 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date    Type      Addressee                            Count Affiliation:                                      Affiliation 15-26  ML052790121  Akstulewicz F    E-mail,    10/3/2005  E-Mail    Ennis R B,    Contains NRC Staff        2 M, NRC/NRR    Akstulewicz,                        NRC/NRR      discussion of draft NRR, to Ennis,                                      license condition NRR, Re: VY                                        regarding potential EPU SLMCPR.                                        adverse flow effects 15-27  ML052790130    Ennis R B,  E-mail, Ennis, 10/3/2005  E-Mail    Akstulewicz F  Contains NRC Staff      2 NRC/NRR        NRR, to                          M, NRC/NRR    discussion of draft Akstulewicz,                                        license condition NRR, Re: VY                                        regarding potential EPU SLMCPR.                                        adverse flow effects 15-28  ML052790084  Scarbrough T    E-mail,    10/3/2005  E-Mail    Ennis R B,    Contains NRC Staff      2 G, NRC/NRR    Scarbrough,                          NRC/NRR      discussion of draft NRR, to Ennis,                                      license condition NRR, Re: VY                                        regarding potential EPU License                                        adverse flow effects Conditions.
15-29  ML052790050  Scarbrough T    E-mail,    10/3/2005  E-Mail    Ennis R B,    Contains NRC Staff      3 G, NRC/NRR    Scarbrough,                          NRC/NRR      discussion of draft NRR, to Ennis,                                      license condition NRR, Re: VY                                        regarding potential EPU License                                        adverse flow effects Conditions.
8 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-26 ML052790121 Akstulewicz F E-mail, 10/3/2005 E-Mail Ennis R B, Contains NRC Staff 2 M, NRC/NRR Akstulewicz, NRC/NRR discussion of draft NRR, to Ennis, license condition NRR, Re: VY regarding potential EPU SLMCPR. adverse flow effects 15-27 ML052790130 Ennis R B, E-mail, Ennis, 10/3/2005 E-Mail Akstulewicz F Contains NRC Staff 2 NRC/NRR NRR, to M, NRC/NRR discussion of draft Akstulewicz, license condition NRR, Re: VY regarding potential EPU SLMCPR. adverse flow effects 15-28 ML052790084 Scarbrough T E-mail, 10/3/2005 E-Mail Ennis R B, Contains NRC Staff 2 G, NRC/NRR Scarbrough, NRC/NRR discussion of draft NRR, to Ennis, license condition NRR, Re: VY regarding potential EPU License adverse flow effects Conditions.
PDP       Accession       Author           Title/     Document Document     Addressee I         Comment         Page No.       Number         Name/      
15-29 ML052790050 Scarbrough T E-mail, 10/3/2005 E-Mail Ennis R B, Contains NRC Staff 3 G, NRC/NRR Scarbrough, NRC/NRR discussion of draft NRR, to Ennis, license condition NRR, Re: VY regarding potential EPU License adverse flow effects Conditions.
8 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                          Affiliation 15-30    ML052770442    Rubin M P,  Safety Evaluation 10/3/2005 Memoranda    Roberts D J,  Contains NRC Staff      20 NRC/NRR/DS      Report Input              Safety    NRC/NRR/DLP    recommended input SA/SPSB      Concerning the            Evaluation    M/LPD1      to draft SER Risk Evaluation              Report                    regarding risk of the Vermont                                        evaluation Yankee Nuclear Power Station Extended Power Uprate Application (TAC No. MC0761).
15-31    ML052790065    Roberts D J,  E-mail, Roberts, 10/4/2005  E-Mail      Marsh L B,    Contains information    2 NRC/NRR      NRR, to Marsh,                          NRC/NRR      concerning NRC NRR, Et. Al., Re:                                      Staff reviewing and VY EPU License                                          scheduling practices Condition.
15-32    ML052790043  Sheron B W,    E-mail, Sheron,  10/4/2005  E-Mail      Ennis R B,    Contains NRC Staff      2 NRC/NRR      NRR, to Ennis,                          NRC/NRR      discussion of draft NRR, Et. Al., Re:                                      license condition VY EPU License                                          regarding risk-Conditions.                                          informed evaluation of requested containment overpressure credit 9 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-30 ML052770442 Rubin M P, Safety Evaluation 10/3/2005 Memoranda Roberts D J, Contains NRC Staff 20 NRC/NRR/DS Report Input Safety NRC/NRR/DLP recommended input SA/SPSB Concerning the Evaluation M/LPD1 to draft SER Risk Evaluation Report regarding risk of the Vermont evaluation Yankee Nuclear Power Station Extended Power Uprate Application (TAC No. MC0761).15-31 ML052790065 Roberts D J, E-mail, Roberts, 10/4/2005 E-Mail Marsh L B, Contains information 2 NRC/NRR NRR, to Marsh, NRC/NRR concerning NRC NRR, Et. Al., Re: Staff reviewing and VY EPU License scheduling practices Condition.
PDP     Accession       Author         Title/       Document Document   Addressee I           Comment         Page No.       Number         Name/      
15-32 ML052790043 Sheron B W, E-mail, Sheron, 10/4/2005 E-Mail Ennis R B, Contains NRC Staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Et. Al., Re: license condition VY EPU License regarding risk-Conditions.
informed evaluation of requested containment overpressure credit 9 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                          Affiliation 15-33    ML052790132    Ennis R B,    E-mail, Ennis,  10/5/2005  E-Mail    Stutzke M A,    Contains NRC Staff      6 NRC/NRR      NRR, to Stutzke,                        NRC/NRR        discussion of draft NRR, Re: VY                                          license condition EPU License                                          regarding risk-Condition.                                          informed evaluation of requested containment overpressure credit 15-34    ML052790048    Marsh L B,    E-mail, Marsh,  10/5/2005  E-Mail    Ennis R B,    Contains NRC Staff      3 NRr/NRR        NRR, Ennis                            NRCNRR        evaluations and NRR, Et. AL., Re:                                      recommendations VY EPU License                                          concerning press Conditions.                                          release concerning issuing of license conditions 15-35  ML052790038    Stutzke M A,  E-mail, Stutzke, 10/5/2005  E-Mail    Ennis R B,    Contains NRC Staff        4 NRC/NRR      NRR, to Ennis,                          NRC/NRR      discussion of draft NRR, Re: VY                                          license condition EPU License                                          regarding risk-Conditions.                                        informed evaluation of requested containment overpressure credit 10 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-33 ML052790132 Ennis R B, E-mail, Ennis, 10/5/2005 E-Mail Stutzke M A, Contains NRC Staff 6 NRC/NRR NRR, to Stutzke, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding risk-Condition.
PDP     Accession       Author           Title/       Document Document   Addressee /                   Comment               Page No.     Number         Name/      
informed evaluation of requested containment overpressure credit 15-34 ML052790048 Marsh L B, E-mail, Marsh, 10/5/2005 E-Mail Ennis R B, Contains NRC Staff 3 NRr/NRR NRR, Ennis NRCNRR evaluations and NRR, Et. AL., Re: recommendations VY EPU License concerning press Conditions.
release concerning issuing of license conditions 15-35 ML052790038 Stutzke M A, E-mail, Stutzke, 10/5/2005 E-Mail Ennis R B, Contains NRC Staff 4 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding risk-Conditions.
informed evaluation of requested containment overpressure credit 10 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                                          Count Affiliation:                                          Affiliation 15-36  ML052790039  Stutzke M A,    E-mail, Stutzke, 10/5/2005  E-Mail    Ennis R B,          Contains NRC Staff              3 NRC/NRR      NRR, to Ennis,                          NRC/NRR            discussion of draft NRR, Re: VY                                                license condition EPU License                                                regarding risk-Conditions.                                              informed evaluation of requested containment overpressure credit 15-37  ML052850136  Scarbrough T        E-mail,      10/7/2005  E-Mail    Ennis R B,          Contains NRC Staff              3 GJI                                          '  41.uI I'dI II a I Ug NI IIICIrIIIo.AeU IInIJUL NRR, to Ennis,                                              to draft SER NRR, Re: VY                                                regarding inspection EPU Inspections.                                            follow-up items 15-38  ML052850151    Ennis R B,      E-mail, Ennis,  10/8/2005  E-Mail    Knutson E C,        Contains NRC Staff              8 NRC/NRR      NRR, to Sienel                          Sienel B E,        recommended input and Knutson,                          NRC/RGN-I          to draft SER RGN-1, Re: VY                                              regarding inspection
_                      EPU Inspections.                                            follow-up items 11 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                                 SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-36 ML052790039 Stutzke M A, E-mail, Stutzke, 10/5/2005 E-Mail Ennis R B, Contains NRC Staff 3 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding risk-Conditions.
PDP     Accession       Author           Title/     Document   Document     Addressee /           Comment         Page No.       Number         Name/      
informed evaluation of requested containment overpressure credit 15-37 ML052850136 Scarbrough T E-mail, 10/7/2005 E-Mail Ennis R B, Contains NRC Staff 3 GJI ' 41.uI I'dI II a I Ug NI IIIC IrIIIo.AeU IInIJUL NRR, to Ennis, to draft SER NRR, Re: VY regarding inspection EPU Inspections.
follow-up items 15-38 ML052850151 Ennis R B, E-mail, Ennis, 10/8/2005 E-Mail Knutson E C, Contains NRC Staff 8 NRC/NRR NRR, to Sienel Sienel B E, recommended input and Knutson, NRC/RGN-I to draft SER RGN-1, Re: VY regarding inspection
_ EPU Inspections.
follow-up items 11 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type        Addressee                            Count Affiliation:                                            Affiliation 15-39    ML052850051  Akstulewicz F Safety Evaluation 10/11/2005 Memoranda    Roberts D J,  Contains NRC Staff      64 M,          Input for                Safety    NRC/NRR/DLP      recommended input NRC/NRR/DS    Extended Power              Evaluation    M/LPD1      to draft SER SA/SRXB      Uprate Vermont                                          regarding ECCS Yankee Nuclear                                            LOCA and Methods Power Station                                          Evaluation (TAC No.
MC0761) Section 2.8.7 and Revised Section 15-40    ML052900197    Ennis R B,    E-mail, Ennis,  10/14/2005  E-Mail      Reddy D K,    Contains NRC Staff        4 NRC/NRR      NRR, to Reddy,                            NRC/NRR      analysis of licensee's NRR, Et. Al., Re:                                        proposed VY EPU                                              modification of draft Conference Call.                                          license condition regarding transient testing 12 of 13


