{{#Wiki_filter:4 I 4 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR: 8708260165 DOC.DATE: 87/08/20 NOTARIZED:
{{#Wiki_filter:4 4
NO DOCKET 0 FACIL: STN-50-528 Palo Verde Nuclear Stations Unit ii Arizona Pub li 05000528 AUTH.NAME AUTHOR AFFILIATION HAYNES>J.Q.Arizona Nuclear Power ProJect (Formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
I REGULATORY INFORMATION DISTRIBUTION SYSTEM     (RIDS)
ACCESSION NBR: 8708260165       DOC. DATE: 87/08/20   NOTARIZED: NO       DOCKET 0 FACIL: STN-50-528 Palo Verde Nuclear Stations Unit ii Arizona Pub AUTH. NAME           AUTHOR AFFILIATION li 05000528 HAYNES> J. Q.       Arizona Nuclear Power ProJect (Formerly Arizona Public Serv RECIP. NAME         RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards revised graph page to rev to reload Tech Spec amends Attachment 2i shutdown margin.DISTRIBUTION CODE.AOOID COPIES RECEIVED, LTR (ENCL J SIZE,~l TITLE: OR Submittal:
Forwards revised graph page to rev to reload Tech Spec amends Attachment 2i shutdown margin.
General Distribution NOTES: Standardized plant.M.Davisi NRR: 1Cg.05000528 RECIPIENT ID CODE/NAME PD5 LA LICITRAs E INTERNAL: ACR S NRR/DEST/ADS
DISTRIBUTION CODE. AOOID       COPIES RECEIVED, LTR   ( ENCL J SIZE,   ~ l TITLE:   OR Submittal: General Distribution NOTES: Standardized plant. M. Davisi NRR: 1Cg.                             05000528 RECIPIENT         CQP  IES          RECIPIENT        CQP IES ID CODE/NAME      LTTR ENCL      .
.NRR/DEST/MTB NRR/DOEA/TSB OQC/HDS1 RES/DE/EIB EXTERNAL: EQhQ BRUSKEI 8 NRC PDR NOTES: CQP IES LTTR ENCL 1 0 1 1 6 6 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 RECIPIENT.ID CODE/NAME PD5 PD DAVISi M ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB N MAS/ILRB FIL 01 LPDR NSIC CQP IES LTTR ENCL 5 5 1 1 1 0 1 1 1 1 1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 26  
ID CODE/NAME     LTTR ENCL PD5 LA                 1      0  PD5 PD                5    5 LICITRAs E             1      1  DAVISi M              1    1 INTERNAL: ACR S                     6      6  ARM/DAF/LFMB          1    0 NRR/DEST/ADS           1      1  NRR/DEST/CEB          1    1
/(F Arizona Nuclear Power Project P.o.BOX 52034 4 PHOENIX.ARIZONA 85072-2034 August 20, 1987 161-00454-JGH/LJM U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mashington, D.C.20555  
          . NRR/DEST/MTB           1      1  NRR/DEST/RSB          1    1 NRR/DOEA/TSB           1      1  N      MAS/ ILRB      1    1 OQC/HDS1               1      0        FIL      01    1    1 RES/DE/EIB             1 EXTERNAL: EQhQ BRUSKEI 8           1      1  LPDR NRC PDR               1       1   NSIC NOTES:                              1       1 TOTAL NUMBER OF COPIES REQUIRED: LTTR         29   ENCL   26
 
/(
F
 
Arizona Nuclear Power Project P.o. BOX 52034 4 PHOENIX. ARIZONA 85072-2034 August 20, 1987 161-00454-JGH/LJM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mashington, D.C. 20555


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 1 Docket No.STN 50-528 (License NPF-41)Revision to Reload Technical Specification Amendment-Attachment 2, Shutdown Margin File: 87-F-005-419.05 87-B-056-026
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528 (License NPF-41)
Revision   to Reload     Technical       Specification         Amendment       Attachment   2, Shutdown Margin File: 87-F-005-419.05       87-B-056-026


==References:==
==References:==
: 1)  Letter from J. G. Haynes (ANPP) to Document Control Desk (NRC) dated June 29, 1987 (161-00320),


1)Letter from J.G.Haynes (ANPP)to Document Control Desk (NRC)dated June 29, 1987 (161-00320),
==Subject:==
Reload Technical Specification      Amendment.
: 2)   Letter from J.         G. Haynes       (ANPP) to G. M. Knighton            (NRC) Dated January 23, 1987.           


