Line 15: |
Line 15: |
| | page count = 9 | | | page count = 9 |
| }} | | }} |
| See also: [[see also::IR 05000250/1981001]]
| |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:!~~)~'c 0 USNRO REOlox:: ATLANTA, GEORGIA+y(IAq~o>>FLORIDA POWER&LIGHT COMPANY April 20, 1981 L-81-174 Hr.Victor Stello, Director Office of Inspection | | {{#Wiki_filter:!~~)~'c 0 USNRO REOlox:: ATLANTA, GEORGIA+y(IAq~o>>FLORIDA POWER&LIGHT COMPANY April 20, 1981 L-81-174 Hr.Victor Stello, Director Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 |
| and Enforcement | | |
| U.S.Nuclear Regulatory | | ==Dear Hr.Stello:== |
| Commission | | Re: Turkey Point Unit 3 Docket No.50-250 10 CFR 2.201 Response to Notice of Violation dated Februar 18, 1981 PUG171983Ž-M I,HXQARiggATCel |
| Washington, D.C.20555 Dear Hr.Stello: Re: Turkey Point Unit 3 Docket No.50-250 10 CFR 2.201 Response to Notice of Violation dated Februar 18, 1981 PUG171983Ž-M I,HXQARiggATCel | | ~.IIOgg f/~)I I The attachment to this letter contains Florida Power 6 Light Company's reply to your letter and Notice of Violation of February 18, 1981 as required by 10 CFR 2.201.Our reply pursuant to 10 CFR 2.205 has been prov d d separately as requested. |
| ~.IIOgg f/~)I I The attachment | | Very trul yours, Robert E.Uhrig Vice President Advanced Systems and TectIno'logy REU/RAK/rnbd Attachment cc: I~Ir.J.P.O'Reilly, Region II Harold F.Reis, Esquire 810818028b 81042%0, PDR ADOCK 0500025'0'PQR,'EOPLE... |
| to this letter contains Florida Power 6 Light Company's reply to your letter and Notice of Violation of February 18, 1981 as required by 10 CFR 2.201.Our reply pursuant to 10 CFR 2.205 has been prov d d separately | | SERVING PEOPLE II I a+~!i II'0 it s/-\~p r I e II (~'e: Turkey Point Uni Docket Ho.50-250~10 CFR 2.201 Response to Notice of Violation dated February 18, 1981 Page 1 ATTACHMENT e~Findin: 10 CFR 50.54(k)states that an operator or senior operator licensed pursuant to Part 55 of this chapter shall be present at the controls at all times during operation of the facility.'echnical Specification 6.8.1 requires that written procedures and administrative policies be established, implemented and maintained that meet or exceed the requi rements and recommendations of Section 5.1 and 5.3 of ANSI N18.7-1972, Appendix"A" of USHRC Regulatory Guide 1.33;this includes plant operating procedures. |
| as requested. | | Plant Operating Procedure 0103.2, Responsibilities of Operators-On-Shift and Maintenance of Operating Logs and Records, states in Section 5.3.3 that the Nuclear Control Center Operator (NCCO)shall have an unobstructed view of and access to the control panels, including instrumentation displays and alarms.He shall not leave the Surveillance Area (Figure 1)for any non-emergency reason without obtaining a qualified relief.Section 5.3.4 states that a single operator shall not assume the HCCO responsibility for both units at the same time unless so directed and such action is in compliance wi th Technical Specification 6.2.2 or is necessitated by emergency conditions. |
| Very trul yours, Robert E.Uhrig Vice President Advanced Systems and TectIno'logy | | Contrary to the above, at about 11:45 a.m.on January 29, 1981, the HRC Resident Inspector observed Turkey Point Unit 3 operating at full power without an operator present at the controls.The assigned Unit 3 operator was in a room behind the Unit 4 instrument panels which precluded visually monitoring the Unit 3 reactor conditions. |
| REU/RAK/rnbd | | The room, although open to the control room, is outside the surveillance area specified in Plant Operating Procedure 0103.2.A qualified relief had not been obtained and an operator leaving the surveillance area was not necessitated by an emergency condition, nor was the Unit 4 operator directed to assume HCCO responsibilities for both units.~Res ense: 1.(1-1)FPL concurs with the finding, however, as discussed in our reply pursuant to 10 CFR 2.205, we take exception to the severity level classification. |