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)
Affiliation 15-39 ML052850051 Akstulewicz F Safety Evaluation 10/11/2005 Memoranda Roberts D J, Contains NRC Staff 64 M, Input for Safety NRC/NRR/DLP recommended input NRC/NRR/DS Extended Power Evaluation M/LPD1 to draft SER SA/SRXB Uprate Vermont regarding ECCS Yankee Nuclear LOCA and Methods Power Station Evaluation (TAC No.MC0761) Section 2.8.7 and Revised Section 15-40 ML052900197 Ennis R B, E-mail, Ennis, 10/14/2005 E-Mail Reddy D K, Contains NRC Staff 4 NRC/NRR NRR, to Reddy, NRC/NRR analysis of licensee's NRR, Et. Al., Re: proposed VY EPU modification of draft Conference Call. license condition regarding transient testing 12 of 13 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 15 -10/31/05 (Reissued 01/19/06)PDP Accession Author Title/ Document Document Addressee  
PDP       Accession       Author         Title/       Document   Document   Addressee /           Comment         Page No.       Number         Name/      
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                          Affiliation 15-41    ML052900188    Jones S R,    E-mail, Jones,  10/14/2005  E-Mail    Reddy D K,    Contains NRC Staff        3 NRC/NRR    NRR, to Reddy,                            NRC/NRR      analysis of licensee's NRR, Et. Al., Re:                                      proposed VY EPU License                                          modification of draft Condition.                                            license condition regarding transient testing 15-42    ML052900185  Stutzke M A,  E-mail, Stutzke, 10/14/2005  E-Mail    Rubin M P,    Contains NRC Staff      3 NRC/NRR      NRR, to Rubin,                          NRC/NRR      analysis of licensee's EPU                                              containment Containment                                          overpressure credit Overpressure.                                          (Redacted version will be made available in Supplement 16) 15-43    ML052900195    Tatum J E,    E-mail,Tatum,  10/14/2005  E-Mail    Reddy D K,    Contains NRC Staff      4 NRC/NRR      NRR, to Reddy,                          NRC/NRR      analysis of licensee's NRR, Et. Al., Re:                                        proposed VY EPU                                              modification of draft Conference Call.                                        license condition regarding transient testing 13 of 13


Date Type Addressee Count Affiliation:
VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 16 - November 14,2005 Reissued January 19, 2006' Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
Affiliation 15-41 ML052900188 Jones S R, E-mail, Jones, 10/14/2005 E-Mail Reddy D K, Contains NRC Staff 3 NRC/NRR NRR, to Reddy, NRC/NRR analysis of licensee's NRR, Et. Al., Re: proposed VY EPU License modification of draft Condition.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
license condition regarding transient testing 15-42 ML052900185 Stutzke M A, E-mail, Stutzke, 10/14/2005 E-Mail Rubin M P, Contains NRC Staff 3 NRC/NRR NRR, to Rubin, NRC/NRR analysis of licensee's EPU containment Containment overpressure credit Overpressure. (Redacted version will be made available in Supplement 16)15-43 ML052900195 Tatum J E, E-mail,Tatum, 10/14/2005 E-Mail Reddy D K, Contains NRC Staff 4 NRC/NRR NRR, to Reddy, NRC/NRR analysis of licensee's NRR, Et. Al., Re: proposed VY EPU modification of draft Conference Call. license condition regarding transient testing 13 of 13 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 16 -November 14,2005 Reissued January 19, 2006'Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information.
PDP         Accession           Author               Title/         Document     Document       Addressee I             Comment         Page No.         Number             Name/          
Pursuant to 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/


== Description:==
== Description:==
Date          Type        Addressee                              Count Affiliation:                                                        Affiliation 16-01    ML053080208          Ennis R B,          E-mail, Ennis,    10/27/2005      E-Mail,    Richards S A,      Contains NRC Staff      38 NRC/NRR                NRR, to                      Slides and      NRC/NRR          recommendations Richards, NRR,                    Viewgraphs                        and discussion of Et. Al., Re: VY                                                    Staff presentation to EPU ACRS                                                        the ACRS Presentation.
16-02    ML053080206        Anderson C              E-mail,          11/2/2005      E-Mail        Ennis R B,      Contains NRC Staff      3 J, NRC/RGN-        Anderson, RGN-                                      NRC/NRR          discussion of I          I, to Ennis, NRR,                                                    regional inspector's Re: VY EPU                                                      comments on Steam Dryer.                                                      preliminary results of VY steam dryer inspection
                ' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
1 of 2


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS               SUPPLEMENT 16 - NOVEMBER 14,2005 (Reissued January 19, 2006)
Affiliation 16-01 ML053080208 Ennis R B, E-mail, Ennis, 10/27/2005 E-Mail, Richards S A, Contains NRC Staff 38 NRC/NRR NRR, to Slides and NRC/NRR recommendations Richards, NRR, Viewgraphs and discussion of Et. Al., Re: VY Staff presentation to EPU ACRS the ACRS Presentation.
PDP     Accession     Author           Title/       Document Document     Addressee I         Comment         Page No.       Number         Name/      
16-02 ML053080206 Anderson C E-mail, 11/2/2005 E-Mail Ennis R B, Contains NRC Staff 3 J, NRC/RGN- Anderson, RGN- NRC/NRR discussion of I I, to Ennis, NRR, regional inspector's Re: VY EPU comments on Steam Dryer. preliminary results of VY steam dryer inspection
' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
1 of 2 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 16 -NOVEMBER 14,2005 (Reissued January 19, 2006)PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                            Affiliation 16-03    ML053080203    Ennis R B,    E-mail, Ennis,  11/2/2005  E-Mail  Scarbrough T G, Contains NRC            3 NRC/NRR          NRR, to                                NRC/NRR      regional inspector's Scarbrough,                                          comments on NRR, Et. AL., Re:                                      preliminary results of VY EPU Steam                                          VY steam dryer Dryer.                                            inspection 16-04    ML053080204    Ennis R B,    E-mail, Ennis,  11/2/2005  E-Mail  Scarbrough T G, Contains regional        5 NRC/NRR          NRR, to                                NRC/NRR      inspector's Scarbrough,                                          comments on NRR, Re: VY                                          preliminary results of FPU Steam                                            \Y steam dryer Dryer.                                            inspection 16-05    ML053120102    Ennis R B,    E-mail, Ennis,  11/3/2005  E-Mail,    Jones S R,  Contains NRC Staff      19 NRC/NRR      NRR, to Jones,                Letter      NRC/NRR      recommendations NRR, Et. Al., Re:                                      and discussion of VY EPU                                              Staff presentation to Supplement 41.                                        the ACRS (Non-privileged material (Entergy's Supplement 41) available at ML053120378) 2 of 2


Date Type Addressee Count Affiliation:
VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 17 - November 28, 2005 Reissued January 19, 20061 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
Affiliation 16-03 ML053080203 Ennis R B, E-mail, Ennis, 11/2/2005 E-Mail Scarbrough T G, Contains NRC 3 NRC/NRR NRR, to NRC/NRR regional inspector's Scarbrough, comments on NRR, Et. AL., Re: preliminary results of VY EPU Steam VY steam dryer Dryer. inspection 16-04 ML053080204 Ennis R B, E-mail, Ennis, 11/2/2005 E-Mail Scarbrough T G, Contains regional 5 NRC/NRR NRR, to NRC/NRR inspector's Scarbrough, comments on NRR, Re: VY preliminary results of FPU Steam \Y steam dryer Dryer. inspection 16-05 ML053120102 Ennis R B, E-mail, Ennis, 11/3/2005 E-Mail, Jones S R, Contains NRC Staff 19 NRC/NRR NRR, to Jones, Letter NRC/NRR recommendations NRR, Et. Al., Re: and discussion of VY EPU Staff presentation to Supplement
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
: 41. the ACRS (Non-privileged material (Entergy's Supplement 41)available at ML053120378) 2 of 2 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 17 -November 28, 2005 Reissued January 19, 20061 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information.
PDP       Accession             Author               Title/         Document     Document       Addressee /             Comment       Page No.         Number             Name/          
Pursuant to 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date        Type          Addressee                              Count Affiliation:                                                        Affiliation 17-01    ML053180027          Ennis R B,        E-mail, Ennis,      11/3/2005      E-Mail      Scarbrough T G,    Contains NRC Staff    32 NRC/NRR              NRR, to                                        NRC/NRR          discussion Scarbrough,                                                        concerning results of NRR, Et. Al., Re:                                                    VY steam dryer VY EPU Steam                                                        inspection.
Dryer                                                        Redacted version (factual information) will be made available for Supplement 18
                ' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
1 of 2