==Subject:==
==Subject:==
Reload Technical Specification Amendment.
Technical Specification             Amendment Sections 1.0, 2.2, 3/4.1, 3/4.3, 3/4.10.
2)Letter from J.G.Haynes (ANPP)to G.M.Knighton (NRC)Dated January 23, 1987.
: 3)   Letter from J.         G. Haynes       (ANPP)   to Document Control Desk (NRC) dated    July 17,     1987 (161-00377).          


==Subject:==
==Subject:==
Technical Specification Amendment Sections 1.0, 2.2, 3/4.1, 3/4.3, 3/4.10.3)Letter from J.G.Haynes (ANPP)to Document Control Desk (NRC)dated July 17, 1987 (161-00377).
Revision to Technical Specification     Amendment Sections           1.0, 2.2, 3/4.1, 3/4.3, 3/4.10.


==Subject:==
==Dear  Sir:==
Revision to Technical Specification Amendment-Sections 1.0, 2.2, 3/4.1, 3/4.3, 3/4.10.
 
At the time the Reference (1) letter was submitted,                              it  was assumed    that the Temperature Dependent Shutdown Margin Technical Specification Amendment, Revision 0, (Reference 2) would be approved and therefore the Shutdown Margin graph, of Fig.
3.1-1A would be used for Cycle 1 operation. Based on that assumption, the Cycle 2 Shutdown Margin amendment,      Attachment 2 of the Reference (1) letter, was developed accordingly. However, during the Cycle 2 reload review, an error in the Inadvertent Boron Dilution Event analysis was identified. As a result Technical Specification Amendment              of the Reference          '2) of'he
                                                                                  . letter, reanalysis, the concerning the Temperature Dependent-Shutdown Margin graph, required changing. Because of the change made to the Cycle 1 Shutdown        Margin Technical Specification amendment graph the same change is required for the Cycle 2 graph. The justification for the change is given in the Reference (3) letter.
The change    to the Cycle 2 amendment is the result                          of the Cycle      1  Technical Specification changes and not the Cycle 2 reanalysis,                          therefore, the    reasons  and justifications    as discussed  in the Reference (1) letter                  remain the same and only      the graph requires replacement.      Attached      is  the revised page.
By copy  of this letter,     we are    also forwarding the revision to the appropriate                    state agency.
8708260ih5 870820                                                                                          oo4 PDR  ~ ADQCK  05000528 p                    PDR
                                                                                                              >)L
 
I t
I
 
USNRC  Document Control Desk Revision to Reload Technical Specification Amendment  Attachment 2, Shutdown Margin 161- 00454 Page 2 August 20, 1987 Xf you have any questions,    please call W. F. Quinn, at (602) 371-4087.
Very  truly yours, 4  P~    p
                                            . G. Haynes Vice President Nuclear Production JGH/LJM/ls Attachment cc:  0. M. De Michele (all  w/a)
E. E. Van Brunt, Jr.
A. C. Gehr J. R. Ball J. B. Martin G. N. Knighton E. A. Licitra C. E. Tedford


==Dear Sir:==
        ~-
At the time the Reference (1)letter was submitted, it was assumed that the Temperature Dependent Shutdown Margin Technical Specification Amendment, Revision 0, (Reference 2)would be approved and therefore the Shutdown Margin graph, of Fig.3.1-1A would be used for Cycle 1 operation.
li Ei tt}}
Based on that assumption, the Cycle 2 Shutdown Margin amendment, Attachment 2 of the Reference (1)letter, was developed accordingly.
However, during the Cycle 2 reload review, an error in the Inadvertent Boron Dilution Event analysis was identified.
As a result of'he reanalysis, the Technical Specification Amendment of the Reference'2).letter, concerning the Temperature Dependent-Shutdown Margin graph, required changing.Because of the change made to the Cycle 1 Shutdown Margin Technical Specification amendment graph the same change is required for the Cycle 2 graph.The justification for the change is given in the Reference (3)letter.The change to the Cycle 2 amendment is Specification changes and not the Cycle 2 justifications as discussed in the Reference graph requires replacement.
Attached is the the result of the Cycle 1 Technical reanalysis, therefore, the reasons and (1)letter remain the same and only the revised page.By copy of this letter, we are agency.also forwarding the revision to the appropriate state 8708260ih5 870820 PDR~ADQCK 05000528 p PDR oo4>)L I t I USNRC Document Control Desk Revision to Reload Technical Specification Amendment-Attachment 2, Shutdown Margin 161-00454 Page 2 August 20, 1987 Xf you have any questions, please call W.F.Quinn, at (602)371-4087.Very truly yours, 4 P~p.G.Haynes Vice President Nuclear Production JGH/LJM/ls Attachment cc: 0.M.E.E.A.C.J.R.J.B.G.N.E.A.C.E.De Michele (all w/a)Van Brunt, Jr.Gehr Ball Martin Knighton Licitra Tedford
~-li Ei tt}}