| Attachment | | The reason for the violation was that the Nuclear Control Center Operator (NCCO)did not adhere to the procedural requirement to obtain a relief prior to leaving the surveillance area.As corrective action: (1)The surveillance area has been re-defined and permanent red colored floor tiles have been installed to outline the.surveillance area boundary. |
| cc: I~Ir.J.P.O'Reilly, Region II Harold F.Reis, Esquire 810818028b | | P, Re: Turkey Point'Unit Docket Ho.50-250 10 CFR 2.201 Response to Notice of Violation dated February 18, 1981 Page 2 (2)Changes have been made to Administrative Procedure 0103.2,.Responsibilities of Operators On-Shift and Maintenance of Operating Logs and Records, which redefined the proper procedure which must be taken by the NCCO in order to leave the surveillance area.The third NCCO on shift is now required to normally stay in the surveillance area and to verbally notify and obtain acknowledgment from each operator with unit responsibility prior to leaving the surveillance area.e (3)(4)(5)A name display system has been implemented that positively identifies the operator who has unit responsibility. |
| 81042%0, PDR ADOCK 0500025'0'PQR,'EOPLE... | | In order to transfer unit responsibility from one operator to another, the name display must be changed by the oncoming operator as part of his turnover acknowledgement. |
| SERVING PEOPLE | | All operators have been instructed in wri'ting of their responsibilities. |
| II I a+~!i II'0 it s/-\~p r I | | Plant management has begun a program of random visits to the Control Room at unannounced intervals. |
| e II (~'e: Turkey Point Uni Docket Ho.50-250~10 CFR 2.201 Response to Notice of Violation dated February 18, 1981 Page 1 ATTACHMENT | | During these visits, the management will verify that the licensed operators are conti nui ng to perform thei r duties in a professional manner.(1-4)He will also take the following long and short term corrective actions to avoid similar problems in the future.Short term: The surveillance area boundaries will be redefined by April 30,-1981 to fully meet the intent of Regulatory guide 1.114 as discussed at the management meeting with IKE personnel. |
| e~Findin: 10 CFR 50.54(k)states that an operator or senior operator licensed pursuant to Part 55 of this chapter shall be present at the controls at all times during operation of the facility.'echnical Specification | | (2)*FP8L Management will conduct meetings with Licensed'perators by May 31, 1981 to emphasize the importance of this issue, to provide guidance on compliance with the Regulatory Guide, and to discuss management enforcement actions that will be taken should further deficiencies occur.(3)(4)Movable rope or chain barriers will be placed at appropriate openings to the surveillance'area boundaries by May 15, 1981 to give a more physical means of identifying the surveillance area and to limit access to this area by non licensed personnel.Plant management will conduct meetings with Licensed Operators to discuss Operator concerns, management policies, and Operator safety responsibilities. |
| 6.8.1 requires that written procedures | | .1~ |
| and administrative | | Re: Turkey Point Unit Docket No.50-250 10 CFR 2.201 Response to Notice of Violation dated February 18, 1981 Page 3 Long term: (1)A human factors engineering study of the Control Room layout will be conducted by January 1, 1982.(2)The Nuclear Match Engineer's offi ce will be modified by January.l, 1982 to allow him to see the control panels while in his office.(3)Other physical changes will be made to permanently re-locate such items as water fountains, chart lockers, bookcases and coffee pots in short term item 1, above.This will be accomplished by January 1, 1982.Immediate corrective action was taken on January 29, 1981, in response to the violation. |
| policies be established, implemented | | Additional corrective action, described in 1-3 above, was taken between January 30, 1981 and February 13, 1981.Additional short and long term cor-rective action to enhance compliance will be completed by the dates provided with each item in 1-4 above. |