Date Type Addressee Count Affiliation:
PRIVILEGE LOG - DELIBERATIVE PROCESS                               SUPPLEMENT 17 11/28/05 (Reissued 01/1 9106)       1W PDP       Accession     Author         Title/       Document Document     Addressee I         Comment           Page No.       Number         Name/    
Affiliation 17-01 ML053180027 Ennis R B, E-mail, Ennis, 11/3/2005 E-Mail Scarbrough T G, Contains NRC Staff 32 NRC/NRR NRR, to NRC/NRR discussion Scarbrough, concerning results of NRR, Et. Al., Re: VY steam dryer VY EPU Steam inspection.
Dryer Redacted version (factual information) will be made available for Supplement 18' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
1 of 2 PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 17 11/28/05 (Reissued 01/1 9106)1W PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type        Addressee                            Count Affiliation:                                          Affiliation 17-02    ML053180029    White J R,    E-mail, White,  11/3/2005  E-Mail      Ennis R B,  Contains NRC Staff        30 NRC/RGN-1    RGN-1, to Ennis,                        NRC/NRR      discussion NRR, Re: VY                                          concerning results of EPU Steam                                          VY steam dryer Dryer.                                            inspection.
Redacted version (factual information) will be made available for Supplement 18 2 of 2


Date Type Addressee Count Affiliation:
VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 18 - December 12,2005 Reissued January 19, 2006' Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
Affiliation 17-02 ML053180029 White J R, E-mail, White, 11/3/2005 E-Mail Ennis R B, Contains NRC Staff 30 NRC/RGN-1 RGN-1, to Ennis, NRC/NRR discussion NRR, Re: VY concerning results of EPU Steam VY steam dryer Dryer. inspection.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
Redacted version (factual information) will be made available for Supplement 18 2 of 2 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 18 -December 12,2005 Reissued January 19, 2006'Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information.
PDP         Accession           Author               Title/         Document     Document       Addressee /             Comment         Page No.         Number             Name/          
Pursuant to 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date        Type        Addressee                                Count Affiliation:                                                        Affiliation 18-01    ML053320396        Stutzke M A,      E-mail, Stutzke,    11/21/2005    E-Mail        Ennis R B,      Contains NRC Staff        4 NRC/NRR          NRR, to Ennis,                                    NRC/NRR        member's proposed NRR, Re: VY                                                      RAls regarding EPU                                                        Entergy's probabilistic Supplements 38                                                      risk analysis of and 39.                                                      containment overpressure (Note:
final version of RAls available at ML053260427)
                ' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
1 of 2


Date Type Addressee Count Affiliation:
u PRIVILEGE LOG - DELIBERATIVE PROCESS                             SUPPLEMENT 18 - 12/12/05 (Reissued 01/19/06)     It PDP     Accession     Author         Title/     Document   Document   Addressee /         Comment           Page No.     Number         Name/    
Affiliation 18-01 ML053320396 Stutzke M A, E-mail, Stutzke, 11/21/2005 E-Mail Ennis R B, Contains NRC Staff 4 NRC/NRR NRR, to Ennis, NRC/NRR member's proposed NRR, Re: VY RAls regarding EPU Entergy's probabilistic Supplements 38 risk analysis of and 39. containment overpressure (Note: final version of RAls available at ML053260427)
' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.
1 of 2 u PRIVILEGE LOG -DELIBERATIVE PROCESS SUPPLEMENT 18 -12/12/05 (Reissued 01/19/06)It PDP Accession Author Title/ Document Document Addressee  
/ Comment Page No. Number Name/


== Description:==
== Description:==
Date      Type      Addressee                            Count Affiliation:                                        Affiliation 18-02  ML053320402    Reddy D K,  E-mail, Reddy, 11/22/2005  E-Mail    Ennis R B,  Contains NRC Staff        9 NRC/NRR      NRR, to Ennis,                        NRC/NRR      member's proposed NRR, Re: VY                                        revisions to Sections EPU SE                                          2.5.4.4 (Condensate Revision.                                        and Feedwater System) and 2.12 (Power Ascension Testing: BOP Systems Testing Review) of the Draft Safety Evaluation 2 of 2
I 0V UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
                                                      )
ENTERGY NUCLEAR VERMONT YANKEE                            Docket No. 50-271 -OLA LLC and ENTERGY NUCLEAR OPERATIONS, INC.                                        ASLBP No. 04-832-02-OLA (Vermont Yankee Nuclear Power Station)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing letter from Jason C. Zorn, Counsel for NRC Staff, to the Atomic Safety and Licensing Board, dated January 19, 2006, responding to the Licensing Board's December 21, 2005, Order, together with attachments, in the captioned proceeding have been served on the following. Service has been performed by deposit in the U.S. Mail, First Class; through electronic mail, with copies to follow by deposit in the NRC's internal mail system (as indicated by a single asterisk); or through electronic mail, with copies to follow by deposit in the U.S. Mail, First Class (as indicated by two asterisks), this 19t day of January, 2006.
Alex S. Karlin, Chair*                            Dr. Anthony J. Baratta*
Administrative Judge                              Administrative Judge Atomic Safety and Licensing Board Panel            Atomic Safety and Licensing Board Panel Mail Stop T-3F23                                  Mail Stop T-3F23 U.S. Nuclear Regulatory Commission                U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                          Washington, DC 20555-0001 (E-mail: ask2@nrc.gov)                            (E-mail: ajb5@nrc.gov)
Lester S. Rubenstein**                            Office of the Secretary*
Administrative Judge                              ATTN: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel            Mail Stop: 0-1 6C1 4760 East Country Villa Drive                      U.S. Nuclear Regulatory Commission Tucson, AZ 85718                                  Washington, DC 20555-0001 (E-mail: lesrrr@comcast.net)                      (E-mail: HEARINGDOCKET@nrc.gov)
Office of Commission Appellate                    John M. Fulton, Esq.
Adjudication*                                      Assistant General Counsel Mail Stop: O-16C1                                  Entergy Nuclear Operations, Inc.
U.S. Nuclear Regulatory Commission                440 Hamilton Avenue Washington, DC 20555-0001                          White Plains, NY 10601


Date Type Addressee Count Affiliation:
I 1...
Affiliation 18-02 ML053320402 Reddy D K, E-mail, Reddy, 11/22/2005 E-Mail Ennis R B, Contains NRC Staff 9 NRC/NRR NRR, to Ennis, NRC/NRR member's proposed NRR, Re: VY revisions to Sections EPU SE 2.5.4.4 (Condensate Revision.
Jay E. Silberg, Esq.**                 Raymond Shadis**
and Feedwater System) and 2.12 (Power Ascension Testing: BOP Systems Testing Review) of the Draft Safety Evaluation 2 of 2 I 0V UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.(Vermont Yankee Nuclear Power Station))Docket No. 50-271 -OLA ASLBP No. 04-832-02-OLA CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing letter from Jason C. Zorn, Counsel for NRC Staff, to the Atomic Safety and Licensing Board, dated January 19, 2006, responding to the Licensing Board's December 21, 2005, Order, together with attachments, in the captioned proceeding have been served on the following.
Matias Travieso-Diaz, Esq.**           Staff Technical Advisor Pillsbury Winthrop Shaw Pittman, LLP   New England Coalition 2300 N St., NW                         P.O. Box 98 Washington, DC 20037-1128               Edgecomb, ME 04556 (E-mail: jay.silberg @pillsburylaw.com  (E-mail: shadisQprexar.com matias.travieso-diaz ©pillsburylaw.com) shadis ©ime.net)
Service has been performed by deposit in the U.S. Mail, First Class; through electronic mail, with copies to follow by deposit in the NRC's internal mail system (as indicated by a single asterisk);
Sarah Hofmann, Esq.**                   Anthony Z. Roisman, Esq.**
or through electronic mail, with copies to follow by deposit in the U.S. Mail, First Class (as indicated by two asterisks), this 19t day of January, 2006.Alex S. Karlin, Chair*Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: ask2@nrc.gov)
Special Counsel                         National Legal Scholars Law Firm Department of Public Service           84 East Thetford Rd.
Lester S. Rubenstein**
112 State Street - Drawer 20           Lyme, NH 03768 Montpelier, VT 05620-2601               (E-mail:
Administrative Judge Atomic Safety and Licensing Board Panel 4760 East Country Villa Drive Tucson, AZ 85718 (E-mail: lesrrr@comcast.net)
(E-mail: sarah.hofmann@state.vt.us)    aroisman @nationallegalscholars.com)
Office of Commission Appellate Adjudication*
Jonathan M. Rund, Esq.*                 Jared Lindsay, Esq.*
Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dr. Anthony J. Baratta*Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: ajb5@nrc.gov)
Law Clerk                              Law Clerk Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23                       Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission      U.S. Nuclear Regulatory Commission Washington, DC 20555-0001              Washington, DC 20555-0001 (E-mail: imr3@nrc.pov)                 (E-mail: iilSnrc.aov)
Office of the Secretary*
ATTN: Rulemaking and Adjudications Staff Mail Stop: 0-1 6C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: HEARINGDOCKET@nrc.gov)
John M. Fulton, Esq.Assistant General Counsel Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 I ...1 Jay E. Silberg, Esq.**Matias Travieso-Diaz, Esq.**Pillsbury Winthrop Shaw Pittman, LLP 2300 N St., NW Washington, DC 20037-1128 (E-mail: jay.silberg  
@ pillsburylaw.com matias.travieso-diaz  
© pillsburylaw.com)
Sarah Hofmann, Esq.**Special Counsel Department of Public Service 112 State Street -Drawer 20 Montpelier, VT 05620-2601 (E-mail: sarah.hofmann@state.vt.us)
Jonathan M. Rund, Esq.*Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: imr3@nrc.pov)
Raymond Shadis**Staff Technical Advisor New England Coalition P.O. Box 98 Edgecomb, ME 04556 (E-mail: shadisQprexar.com shadis © ime.net)Anthony Z. Roisman, Esq.**National Legal Scholars Law Firm 84 East Thetford Rd.Lyme, NH 03768 (E-mail: aroisman @ nationallegalscholars.com)
Jared Lindsay, Esq.*Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: iilSnrc.aov)
Jasoh C. Zorn Counsel for NRC Staff}}
Jasoh C. Zorn Counsel for NRC Staff}}