Latest revision as of 11:27, 29 October 2019

Forwards Revised Tech Spec Page,Consisting of Figure 3.1-1A, Shutdown Margins Vs Cold Leg Temp.
ML17300B011
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/20/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17300B012 List:
References
TAC-65693, NUDOCS 8708260165
Download: ML17300B011 (6)


Text

4 4

I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8708260165 DOC. DATE: 87/08/20 NOTARIZED: NO DOCKET 0 FACIL: STN-50-528 Palo Verde Nuclear Stations Unit ii Arizona Pub AUTH. NAME AUTHOR AFFILIATION li 05000528 HAYNES> J. Q. Arizona Nuclear Power ProJect (Formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards revised graph page to rev to reload Tech Spec amends Attachment 2i shutdown margin.

DISTRIBUTION CODE. AOOID COPIES RECEIVED, LTR ( ENCL J SIZE, ~ l TITLE: OR Submittal: General Distribution NOTES: Standardized plant. M. Davisi NRR: 1Cg. 05000528 RECIPIENT CQP IES RECIPIENT CQP IES ID CODE/NAME LTTR ENCL .

ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 LICITRAs E 1 1 DAVISi M 1 1 INTERNAL: ACR S 6 6 ARM/DAF/LFMB 1 0 NRR/DEST/ADS 1 1 NRR/DEST/CEB 1 1

. NRR/DEST/MTB 1 1 NRR/DEST/RSB 1 1 NRR/DOEA/TSB 1 1 N MAS/ ILRB 1 1 OQC/HDS1 1 0 FIL 01 1 1 RES/DE/EIB 1 EXTERNAL: EQhQ BRUSKEI 8 1 1 LPDR NRC PDR 1 1 NSIC NOTES: 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 26

/(

F

Arizona Nuclear Power Project P.o. BOX 52034 4 PHOENIX. ARIZONA 85072-2034 August 20, 1987 161-00454-JGH/LJM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mashington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 (License NPF-41)

Revision to Reload Technical Specification Amendment Attachment 2, Shutdown Margin File: 87-F-005-419.05 87-B-056-026

References:

1) Letter from J. G. Haynes (ANPP) to Document Control Desk (NRC) dated June 29, 1987 (161-00320),

Subject:

Reload Technical Specification Amendment.

2) Letter from J. G. Haynes (ANPP) to G. M. Knighton (NRC) Dated January 23, 1987.

Subject:

Technical Specification Amendment Sections 1.0, 2.2, 3/4.1, 3/4.3, 3/4.10.

3) Letter from J. G. Haynes (ANPP) to Document Control Desk (NRC) dated July 17, 1987 (161-00377).

Subject:

Revision to Technical Specification Amendment Sections 1.0, 2.2, 3/4.1, 3/4.3, 3/4.10.

Dear Sir:

At the time the Reference (1) letter was submitted, it was assumed that the Temperature Dependent Shutdown Margin Technical Specification Amendment, Revision 0, (Reference 2) would be approved and therefore the Shutdown Margin graph, of Fig.

3.1-1A would be used for Cycle 1 operation. Based on that assumption, the Cycle 2 Shutdown Margin amendment, Attachment 2 of the Reference (1) letter, was developed accordingly. However, during the Cycle 2 reload review, an error in the Inadvertent Boron Dilution Event analysis was identified. As a result Technical Specification Amendment of the Reference '2) of'he

. letter, reanalysis, the concerning the Temperature Dependent-Shutdown Margin graph, required changing. Because of the change made to the Cycle 1 Shutdown Margin Technical Specification amendment graph the same change is required for the Cycle 2 graph. The justification for the change is given in the Reference (3) letter.

The change to the Cycle 2 amendment is the result of the Cycle 1 Technical Specification changes and not the Cycle 2 reanalysis, therefore, the reasons and justifications as discussed in the Reference (1) letter remain the same and only the graph requires replacement. Attached is the revised page.

By copy of this letter, we are also forwarding the revision to the appropriate state agency.

8708260ih5 870820 oo4 PDR ~ ADQCK 05000528 p PDR

>)L

I t

I

USNRC Document Control Desk Revision to Reload Technical Specification Amendment Attachment 2, Shutdown Margin 161- 00454 Page 2 August 20, 1987 Xf you have any questions, please call W. F. Quinn, at (602) 371-4087.

Very truly yours, 4 P~ p

. G. Haynes Vice President Nuclear Production JGH/LJM/ls Attachment cc: 0. M. De Michele (all w/a)

E. E. Van Brunt, Jr.

A. C. Gehr J. R. Ball J. B. Martin G. N. Knighton E. A. Licitra C. E. Tedford

~-

li Ei tt