| and maintained | | STATE OF FLORlDA))COUNTY OF DADE)ss.Robert E.Uhrig, being first duly sworn, deposes and says: I That he is a Vice President of Florida Power&Light Company,'the.Lic nsee herein;That he has executed the foregoing document;that the state-ments made in this said document are true and correct to the'best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.t Robert E.Uhrig Subscribed and sworn to before me this 9-C'ay of NOTARY PUBLIC, and for the county of Dade, State'of Florida Ho,erg Pub'.i", 8!s'o ol i.>.i;:a;.t Lnpo Pgy COmmiSSiOn eXPireS='ond d'.hru'A="...".ri'. |
| that meet or exceed the requi rements and recommendations | | %~,~.z~}} |
| of Section 5.1 and 5.3 of ANSI N18.7-1972, Appendix"A" of USHRC Regulatory | |
| Guide 1.33;this includes plant operating procedures. | |
| Plant Operating Procedure 0103.2, Responsibilities | |
| of Operators- | |
| On-Shift and Maintenance | |
| of Operating Logs and Records, states in Section 5.3.3 that the Nuclear Control Center Operator (NCCO)shall have an unobstructed | |
| view of and access to the control panels, including instrumentation | |
| displays and alarms.He shall not leave the Surveillance | |
| Area (Figure 1)for any non-emergency | |
| reason without obtaining a qualified relief.Section 5.3.4 states that a single operator shall not assume the HCCO responsibility | |
| for both units at the same time unless so directed and such action is in compliance | |
| wi th Technical Specification | |
| 6.2.2 or is necessitated | |
| by emergency conditions. | |
| Contrary to the above, at about 11:45 a.m.on January 29, 1981, the HRC Resident Inspector observed Turkey Point Unit 3 operating at full power without an operator present at the controls.The assigned Unit 3 operator was in a room behind the Unit 4 instrument | |
| panels which precluded visually monitoring | |
| the Unit 3 reactor conditions. | |
| The room, although open to the control room, is outside the surveillance | |
| area specified in Plant Operating Procedure 0103.2.A qualified relief had not been obtained and an operator leaving the surveillance | |
| area was not necessitated | |
| by an emergency condition, nor was the Unit 4 operator directed to assume HCCO responsibilities | |
| for both units.~Res ense: 1.(1-1)FPL concurs with the finding, however, as discussed in our reply pursuant to 10 CFR 2.205, we take exception to the severity level classification. | |
| The reason for the violation was that the Nuclear Control Center Operator (NCCO)did not adhere to the procedural | |
| requirement | |
| to obtain a relief prior to leaving the surveillance | |
| area.As corrective | |
| action: (1)The surveillance | |
| area has been re-defined | |
| and permanent red colored floor tiles have been installed to outline the.surveillance | |
| area boundary. | |
| P, | |
| Re: Turkey Point'Unit | |
| Docket Ho.50-250 10 CFR 2.201 Response to Notice of Violation dated February 18, 1981 Page 2 (2)Changes have been made to Administrative | |
| Procedure 0103.2,.Responsibilities | |
| of Operators On-Shift and Maintenance | |
| of Operating Logs and Records, which redefined the proper procedure which must be taken by the NCCO in order to leave the surveillance | |
| area.The third NCCO on shift is now required to normally stay in the surveillance | |
| area and to verbally notify and obtain acknowledgment | |
| from each operator with unit responsibility | |
| prior to leaving the surveillance | |
| area.e (3)(4)(5)A name display system has been implemented | |
| that positively | |
| identifies | |
| the operator who has unit responsibility. | |
| In order to transfer unit responsibility | |
| from one operator to another, the name display must be changed by the oncoming operator as part of his turnover acknowledgement. | |
| All operators have been instructed | |
| in wri'ting of their responsibilities. | |
| Plant management | |
| has begun a program of random visits to the Control Room at unannounced | |
| intervals. | |