Revision as of 23:57, 23 November 2019

2006/01/19-Vermont Yankee - Letter from Jason C. Zorn to Administrative Judges Responding to the Licensing Board'S Memorandum and Order (Ruling on Deliberative Process Privilege Claims), Dated December 21, 2005
ML060250472
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/19/2006
From: Zorn J
NRC/OGC
To: Anthony Baratta, Karlin A, Rubenstein L
Atomic Safety and Licensing Board Panel
Byrdsong A T
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 11083
Download: ML060250472 (54)


Text

vJ--

UNITED STATES 7D,--

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 19, 2006 OFFICE OF THE GENERAL COUNSEL Administrative Judge Alex S. Karlin, Chair Administrative Judge Lester S. Rubenstein Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission 4760 East Country Villa Drive Mail Stop: T-3F23 Tucson, AZ 85718 Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station)

Docket No. 50-271 -OLA

Dear Administrative Judges:

On December 21, 2005, the Atomic Safety and Licensing Board issued its "Memorandum and Order (Ruling on Deliberative Process Privilege Claims)" ("Order"),

concerning the State of Vermont Department of Public Service's ("DPS") two Motions to Compel Production of Certain NRC Staff ("Staff") Documents, filed on August 31, 2005, and September 29, 2005, respectively. In the Order, the Board directed the Staff to resubmit its deliberative process privilege logs filed between September 6, 2005, and December 21, 2005, under procedures outlined by the Board, including "the name and job title of the most senior person who made the decision to withhold the document and assert the [deliberative process]

privilege." In accordance with the Board's Order, the Staff submits the enclosed documents concerning its claim of the deliberative process privilege for the documents at issue.

Jason C. Zorn Counsel for NRC Staff

Enclosures:

Affidavit of Catherine Haney Deliberative Process Privilege Logs (Supplements 13 - 18) cc: Service List

I _W -

January 18, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE ) Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 04-832-02-OLA (Vermont Yankee Nuclear Power Station) )

AFFIDAVIT OF CATHERINE HANEY I, Catherine Haney, being first duly sworn, do hereby state as follows:

1. I am employed as the Director of the Division of Operating Reactor Licensing

("DORL") in the Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation ("NRR"). My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Vermont Yankee Nuclear Power Station Extended Power Uprate ("EPU")

license amendment application.

2. During the course of its review and evaluation of the EPU license amendment application, the NRC Staff has generated or used documents that Staff members under my supervision have identified as privileged because the documents contained predecisional information related to the Staff's deliberative process. Although the identity of those documents has been disclosed during a document review process conducted as part of this proceeding, the documents themselves have been withheld in accordance with 10 C.F.R. § 2.390(a)(5) and NRC Management Directive 3.4.
3. I am aware that the Atomic Safety and Licensing Board ("Board") ordered the Staff to resubmit privilege logs that it had filed between September 6, 2005, and December 21,

2 2005, including the name and job title of a senior individual who has decided to withhold documents identified in those logs.

4. The total number of privileged documents identified in the privilege logs filed from September 6, 2005, to December 21, 2005, is 141. Of those, 40 have previously been reviewed and withheld by myself or my predecessor, Ledyard B. Marsh. Further, those 101 documents had previously been reviewed by another person within NRR with less senior responsibilities. Thus, the Board's December 21, 2005, Order applies to a total of 101 documents.
5. I have personally reviewed each of the 101 documents in question, and have determined, in accordance with the guidance contained in Management Directive 3.4, that they contain predecisional information concerning the Staff's review of the EPU application. All of the documents contain the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary to the Staff's review of the pending EPU application.
6. Further, I have determined that disclosure of the 101 documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclose of their internal discussions on an unresolved issue would serve to chill all future deliberations and would interfere with our ability to engage in a free exchange of opinions and analyses prior to publishing our final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
7. Accordingly, I formally invoke the deliberative process privilege with respect to

Tr~ F, 3

each of the 101 documents affected by the Board's December 21, 2005, Order.

8. I hereby certify that the foregoing is true and complete to the best of my knowledge, information and belief.

Cn /

Catherine Haneyv Subscribed and sworn to before me this 18t day of January, 2006.

(_ \9(t

  • 7 *LI

) t~

Mntn Mt Plihinu:

My commission expires: VC 1h X 9 7 CIRCE E. MARTIN NOTARY PUBLIC STATE OF MARYLAND My Commission Expires March 1, 2007

VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 - September 6, 2005 Reissued January 19, 2006' Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052230210 Razzaque M M, E-mail Razzaque, 8/10/2005 E-Mail Ennis R B, Contains draft 3 NRC/NRR NRR, to Ennis, NRR NRC/NRR requests for Re: VY EPU RAls. information regarUin lthe the effect of the EPU on new and spent fuel storage 1 The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that the thirteen documents in this privilege log that have been shaded in grey should be withheld from public disclosure under the deliberative process privilege. For those twenty-five documents not shaded in grey, Ledyard B. Marsh, the previous Director of the Division of Licensing and Project Management, had made the decision to withhold those documents under the deliberative process privilege. See NRC Staff's Answer to Vermont Department of Public Service's Second Motion to Compel at 10-1 1.

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052230209 Razzaque M M, E-mail Razzaque, 8/10/2005 E-Mail Ennis R B, Contains draft 3 NRC/NRR NRR, to Ennis, NRR, NRC/NRR requests for Re: VY EPU RAls. information regarding single loop operation of shutdown cooling and clarification of terms in previous responses to RAls ML052230204 Reddy D K- F-mai! RPddy, NRR, 8!10200o5 F-Mai! Ennis R R- Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAls. responses to RAls regarding stability and reliability of condensate and feedwater system ML052310065 Ennis R' B, E-mail Ennis, NRR, 8/15/2005 E-Mail i Pal A N, Contains staff 2 iNRC/NRR .: toPal,

6 NRR, Re: VY: NRC/NRR recommendations EPU SBO Response. to draft safety evaluation regarding station
_:___

_ ____

_ ___

_ _ __ __ _ _ _ _ _ _ _ _ _ __ __ -__ ___ ___ __ __ __ _ __ _ _  : ___ ___ ___ __ blacko ut an alysis

VI PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052310072 Jacobson J,  : E-mail Jacobson, 8/15/2005 E-Mail Ennis R, Pal A, Contains staff 2 NRC/NRR NRR, To Ennis, NRC/NRR recommendations NRR,:Re: VY EPU to draft safety SBQ Response. evaluation regarding station

______________blackout analysis _ _ _ _

ML052340120 Ennis R 1B, E-mail Ennis,. NRR, 8/17/2005 :E-Mail- .:Pal:A N, I Contains: 9 uNRC/NRR' l00 l to:Pal and:1 :. :. 'Razzaque M M, information Razzaque,'NRR, Re; NRC/NRR-. . regarding NRC's VY EPU RAls--. staff's internal scheduling practices and several pages of previously disclosed requests for additional information ML052340040 Pal A N, E-mail.Pal, NRR, to 8/17/2005 E-Mail : Ennis R B3, Contains NRC/NRR/ADPT Ennis, NRR,, Re: VY NRC/NRR information EPU. RlAs. regarding NRC's staff's internal scheduling

__ _ _ _'_'_ ___ _.:

___ ______ ______ ______ _ _:.: i:.d

-_. p ra c t i c e s

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052340037 Ennis R B, E-mail Ennis, NRR, 8/18/2005 E-Mail Pal-A N, Contains 2 NRC/NRR/ADPT to Razzaque and Razzaque M M, information Pal, NRR, Re: VY NRC/NRR/ADP regarding NRC's EPU Conference: T staff's internal Call. scheduling

_________-___ practices ML052340101 Ennis R B, E-mail Ennis, NRR, 8/18/2005 E-Mail Reddy D K, Contains draft 5 NRC/NRR to Reddy, NRR, Re: NRC/NRR requests for VY EPU RAls. additional information reaardina condensate and feedwater system ML052340038 Razzaque M M, E-mail Razzaque, 8/18/2005 E-Mail Ennis R B, Contains 2 NRC/NRR NRR,^to Ennis, NRR NRC/NRR information Re:VY EPU regarding NRC's Conference CAll. staff's internal scheduling

__ _ __ __ __ _ __ __ __ _ _________

_______________ _ S _ _ p ra ctices

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06) ,1' Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052310075 Reddy D K, E-mail Reddy, NRR, 8/18/2005 E-Mail Ennis R B, Contains staff 5 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAls. response to request for additional information regarding condensate and feedwater system ML052340089 Reddy D K, E-mail Reddy, NRR, 8/18/2005 E-Mail Ennis R B, Contains staff 5 NRr/NRR to Ennis, NRR, Re: discussion of VY EPU RAls. response to request for additional information regarding condensate and feedwater system ML052340108 Thomas G, E-mail Thomas, 8/18/2005 E-Mail Ennis R B, Contains draft 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR request for Re: VY EPU Review. additional information regarding accident and transient analyses

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052340239 Ennis R B, E-mail Ennis, NRR, 8/19/2005 E-Mail Jones S R, Contains staff 2 NRC/NRR to Jones, NRR, Re: NRC/NRR discussion of VY EPU RAls. response to request for additional information regarding condensate and feedwater system ML052340258 Ennis R B, E-mail Ennis, NRR, 8/19/2005 E-Mail Thomas G, Contains draft NRC/NRR to Thomas, NRR, NRC/NRR request for Re: VY EPU RAls. additional information regarding accident and transient analyses ML052340262 Jones S R, E-mail Jones, NRR, 8/19/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAls. response to request for additional information regarding condensate and J J.

feedwater system I

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052340251 Jones S R, E-mail Jones, NRR, 8/19/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAls. response to request for additional information regarding condensate and feedwater system ML052360313 Ennis R B, E-mail Ennis, NRR, 8/22/2005 E-Mail, PaIA N, Contains 9 NRG/NRR to RazzaqueNP, Requst Ifnr Razzaque M M, informton  :

Et. Al., ReL gVY EPU Additional Thomas G, regarding NRC RAls, Information NRC/NRR staff's internal (RAI) scheduling

.___

._____________ n__  ::__:__  ::practices  :

ML052360320 Thomas G, E-Mail Thomas, 8/22/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR recommendations Re: VY EPU RAI. to changes to request for additional information

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052410318 Abdullahi Z, E-mail Abdullahi, 8/25/2005 E-Mail Ennis R B, Contains staff 9 NRC/NRR NRR, to Ennis, NRR, NRC/NRR recommendations Re: VY EPU RAls. to changes to request for additional information regarding linear heat generation rate ML052410385 Abdullahi Z, E-mail Abdullahi, 8/25/2005 E-Mail Ennis R B, Contains staff 18 NRC/NRR NRR, to Ennis. NRR, NRrG/NRR rrcnmmrendations Re: VY EPU RAls. to changes to request for additional information regarding linear heat generation rate

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee I Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052410296 Ennis R B, E-mail Ennis, NRR, 8/25/2005 E-Mail Holden C F, Contains staff 4 NRC/NRR to Holden, NRR, Re: NRC/NRR recommendations VY EPU & regarding internal Conference Call. procedures for following up responses to requests for additional information ML052410379 Ennis R B, E-mail Ennis, NRR, 8/25/2005 E-Mail Jones S R, Contains staff 6 NRC/NRR to Jones. NRR. Re: NRC/NRR recommendations VY EPU RAIs. to changes to request for additional information regarding condensate and feedwater system

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06) 'V Accession Author Title/Description: Document Document Addressee I Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052410310 Marsh L B, E-mail Marsh, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU Conference regarding internal Call. procedures for following up responses to requests for additional information ML052410383 Razzaque M M, E-mail Razzaque, 8/25/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR NRR, to Ennis, NRR, NRG/NRR recommendations Re: VY EPU RAls. to changes to request for additional information regarding maximum and average power densities

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Number Name/Affiliation: Date Type Addressee Affiliation ML052410391 Reddy D K, E-mail Reddy, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR to Ennis, NRR Re: NRC/NRR recommendations VY EPU RAis. to changes to request for additional information regarding performance of safety relief valves ML052410316 Reddy D K, E-mail Reddy, NRR, 8/25/2005 E-Mail Ennis R B, Contains staffi 5 KNRC!NRR to Ennis, NRR, Re: NRr/NRR recommendations VY EPU RAls. to changes to request for additional information regarding condensate and feedwater system

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee I Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052410395 Tatum J E, E-mail Tatum, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAls. to changes to request for additional information regarding condensate and feedwater system ML052420358 Jones S R, E-Mail Jones, NRR, 8/26/2005 E-Mail Ennis R B. Contains staff 2 NRCKNRR to Ennis NIPP m ENRC/NRR recomnmendations VY EPU RA's. to changes to request for additional information regarding condensate and feedwater system

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052420371 Jones S R, E-mail Jones, NRR, 8/26/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAI. to changes to request for additional information regarding condensate and feedwater system ML052420376 Jones S R, E-mail Jones, NRR, 8/26/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR to Fnnis, NRR, Re: NPrC!NRP rerommendations VY EPU RAI. to changes to request for additional information regarding performance of safety relief valves ML052420401 Razzaque MM, E-mail Pazzaque, 8/26/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR NRR, to PAL, NRR, NRC/NRR recommendations Re: VY EPUSBO to draft safety Input.: evaluation regarding station

_____ _____ _________ _____ ____ _____ ____ blackout analysis _ _ _ _

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052420384 Tatum J E, E-mail Tatum, NRR, 8/26/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAis. to changes to request for additional information regarding condensate and feedwater system ML052420409 Ennis R'B,

4. 1NRC/NRRE-Mail[

E-rmailEnnis, NRR, to Holden, NRR, Et-1 8/29/2005'l: Holden C F, Contains info^rmatio,,

Al., Re:,VYEPU' regarding NRC Conference Cal. ' staff internal scheduling

____ __ __ __ _ practices ML052420408 Ennis R B, E-mail, Ennis, NRR, 8/29/2005 E-Mail Holden C F, Contains NRC/NRR to Holden, NRR, Et. NRC/NRR information Al., Re: VY EPU regarding NRC Conference Call. staff internal scheduling

-'_________'- __ '____________ _ __ __ __ __' p ra ctices

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 (Reissued 01/19/06)

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052440380 Ennis R B, E-mail Ennis, NRR, 8/30/2005 E-Mail Abdullahi Z, Contains 3 NRC/NRR to Wermiel, NRR, Et. Akstulewicz F information AL., Re:VY:EPUGE M, Wermiel-J regarding NRC Audit. S. NRC/NRR staff internal scheduling

_________________________________ ___ ___ __ -

__ _ _ f _ : _ _: ________:_0

practiceses

ML052440378 Ennis R B, E-mail Ennis, NRR, 8/31/2005 E-Mail' Thomas G, Contains 2 NRC/NRR to Thormias,'Re:R VY NRC/NRR; information EPU Question. ' :z regarding NRC staff internal~

sheduling,

__ __ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p ra c tic e s_ _ _ _ _

ML052440373 Ennis R B, E-mail Ennis, NRR, 8/31/2005: :l E-Mail We rmiel J S, Contains 3 NRC/NRR to Wermiel, NRR, NRC/NPRR: information Re: VY EPU Audit. regarding NRC Staff internal scheduling

__ __ __ _ __ _ __ _ _ _ _ _ _ _ __ _ _ __ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p rac tice s_ _ _ _ _

VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - September 29,2005 Reissued January 19, 20061 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-01 ML052500332 Stutzke M A, E-mail, Stutzke, 9/2/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of NRR, Re: VY preliminary results of EPU risk evaluation of Containment containment Overpressure overpressure credit Credit.

14-02 ML052450441 Ward L W, E-mail, Ward, 9/2/2005 E-Mail Lobel R M, Contains NRC staff 2 NRC/NRR NRR, to Lobel, NRC/NRR analysis of LBLOCA NRR, Re: BY mass and energy EPU LBLOCA release calculations Calc.

' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.

1 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-03 ML052500337 Abdullahi Z, E-mail, Abdullahi, 9/8/2005 E-Mail Gehin J C, Oak Contains discussion 4 NRC/NRR NRR, to Gehin, Ridge National of internal NRC staff ORNL, Re: VY Lab (ORNL) auditing procedures EPU GE Audit.

14-04 ML052550202 Ennis, Email, Ennis, 9/8/2005 Email Abdullahi Z, Contains information 2 NRC/NRR NRR, Abdullahi, NRC/NRR regarding internal NRR, re: VY EPU NRC staff scheduling Conference Call practices 14-05 ML052560046 Wang A B. E-mail Wang, 9/9/2005 E-Mail Ennis R B, Contains discussion 2 NRC/NRR NRR, to Ennis, NRC/NRR of internal NRC staff NRR, Re: VY auditing procedures EPU Conference Call.

14-06 ML052560045 Abdullahi Z, E-mail Ennis, 9/12/2005 E-Mail Ennis R B, Contains information 2 Akstulewicz F NRR, to NRC/NRR regarding internal M, NRC/NRR Abdullahi and NRC staff scheduling Akstulewicz, practices NRR, Re: VY EPU Conference Call.

2 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-07 ML052570529 Jones S R, E-mail, Jones, 9/12/2005 E-Mail Ennis R B, Contains NRC staff 3 NRC/NRR NRR, to Ennis, NRC/NRR analysis of NRR, Re: VY responses to EPU Supplement requests for

32. additional information 14-08 ML052580571 Burns T F, Erosion- 9/12/2005 Memoranda Anderson C J, Contains NRC staff's 8 NRC/RGN- Corrosion/Flow- NRC/RGN- analysis and I/DRS/PSB2 Accelerated- I/DRP/PB5 preliminary Corrosion recommendations Monitorin resulting from Activities for inspection of Power Uprate Erosion-Inspection Corrosion/Flow-Feeder for Accelerated-Vermont Yankee, Corrosion Monitoring Inspection Report Activities 05000271/20050 04 14-09 ML052570534 Ennis R B, E-mail, Ennis, 9/13/2005 E-Mail Abdullahi Z, Contains information 4 NRC/NRR NRR, to NRC/NRR regarding internal Abdullahi, NRR, NRC staff scheduling Et. Al., Re: VY practices EPU Schedule _ _

3 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14- 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-10 ML052570530 Ennis R B, E-mail, Ennis, 9/13/2005 E-Mail Jones S R, Contains information 4 NRC/NRR NRR, to Jones, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Supplement practices 32 14-11 ML052570507 Ennis R B, E-mail, Ennis, 9/13/2005 E-Mail Sienel B E, Contains NRC staff 2 NRC/NRR RGN-1, to Sienel, NRC/RGN-I discussion of NRR, Re: VY contents of draft EPU Review. safety evaluation 14-12 ML052570536 Jones S R, E-mail, Jones, 9/13/2005 E-Mail Ennis R B, Contains information 3 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Supplement practices 32.

14-13 ML052570547 Lobel R M, E-mail, Lobel, 9/13/2005 E-Mail Ennis R B, Contains information 3 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Schedule. practices 14-14 ML052570544 Pal A N, E-mail, Pal, NRR, 9/13/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR to Ennis, NRR, NRC/NRR regarding internal Re: VY EPU NRC staff scheduling Schedule. practices 4 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09/29105 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-15 ML052570518 Sienel B E, E-mail, Sienel, 9/13/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/RGN-I RGN-1, to Ennis, NRC/NRR discussion of NRR, Re: VY contents of draft EPU Review. safety evaluation 14-16 ML052590139 Ennis R B, E-mail, Ennis, 9/14/2005 E-Mail Jones S R, Contains information 2 NRC/NRR NRR, to Ready, Reddy D K, regarding internal NRR, Et. AL., Re: Tatum J E, NRC staff scheduling VY EPU NRC/NRR practices Conference Call.