| During these visits, the management | |
| will verify that the licensed operators are conti nui ng to perform thei r duties in a professional | |
| manner.(1-4)He will also take the following long and short term corrective | |
| actions to avoid similar problems in the future.Short term: The surveillance | |
| area boundaries | |
| will be redefined by April 30,-1981 to fully meet the intent of Regulatory | |
| guide 1.114 as discussed at the management | |
| meeting with IKE personnel. | |
| (2)*FP8L Management | |
| will conduct meetings with Licensed'perators by May 31, 1981 to emphasize the importance | |
| of this issue, to provide guidance on compliance | |
| with the Regulatory | |
| Guide, and to discuss management | |
| enforcement | |
| actions that will be taken should further deficiencies | |
| occur.(3)(4)Movable rope or chain barriers will be placed at appropriate | |
| openings to the surveillance'area | |
| boundaries | |
| by May 15, 1981 to give a more physical means of identifying | |
| the surveillance | |
| area and to limit access to this area by non licensed personnel.Plant management | |
| will conduct meetings with Licensed Operators to discuss Operator concerns, management | |
| policies, and Operator safety responsibilities. | |
| .1~ | |
| Re: Turkey Point Unit Docket No.50-250 10 CFR 2.201 Response to Notice of Violation dated February 18, 1981 Page 3 Long term: (1)A human factors engineering | |
| study of the Control Room layout will be conducted by January 1, 1982.(2)The Nuclear Match Engineer's | |
| offi ce will be modified by January.l, 1982 to allow him to see the control panels while in his office.(3)Other physical changes will be made to permanently | |
| re-locate such items as water fountains, chart lockers, bookcases and coffee pots in short term item 1, above.This will be accomplished | |
| by January 1, 1982.Immediate corrective | |
| action was taken on January 29, 1981, in response to the violation. | |
| Additional | |
| corrective | |
| action, described in 1-3 above, was taken between January 30, 1981 and February 13, 1981.Additional | |
| short and long term cor-rective action to enhance compliance | |
| will be completed by the dates provided with each item in 1-4 above. | |
| STATE OF FLORlDA))COUNTY OF DADE)ss.Robert E.Uhrig, being first duly sworn, deposes and says: I That he is a Vice President of Florida Power&Light Company,'the.Lic nsee herein;That he has executed the foregoing document;that the state-ments made in this said document are true and correct to the'best of his knowledge, information, and belief, and that he is authorized | |
| to execute the document on behalf of said Licensee.t Robert E.Uhrig Subscribed | |
| and sworn to before me this 9-C'ay of NOTARY PUBLIC, and for the county of Dade, State'of Florida Ho,erg Pub'.i", 8!s'o ol i.>.i;:a;.t | |
| Lnpo Pgy COmmiSSiOn | |
| eXPireS='ond d'.hru'A="...".ri'. | |
| %~,~.z~ | |
| }} | |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17348A5661990-09-14014 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. ML17348A5461990-09-0707 September 1990 Forwards 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities 900206-0404 First Refueling Outage Second Period Second Insp Interval. ML17348A5501990-09-0707 September 1990 Forwards Jul 1990 Integrated Schedule Regulatory Rept for Facilities ML17348A5521990-09-0606 September 1990 Forwards Matrix of Changes to Emergency Power Sys That Affect Revised Tech Specs Issued on 900828.Matrix Sent for Info & to Assist in NRC Review of No Significant Hazards Rept for Revised Tech Specs ML17348A5431990-08-31031 August 1990 Forwards Objectives for 901108 Emergency Plan Exercise. Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Not Be Evaluated by FEMA ML17348A5361990-08-27027 August 1990 Forwards Turkey Point Units 3 & 4 Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Health Physics Procedure HP-48, Process Control Program for Dewatering Radwaste Liners. ML17348A5171990-08-24024 August 1990 Forwards Ref Matl in Preparation for Operator License Exams Scheduled for Wk of 901029,per NRC 900628 Request ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 ML17348A5051990-08-15015 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Turkey Point Units 3 & 4 & Revise Rept for June 1990 for Unit 3 ML20059B0111990-08-14014 August 1990 Requests That Encl Intervenor Motion for Extension of Time to Appeal to Docketing & Svcs Branch Re Tech Spec Replacement Hearing Be Provided.Motion Inadvertently Omitted in Svc of Request on 900813 ML17348A4971990-08-10010 August 1990 Responds to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18.Corrective Actions:Unit Stabilized in Mode 3, Operating Surveillance Procedures 3/4-OSP-089 Revised & Event Response Team Formed ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing L-90-282, Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790)1990-07-25025 July 1990 Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790) ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17348A4691990-07-23023 July 1990 Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request ML17348A4191990-07-20020 July 1990 Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921 ML17348A4201990-07-20020 July 1990 Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per 890605 Ltr ML17348A4141990-07-20020 July 1990 Responds to Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14.Corrective Actions:Breakers Closed,Returning Monitoring Sys to Operable Level & Briefings Held to Explain Rvlms Sys Theory to Operations Control Room Personnel ML17348A4171990-07-19019 July 1990 Forwards May 1990 Integrated Schedule Regulatory Rept for Plant ML17348A4121990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML17348A4251990-07-17017 July 1990 Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition IR 05000250/19900131990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML20055G8641990-07-16016 July 1990 Informs ASLB That Petitioners Ref to Several Telephone Contacts Between J Butler & M Gutman,Of ATI Career Training Inst Is Inadvertent Misstatement & Should Be Changed to Telephone Contact. W/Certificate of Svc ML17348A4161990-07-16016 July 1990 Responds to Commitment Re Reverse Testing of Containment Isolation Valves Per Insp Repts 50-250/90-13 & 50-251/90-13. Corrective Action Plan Addresses Penetrations 16 & 53 for Unit 3 Only & Penetrations 11,47,54A & 54B for Both Units ML17348A4151990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML17348A4041990-07-12012 July 1990 Forwards Addl Info Re Responses to NRC Questions on Piping Codes Used for Emergency Power Sys Enhancement Project ML17348A3921990-07-12012 July 1990 Summarizes Facility Performance Since Last SALP Evaluation Period Which Ended 890731.Util Pursued Aggressive self- Assessment Program,Including Significant Internal or Outside Assessments in Areas of Operator Performance & EOPs L-90-261, Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld1990-07-11011 July 1990 Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld L-90-259, Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3))1990-07-11011 July 1990 Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) ML17348A4321990-07-11011 July 1990 Forwards Rev 8 to Updated FSAR for Turkey Point Units 3 & 4. Rev Includes Activities Completed Between 890123 & 900122. Rept of Changes for Jul 1989 Through June 1990 Will Be Provided by 900901 ML17348A3941990-07-0909 July 1990 Forwards Requested Addl Info Re Emergency Power Sys Enhancement Project.Specific Detailed Changes Will Be Made to Procedures to Address Mods Affecting Equipment Relied Upon for Safe Shutdown ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17348A4311990-07-0505 July 1990 Documents Written & Verbal Request of Region II Personnel for Temporary Waiver of Compliance of Tech Spec 3.4.2.b.1 Re Allowable Out of Svc Time for One Emergency Containment Cooler from 24 H to 72 Hr W/Addl Reasons ML17348A3851990-07-0303 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/90-08 & 50-251/90-08.Corrective Actions:Training Dept Increased Emphasis on Radiological Postings in