14-17 ML052570537 Ennis R B, E-mail, Ennis, 9/14/2005 E-Mail Reddy D K, Contains NRC staff 2 NRC/NRR NRR, to Reddy, NRC/NRR discussion of NRR, Re: VY contents of draft EPU SBO RAI safety evaluation 14-18 ML052590099 Razzaque M E-mail, 9/14/2005 E-Mail Ennis R B, Contains NRC staff 3 M, NRC/NRR Razzaque, NRR, NRC/NRR discussion regarding to Ennis, NRR, internal review Re: VY EPU practices and Supplement 32 contents of draft safety evaluation 5 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14- 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-19 ML052570525 Devender R E-mail, Reddy, 9/14/2005 E-Mail Ennis R B, Contains NRC staff 2 K, NRC/NRR NRR, to Ennis, NRC/NRR discussion regarding NRR, Re: VY internal review EPU SBO RAls practices and contents of draft safety evaluation 14-20 ML052570517 Reddy D K, E-mail, Reddy, 9/14/2005 E-Mail Jones S R, Contains NRC staff 4 NRC/NRR NRR, to Jones, NRC/NRR discussion of NPR R: VY contet ofd EPU SBO RAls. safety evaluation 14-21 ML052590136 Tatum J E, E-mail, Tatum, 9/14/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Conference practices Call.

14-22 ML052620316 Ennis R B, E-mail, Ennis, 9/15/2005 E-Mail Razzaque M M, Contains NRC staff 5 NRC/NRR NRR, to NRC/NRR discussion of Razzaque, NRR, contents of draft

- Re: VY EPU safety evaluation and Supplement 32. draft requests for additional information 6 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-23 ML052620313 Jones S R, E-mail, Jones, 9/15/2005 E-Mail Lyons J E, Contains NRC staff 4 NRC/NRR NRR, to Lyons, NRC/NRR analysis of NRR, Re: VY responses to EPU Issues. requests for additional information regarding condensate and feedwater system . -

14-24 ML052620321 Razzaque M E-mail; 9/15/2005 E-Mail Enniq R R. Contains NRC staff 9 M, NRC/NRR Razzaque, NRR, NRC/NRR discussion of to Ennis, Re: VY contents of draft EPU Supplement safety evaluation and

32. draft requests for additional information 14-25 ML052590108 Reddy D K, E-mail, Reddy, 9/15/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of NRR, Re: VY contents of draft EPU SBO Input. safety evaluation 14-26 ML052590060 Reddy D K, E-mail, Reddy, 9/15/2005 E-Mail Pal A N, Contains NRC staff 3 NRC/NRR NRR, to Pal, NRC/NRR discussion of NRR, Re: VY contents of draft EPU SBO Input. safety evaluation 7 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14- 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-27 ML052590121 Scarbrough T E-mail, 9/15/2005 E-Mail Ennis R B, Contains NRC staff 2 G, NRC/NRR Scarbrough, NRC/NRR discussion regarding NRR, to Ennis, internal review NRR, Re: VY practices EPU Supplement 33.

14-28 ML052590132 Scarbrough T E-mail, 9/15/2005 E-Mail Ennis R B, Contains NRC staff 2 G, NRC/NRR Scarbrough, NRC/NRR discussion regarding KIPP to Pnnia interna2l reiew NRR, Re: V practices EPU Supplement 33.

14-29 ML052660070 Ennis R B, E-mail, Ennis, 9/15/2005 E-Mail Scarbrough T G, Contains NRC staff 2 NRC/NRR NRR, to NRC/NRR discussion regarding Scarbrough, internal review NRR, Et. Al., Re: practices VY EPU Supplement 33.

8 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-30 ML052640132 Ennis R B, E-mail, Ennis, 9/16/2005 E-Mail Imbro E V, Contains NRC staff 4 NRC/NRR NRR, to Imbro, NRC/NRR discussion of NRR, Re: VY contents of draft EPU GE Review. safety evaluation and draft requests for additional information 14-31 ML052640165 Grimes C I, E-mail, Grimes, 9/16/2005 E-Mail Marsh L B, Contains NRC staff 4 NRC/NRR NRR, to Mayfield Mayfield M E, analysis of and Marsh, MNOR NIO!NIO responses to Re: VY EPU requests for Steam Dryer. information regarding steam dryer review 14-32 ML052640148 Imbro E V, E-mail, Imbro, 9/16/2005 E-Mail Ennis R B, Contains NRC staff 4 NRC/NRR NRR, to Ennis, NRC/NRR discussion of internal NRR, Re: VY NRC staff scheduling EPU Review. practices and contents of draft safety evaluation 9 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09129/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-33 ML052640150 Imbro E V, E-mail, Imbro, 9/16/2005 E-Mail Ennis R B, Contains NRC staff 4 NRC/NRR NRR, to Ennis, NRC/NRR discussion of internal NRR, Re: VY NRC staff scheduling EPU Review. practices and contents of draft safety evaluation 14-34 ML052620274 Ennis R B, E-mail, Ennis, 9/16/2005 E-Mail Jones S, Reddy Contains information 2 NRC/NRR NRR, to Reddy, D, Tatum J, regarding internal IR' rn, Re1. V I'dI 1l, 1II'I l , Iva La.II actI IVUI11 IV EPU Conference practices Call.

14-35 ML052620295 Ennis R B, E-mail, Ennis, 9/16/2005 E-Mail Roberts D J, Contains NRC staff 4 NRC/NRR NRR, to Roberts, NRC/NRR discussion of draft NRR, Et. Al., Re: safety evaluation and VY EPU Review. internal NRC staff scheduling practices 14-36 ML052640135 Abdullahi Z, E-mail, Abdullahi, 9/18/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Re: VY safety evaluation and EPU GE internal NRC staff Conference call. scheduling practices 10 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-37 ML052640141 Alexion T W, E-mail, Alexion, 9/19/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion regarding NRR, Re: VY internal review EPU Testing. practices 14-38 ML052640122 Ennis R B, E-mail, Ennis, 9/19/2005 E-Mail Marsh T B, Contains information 2 NRC/NRR NRR, to Marsh, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Steam practices Conference Calls.

14-39 ML052640155 Marsh L B, E-mail, Marsh, 9/19/2005 E-Mail Alexion T W, Contains NRC staff 2 NRC/NRR NRR, to Alexion, NRC/NRR discussion regarding NRR, Re: VY internal review EPU Testing. practices 14-40 ML052640143 Marsh L B, E-mail, Marsh, 9/19/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU Conference practices Calls.

11 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-41 ML052640138 Marsh L B, E-mail, Marsh, 9/19/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of NRR, Re: VY responses to EPU Supplement requests for

34. additional information regarding steam dryer load 14-42 ML052640160 Thatcher D F, E-mail, Thatcher, 9/19/2005 E-Mail Alexion T W, Contains NRC staff 2 NRC/NRR NRR to Alexion, NRC/NRR discussion regarding NRR, Re: VY internal review EPU Testing. practices 14-43 ML052640415 Akstulewicz F E-mail 9/20/2005 E-Mail Holden C F, Contains NRC staff 3 M, NRC/NRR Akstulewicz, NRC/NRR analysis of NRR, to Holden, responses to NRR, Et. Al., Re: requests for VY EPU SRXB additional information Status.

14-44 ML052640419 Jones S R, E-mail Jones, 9/20/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling VY EPU practices Conference Call.

12 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-45 ML052640424 Reddy D K, E-mail Reddy, 9/20/2005 E-Mail Ennis R B, Contains information 3 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling VY EPU practices Conference Call.

14-46 ML052640417 Tatum J E, E-mail Tatum, 9/20/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling V EPI I nrac-tiacs Conference Call.

14-47 ML052640432 Ennis R B, E-mail, Ennis, 9/20/2005 E-Mail Reddy D K, Contains information 3 NRC/NRR NRR, to Reddy, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling VY EPU practices Conference Call.

14-48 ML052640412 Marsh L B, E-mail Marsh, 9/21/2005 E-Mail Boger B A, Contains information 3 NRC/NRR NRR, to Boger, NRC/NRR regarding internal NRR, Et. Al., Re: NRC staff scheduling VY EPU SE practices Inputs. _ _

13 of 14

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 14 - 09/29/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 14-49 ML052650195 Ennis R B, E-mail, Ennis, 9/21/2005 E-Mail Grimes C I, Contains information 3 NRC/NRR NRR, to Grimes, NRC/NRR regarding internal NRR, Re: VY NRC staff scheduling EPU practices Communications.

14-50 ML052650197 Grimes C 1, E-mail, Grimes, 9/21/2005 E-Mail Scarbrough T G, Contains NRC staff 2 NRC/NRR NRR, to NRC/NRR discussion regarding Scarbrough, internal review NRR, Et A!,Re: practices VY EPU Communications.

14-51 ML052650086 Jones S R, E-mail, Jones, 9/21/2005 E-Mail Ennis R B, Contains NRC staff 2 NRC/NRR NRR, to Ennis, NRC/NRR recommendations NRR, Re: VY regarding content of EPU License draft safety Condition. evaluation 14 of 14

VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - October 31, 2005 Reissued January 19, 20061 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-01 ML052710076 Ennis R B, E-mail, Ennis, 9/22/2005 E-Mail Akstulewicz F Contains information 2 NRC/NRR NRR to M, NRC/NRR concerning NRC Akstulewicz, Staff scheduling NRR, Re: VY practices EPU Conference Call.

15-02 ML052650199 Grimes C I, E-mail, Grimes, 9/22/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR Re: VY Staff review practices EPU (Redacted version Communications. will be made available in Supplement 16) 1The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.

1 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-03 ML052710080 Kotzalas M A, E-mail, Kolzalas, 9/22/2005 E-Mail Ennis R B, Contains NRC Staff 5 NRC/NRR NRR, to Ennis, NRC/NRR recommended input NRR, Re: VY to draft SER EPU SBO Input. regarding effect of EPU on station blackout 15-04 ML052710041 Sekerak S P, E-mail, Sekerak, 9/23/2005 E-Mail Wu C, Contains NRC Staff 11 NRC/NRR NRR, to Wu, NRC/NRR recommended input NRR, Re: VY to draft SER EPU Draft SER regarding effect of Inp. o+

.II 1JtL. =DI I ,- 0DI supports, RPV internals and core support structures, and CRDM pressure boundary housing 15-05 ML052710044 Razzaque M E-mail, 9/26/2005 E-Mail Ennis R B, Contains NRC Staff M, NRC/NRR Razzaque, NRR, NRC/NRR discussion of draft to Ennis, NRR, RAls concerning Re: VY EPU LBLOCAs, fuel SRXB RAIs storage, and RHR 15-06 ML052710043 Ennis R B, E-mail, Ennis, 9/27/2005 E-Mail Razzaque M M, Contains NRC Staff NRC/NRR NRR, to NRC/NRR discussion of draft Razzaque, NRR, RAls concerning Re: VY EPU LBLOCAs, fuel SRXB RAls storage, and RHR 2 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/1 9/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-07 ML052710045 Huang T L, E-mail, Huang, 9/27/2005 E-Mail Ennis R B, Contains NRC Staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Re: VY RAls concerning EPU SRXB RAls. LBLOCAs, fuel storage, and RHR 15-08 ML052720436 Ennis R B, E-mail, Ennis, 9/28/2005 E-Mail Akstulewicz F Contains information 4 NRC/NRR NRR, to M, NRC/NRR concerning NRC Akstulewicz, Staff reviewing and NRR, Et. Al., Re: scheduling practices VY EPU SE 15-09 ML052720447 Jones S R, E-mail, Jones, 9/28/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR, Re: VY Staff reviewing and EPU SE Status. scheduling practices 15-10 ML052720444 Kotzalas M A, E-mail, Kotzalas, 9/28/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR, Re: VY Staff reviewing and EPU SE Status. scheduling practices 3 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-11 ML052790699 Thatcher D F, Draft Safety 9/29/2005 Memoranda Roberts D J, Contains NRC Staff 18 NRC/NRR/DI Evaluation Power Safety NRC/NRR/DLP recommended input PM/IPSB Ascension Evaluation M/LPD2 to draft SER Testing for regarding power Vermont Yankee, ascension testing Dated September 10, 2003.

15-12 ML052720443 Fischer D C, E-mail, Fischer, 9/29/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR, Re: VY Staff reviewing and EPU SE Status scheduling practices 15-13 ML052790091 Pal A N, E-mail, Pal, NRR, 9/29/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR to Ennis, NRR, NRC/NRR concerning NRC Re: VY EPU SE Staff reviewing and Status. scheduling practices 15-14 ML052790087 Pettis R L, E-mail, Pettis, 9/29/2005 E-Mail Ennis R B, Contains information 2 NRC/NRR NRR, to Ennis, NRC/NRR concerning NRC NRR, Re: VY Staff reviewing and EPU SE Status scheduling practices 15-15 ML052730071 Jenkins R V, Vermont Yankee: 9/29/2005 Memoranda Roberts D J, Contains NRC Staff 15 NRC/NRR/DE Thermal Power Safety NRC/NRR/DLP recommended input

/EEIB Uprate - Station Evaluation M/LPD2 to draft SER Blackout. regarding station blackout 4 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-16 ML052790059 Jones S R, E-mail, Jones, 9/30/2005 E-Mail Tatum J E, Contains NRC Staff 2 NRC/NRR NRR, to Tatum, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient Condition. testing 15-17 ML052790061 Jones S R, E-mail, Jones, 9/30/2005 E-Mail Tatum J E, Contains NRC Staff 2 NRC/NRR NRR, to Tatum, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient onnditio.nn testing 15-18 ML052790063 Jones S R, E-mail, Jones, 9/30/2005 E-Mail Tatum J E, Contains NRC Staff 2 NRC/NRR NRR, to Tatum, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient Condition. testing 15-19 ML052790064 Tatum J E, E-mail, Tatum, 9/30/2005 E-Mail Jones S R, Contains NRC Staff 2 NRC/NRR NRR, to Jones, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient Condition. testing 5 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-20 ML052790068 Tatum J E, E-mail, Tatum, 9/30/2005 E-Mail Jones J R, Contains NRC Staff 2 NRC/NRR NRR, to Jones, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding transient Condition. testing 15-21 ML052790066 Tatum J E, E-mail, Tatum, 9/30/2005 E-Mail Jones S R, Contains NRC Staff 2 NRC/NRR NRR, to Jones, NRC/NRR discussion of draft NRR, Re: WY license condition EPU License regarding transient 15-22 ML052730335 Manoly K A, Safety Evaluation 9/30/2005 Memoranda Roberts D J, Contains NRC Staff 40 NRC/NRR/DE of Vermont Safety NRC/NRR/DLP recommended input

/EMEB Yankee Nuclear Evaluation M/LPD1 to draft SER Power Station, regarding structural License No. and pressure DPR-28 (Docket boundary integrity of No. 50-271), various systems, Technical effect of EPU on Specification condensate and Proposed feedwater system, Change No. 263, and performance of Extended Power safety-related valves Uprate.

6 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-23 ML052730219 Dennig R L, Safety Evaluation 9/30/2005 Memoranda Roberts D J, Contains NRC Staff 38 NRC/NRR/DS Report Input - NRC/NRR/DLP recommended input SA/SPSB Review of M/LPD1 to draft SER Containment regarding Systems and containment system Analysis for the safety Vermont Yankee Nuclear Power Station Extended Power Uprate (TAC IVIC76i) 15-24 ML052710446 Jones S R, Vermont Yankee 9/30/2005 Memoranda Roberts D J, Contains NRC Staff 28 NRC/NRR/DS EPU SPLB-A NRC/NRR/DLP recommended input SANSPLB BOP Input. M/LPD1 to draft SER regarding balance of plant systems 15-25 ML052790105 Ennis R B, E-mail, Ennis, 10/1/2005 E-Mail Scarbrough T G, Contains NRC Staff 11 NRC/NRR NRR, to NRC/NRR discussion of draft Scarbrough, license condition NRR, Re: VY regarding potential EPU Steam adverse flow effects Dryer License Conditions.

7 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-26 ML052790121 Akstulewicz F E-mail, 10/3/2005 E-Mail Ennis R B, Contains NRC Staff 2 M, NRC/NRR Akstulewicz, NRC/NRR discussion of draft NRR, to Ennis, license condition NRR, Re: VY regarding potential EPU SLMCPR. adverse flow effects 15-27 ML052790130 Ennis R B, E-mail, Ennis, 10/3/2005 E-Mail Akstulewicz F Contains NRC Staff 2 NRC/NRR NRR, to M, NRC/NRR discussion of draft Akstulewicz, license condition NRR, Re: VY regarding potential EPU SLMCPR. adverse flow effects 15-28 ML052790084 Scarbrough T E-mail, 10/3/2005 E-Mail Ennis R B, Contains NRC Staff 2 G, NRC/NRR Scarbrough, NRC/NRR discussion of draft NRR, to Ennis, license condition NRR, Re: VY regarding potential EPU License adverse flow effects Conditions.

15-29 ML052790050 Scarbrough T E-mail, 10/3/2005 E-Mail Ennis R B, Contains NRC Staff 3 G, NRC/NRR Scarbrough, NRC/NRR discussion of draft NRR, to Ennis, license condition NRR, Re: VY regarding potential EPU License adverse flow effects Conditions.

8 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-30 ML052770442 Rubin M P, Safety Evaluation 10/3/2005 Memoranda Roberts D J, Contains NRC Staff 20 NRC/NRR/DS Report Input Safety NRC/NRR/DLP recommended input SA/SPSB Concerning the Evaluation M/LPD1 to draft SER Risk Evaluation Report regarding risk of the Vermont evaluation Yankee Nuclear Power Station Extended Power Uprate Application (TAC No. MC0761).

15-31 ML052790065 Roberts D J, E-mail, Roberts, 10/4/2005 E-Mail Marsh L B, Contains information 2 NRC/NRR NRR, to Marsh, NRC/NRR concerning NRC NRR, Et. Al., Re: Staff reviewing and VY EPU License scheduling practices Condition.