Radiation Worker Training ML17348A3711990-07-0303 July 1990 Responds to NRC 900524 Request for Addl Info on Emergency Power Sys Enhancement Project ML17348A3671990-07-0303 July 1990 Confirms Util Intentions Not to Operate Beyond Refueling Outage That Represents Last Outage Re NRC Bulletin 89-001 ML17348A3841990-06-29029 June 1990 Forwards LER 90-11 on 900609 Re hi-hi Steam Generator Water Level Turbine Trip & Subsequent Reactor Trip Due to Failure of Switch in Feedwater Valve Controller Hand/Auto Station. W/O Encl ML17348A3601990-06-29029 June 1990 Responds to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. Test Procedures Developed & Under Mgt Review Reflecting Revised Inservice Testing Program ML17348A3621990-06-28028 June 1990 Notifies That Senior Operator License SOP-20177-2 Will Be Terminated,Effective 900731 ML17348A3651990-06-28028 June 1990 Advises That Completion of safety-related motor-operated Valve Testing & Surveillance Will Be Completed by June 1990, Per Generic Ltr 89-10 Requirements ML17348A3591990-06-27027 June 1990 Responds to Violations Noted in Insp Repts 50-250/90-09 & 50-251/90-09.Corrective Actions:Specialist Counselled on Importance of Stopping Procedure When Steps Conflict W/ Condition of Plant & Procedure Use Guidelines Reviewed ML17348A3641990-06-27027 June 1990 Responds to Generic Ltr 90-04, Status of Licensee Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions. ML17348A3861990-06-27027 June 1990 Advises That New Date for Submittal of Response to Insp Repts 50-250/90-09 & 50-251/90-09 Is 900702 ML17348A3551990-06-21021 June 1990 Responds to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Five Untraceable Circuit Breakers Installed in Unit 3 safety-related Sys.All Five Breakers Replaced W/Traceable Breakers ML20055D9201990-06-20020 June 1990 Advises That Sp Frantz Will Represent Licensee in Argument Scheduled for 900710.Certificate of Svc Encl ML17348A3181990-06-19019 June 1990 Forwards Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects for Turkey Point Nuclear Power Plant, Per NRC Bulletin 88-008 ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17348A2871990-06-0808 June 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S350W Swing Check Valves or Valves of Similar Design. Bolt Replacement Performed ML17348A2861990-06-0808 June 1990 Advises That Info Re Operating History of Select Fuel Assemblies Sent to ORNL Between 900419 & 26,per 900510 Request ML17348A2781990-06-0404 June 1990 Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info 1990-09-07
[Table view] |
Text
!~~)~'c 0 USNRO REOlox:: ATLANTA, GEORGIA+y(IAq~o>>FLORIDA POWER&LIGHT COMPANY April 20, 1981 L-81-174 Hr.Victor Stello, Director Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555
Dear Hr.Stello:
Re: Turkey Point Unit 3 Docket No.50-250 10 CFR 2.201 Response to Notice of Violation dated Februar 18, 1981 PUG171983Ž-M I,HXQARiggATCel
~.IIOgg f/~)I I The attachment to this letter contains Florida Power 6 Light Company's reply to your letter and Notice of Violation of February 18, 1981 as required by 10 CFR 2.201.Our reply pursuant to 10 CFR 2.205 has been prov d d separately as requested.
Very trul yours, Robert E.Uhrig Vice President Advanced Systems and TectIno'logy REU/RAK/rnbd Attachment cc: I~Ir.J.P.O'Reilly, Region II Harold F.Reis, Esquire 810818028b 81042%0, PDR ADOCK 0500025'0'PQR,'EOPLE...
SERVING PEOPLE II I a+~!i II'0 it s/-\~p r I e II (~'e: Turkey Point Uni Docket Ho.50-250~10 CFR 2.201 Response to Notice of Violation dated February 18, 1981 Page 1 ATTACHMENT e~Findin: 10 CFR 50.54(k)states that an operator or senior operator licensed pursuant to Part 55 of this chapter shall be present at the controls at all times during operation of the facility.'echnical Specification 6.8.1 requires that written procedures and administrative policies be established, implemented and maintained that meet or exceed the requi rements and recommendations of Section 5.1 and 5.3 of ANSI N18.7-1972, Appendix"A" of USHRC Regulatory Guide 1.33;this includes plant operating procedures.