15-32 ML052790043 Sheron B W, E-mail, Sheron, 10/4/2005 E-Mail Ennis R B, Contains NRC Staff 2 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Et. Al., Re: license condition VY EPU License regarding risk-Conditions. informed evaluation of requested containment overpressure credit 9 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-33 ML052790132 Ennis R B, E-mail, Ennis, 10/5/2005 E-Mail Stutzke M A, Contains NRC Staff 6 NRC/NRR NRR, to Stutzke, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding risk-Condition. informed evaluation of requested containment overpressure credit 15-34 ML052790048 Marsh L B, E-mail, Marsh, 10/5/2005 E-Mail Ennis R B, Contains NRC Staff 3 NRr/NRR NRR, Ennis NRCNRR evaluations and NRR, Et. AL., Re: recommendations VY EPU License concerning press Conditions. release concerning issuing of license conditions 15-35 ML052790038 Stutzke M A, E-mail, Stutzke, 10/5/2005 E-Mail Ennis R B, Contains NRC Staff 4 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding risk-Conditions. informed evaluation of requested containment overpressure credit 10 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-36 ML052790039 Stutzke M A, E-mail, Stutzke, 10/5/2005 E-Mail Ennis R B, Contains NRC Staff 3 NRC/NRR NRR, to Ennis, NRC/NRR discussion of draft NRR, Re: VY license condition EPU License regarding risk-Conditions. informed evaluation of requested containment overpressure credit 15-37 ML052850136 Scarbrough T E-mail, 10/7/2005 E-Mail Ennis R B, Contains NRC Staff 3 GJI ' 41.uI I'dI II a I Ug NI IIICIrIIIo.AeU IInIJUL NRR, to Ennis, to draft SER NRR, Re: VY regarding inspection EPU Inspections. follow-up items 15-38 ML052850151 Ennis R B, E-mail, Ennis, 10/8/2005 E-Mail Knutson E C, Contains NRC Staff 8 NRC/NRR NRR, to Sienel Sienel B E, recommended input and Knutson, NRC/RGN-I to draft SER RGN-1, Re: VY regarding inspection

_ EPU Inspections. follow-up items 11 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-39 ML052850051 Akstulewicz F Safety Evaluation 10/11/2005 Memoranda Roberts D J, Contains NRC Staff 64 M, Input for Safety NRC/NRR/DLP recommended input NRC/NRR/DS Extended Power Evaluation M/LPD1 to draft SER SA/SRXB Uprate Vermont regarding ECCS Yankee Nuclear LOCA and Methods Power Station Evaluation (TAC No.

MC0761) Section 2.8.7 and Revised Section 15-40 ML052900197 Ennis R B, E-mail, Ennis, 10/14/2005 E-Mail Reddy D K, Contains NRC Staff 4 NRC/NRR NRR, to Reddy, NRC/NRR analysis of licensee's NRR, Et. Al., Re: proposed VY EPU modification of draft Conference Call. license condition regarding transient testing 12 of 13

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 15 - 10/31/05 (Reissued 01/19/06)

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 15-41 ML052900188 Jones S R, E-mail, Jones, 10/14/2005 E-Mail Reddy D K, Contains NRC Staff 3 NRC/NRR NRR, to Reddy, NRC/NRR analysis of licensee's NRR, Et. Al., Re: proposed VY EPU License modification of draft Condition. license condition regarding transient testing 15-42 ML052900185 Stutzke M A, E-mail, Stutzke, 10/14/2005 E-Mail Rubin M P, Contains NRC Staff 3 NRC/NRR NRR, to Rubin, NRC/NRR analysis of licensee's EPU containment Containment overpressure credit Overpressure. (Redacted version will be made available in Supplement 16) 15-43 ML052900195 Tatum J E, E-mail,Tatum, 10/14/2005 E-Mail Reddy D K, Contains NRC Staff 4 NRC/NRR NRR, to Reddy, NRC/NRR analysis of licensee's NRR, Et. Al., Re: proposed VY EPU modification of draft Conference Call. license condition regarding transient testing 13 of 13

VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 16 - November 14,2005 Reissued January 19, 2006' Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 16-01 ML053080208 Ennis R B, E-mail, Ennis, 10/27/2005 E-Mail, Richards S A, Contains NRC Staff 38 NRC/NRR NRR, to Slides and NRC/NRR recommendations Richards, NRR, Viewgraphs and discussion of Et. Al., Re: VY Staff presentation to EPU ACRS the ACRS Presentation.

16-02 ML053080206 Anderson C E-mail, 11/2/2005 E-Mail Ennis R B, Contains NRC Staff 3 J, NRC/RGN- Anderson, RGN- NRC/NRR discussion of I I, to Ennis, NRR, regional inspector's Re: VY EPU comments on Steam Dryer. preliminary results of VY steam dryer inspection

' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.

1 of 2

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 16 - NOVEMBER 14,2005 (Reissued January 19, 2006)

PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 16-03 ML053080203 Ennis R B, E-mail, Ennis, 11/2/2005 E-Mail Scarbrough T G, Contains NRC 3 NRC/NRR NRR, to NRC/NRR regional inspector's Scarbrough, comments on NRR, Et. AL., Re: preliminary results of VY EPU Steam VY steam dryer Dryer. inspection 16-04 ML053080204 Ennis R B, E-mail, Ennis, 11/2/2005 E-Mail Scarbrough T G, Contains regional 5 NRC/NRR NRR, to NRC/NRR inspector's Scarbrough, comments on NRR, Re: VY preliminary results of FPU Steam \Y steam dryer Dryer. inspection 16-05 ML053120102 Ennis R B, E-mail, Ennis, 11/3/2005 E-Mail, Jones S R, Contains NRC Staff 19 NRC/NRR NRR, to Jones, Letter NRC/NRR recommendations NRR, Et. Al., Re: and discussion of VY EPU Staff presentation to Supplement 41. the ACRS (Non-privileged material (Entergy's Supplement 41) available at ML053120378) 2 of 2

VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 17 - November 28, 2005 Reissued January 19, 20061 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 17-01 ML053180027 Ennis R B, E-mail, Ennis, 11/3/2005 E-Mail Scarbrough T G, Contains NRC Staff 32 NRC/NRR NRR, to NRC/NRR discussion Scarbrough, concerning results of NRR, Et. Al., Re: VY steam dryer VY EPU Steam inspection.

Dryer Redacted version (factual information) will be made available for Supplement 18

' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.

1 of 2

PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 17 11/28/05 (Reissued 01/1 9106) 1W PDP Accession Author Title/ Document Document Addressee I Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 17-02 ML053180029 White J R, E-mail, White, 11/3/2005 E-Mail Ennis R B, Contains NRC Staff 30 NRC/RGN-1 RGN-1, to Ennis, NRC/NRR discussion NRR, Re: VY concerning results of EPU Steam VY steam dryer Dryer. inspection.

Redacted version (factual information) will be made available for Supplement 18 2 of 2

VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 18 - December 12,2005 Reissued January 19, 2006' Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.

PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 18-01 ML053320396 Stutzke M A, E-mail, Stutzke, 11/21/2005 E-Mail Ennis R B, Contains NRC Staff 4 NRC/NRR NRR, to Ennis, NRC/NRR member's proposed NRR, Re: VY RAls regarding EPU Entergy's probabilistic Supplements 38 risk analysis of and 39. containment overpressure (Note:

final version of RAls available at ML053260427)

' The Director of the Division of Operating Reactor Licensing, Catherine Haney, has decided on behalf of the NRC that all of the documents listed in this privilege log should be withheld from public disclosure under the deliberative process privilege.

1 of 2

u PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 18 - 12/12/05 (Reissued 01/19/06) It PDP Accession Author Title/ Document Document Addressee / Comment Page No. Number Name/

Description:

Date Type Addressee Count Affiliation: Affiliation 18-02 ML053320402 Reddy D K, E-mail, Reddy, 11/22/2005 E-Mail Ennis R B, Contains NRC Staff 9 NRC/NRR NRR, to Ennis, NRC/NRR member's proposed NRR, Re: VY revisions to Sections EPU SE 2.5.4.4 (Condensate Revision. and Feedwater System) and 2.12 (Power Ascension Testing: BOP Systems Testing Review) of the Draft Safety Evaluation 2 of 2

I 0V UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

ENTERGY NUCLEAR VERMONT YANKEE Docket No. 50-271 -OLA LLC and ENTERGY NUCLEAR OPERATIONS, INC. ASLBP No. 04-832-02-OLA (Vermont Yankee Nuclear Power Station)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing letter from Jason C. Zorn, Counsel for NRC Staff, to the Atomic Safety and Licensing Board, dated January 19, 2006, responding to the Licensing Board's December 21, 2005, Order, together with attachments, in the captioned proceeding have been served on the following. Service has been performed by deposit in the U.S. Mail, First Class; through electronic mail, with copies to follow by deposit in the NRC's internal mail system (as indicated by a single asterisk); or through electronic mail, with copies to follow by deposit in the U.S. Mail, First Class (as indicated by two asterisks), this 19t day of January, 2006.

Alex S. Karlin, Chair* Dr. Anthony J. Baratta*

Administrative Judge Administrative Judge Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3F23 Mail Stop T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 (E-mail: ask2@nrc.gov) (E-mail: ajb5@nrc.gov)

Lester S. Rubenstein** Office of the Secretary*

Administrative Judge ATTN: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: 0-1 6C1 4760 East Country Villa Drive U.S. Nuclear Regulatory Commission Tucson, AZ 85718 Washington, DC 20555-0001 (E-mail: lesrrr@comcast.net) (E-mail: HEARINGDOCKET@nrc.gov)

Office of Commission Appellate John M. Fulton, Esq.

Adjudication* Assistant General Counsel Mail Stop: O-16C1 Entergy Nuclear Operations, Inc.

U.S. Nuclear Regulatory Commission 440 Hamilton Avenue Washington, DC 20555-0001 White Plains, NY 10601

I 1...

Jay E. Silberg, Esq.** Raymond Shadis**

Matias Travieso-Diaz, Esq.** Staff Technical Advisor Pillsbury Winthrop Shaw Pittman, LLP New England Coalition 2300 N St., NW P.O. Box 98 Washington, DC 20037-1128 Edgecomb, ME 04556 (E-mail: jay.silberg @pillsburylaw.com (E-mail: shadisQprexar.com matias.travieso-diaz ©pillsburylaw.com) shadis ©ime.net)

Sarah Hofmann, Esq.** Anthony Z. Roisman, Esq.**

Special Counsel National Legal Scholars Law Firm Department of Public Service 84 East Thetford Rd.

112 State Street - Drawer 20 Lyme, NH 03768 Montpelier, VT 05620-2601 (E-mail:

(E-mail: sarah.hofmann@state.vt.us) aroisman @nationallegalscholars.com)

Jonathan M. Rund, Esq.* Jared Lindsay, Esq.*

Law Clerk Law Clerk Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 (E-mail: imr3@nrc.pov) (E-mail: iilSnrc.aov)

Jasoh C. Zorn Counsel for NRC Staff