Plant Operating Procedure 0103.2, Responsibilities of Operators-On-Shift and Maintenance of Operating Logs and Records, states in Section 5.3.3 that the Nuclear Control Center Operator (NCCO)shall have an unobstructed view of and access to the control panels, including instrumentation displays and alarms.He shall not leave the Surveillance Area (Figure 1)for any non-emergency reason without obtaining a qualified relief.Section 5.3.4 states that a single operator shall not assume the HCCO responsibility for both units at the same time unless so directed and such action is in compliance wi th Technical Specification 6.2.2 or is necessitated by emergency conditions.
Contrary to the above, at about 11:45 a.m.on January 29, 1981, the HRC Resident Inspector observed Turkey Point Unit 3 operating at full power without an operator present at the controls.The assigned Unit 3 operator was in a room behind the Unit 4 instrument panels which precluded visually monitoring the Unit 3 reactor conditions.
The room, although open to the control room, is outside the surveillance area specified in Plant Operating Procedure 0103.2.A qualified relief had not been obtained and an operator leaving the surveillance area was not necessitated by an emergency condition, nor was the Unit 4 operator directed to assume HCCO responsibilities for both units.~Res ense: 1.(1-1)FPL concurs with the finding, however, as discussed in our reply pursuant to 10 CFR 2.205, we take exception to the severity level classification.
The reason for the violation was that the Nuclear Control Center Operator (NCCO)did not adhere to the procedural requirement to obtain a relief prior to leaving the surveillance area.As corrective action: (1)The surveillance area has been re-defined and permanent red colored floor tiles have been installed to outline the.surveillance area boundary.
P, Re: Turkey Point'Unit Docket Ho.50-250 10 CFR 2.201 Response to Notice of Violation dated February 18, 1981 Page 2 (2)Changes have been made to Administrative Procedure 0103.2,.Responsibilities of Operators On-Shift and Maintenance of Operating Logs and Records, which redefined the proper procedure which must be taken by the NCCO in order to leave the surveillance area.The third NCCO on shift is now required to normally stay in the surveillance area and to verbally notify and obtain acknowledgment from each operator with unit responsibility prior to leaving the surveillance area.e (3)(4)(5)A name display system has been implemented that positively identifies the operator who has unit responsibility.
In order to transfer unit responsibility from one operator to another, the name display must be changed by the oncoming operator as part of his turnover acknowledgement.
All operators have been instructed in wri'ting of their responsibilities.
Plant management has begun a program of random visits to the Control Room at unannounced intervals.
During these visits, the management will verify that the licensed operators are conti nui ng to perform thei r duties in a professional manner.(1-4)He will also take the following long and short term corrective actions to avoid similar problems in the future.Short term: The surveillance area boundaries will be redefined by April 30,-1981 to fully meet the intent of Regulatory guide 1.114 as discussed at the management meeting with IKE personnel.
(2)*FP8L Management will conduct meetings with Licensed'perators by May 31, 1981 to emphasize the importance of this issue, to provide guidance on compliance with the Regulatory Guide, and to discuss management enforcement actions that will be taken should further deficiencies occur.(3)(4)Movable rope or chain barriers will be placed at appropriate openings to the surveillance'area boundaries by May 15, 1981 to give a more physical means of identifying the surveillance area and to limit access to this area by non licensed personnel.Plant management will conduct meetings with Licensed Operators to discuss Operator concerns, management policies, and Operator safety responsibilities.
.1~
Re: Turkey Point Unit Docket No.50-250 10 CFR 2.201 Response to Notice of Violation dated February 18, 1981 Page 3 Long term: (1)A human factors engineering study of the Control Room layout will be conducted by January 1, 1982.(2)The Nuclear Match Engineer's offi ce will be modified by January.l, 1982 to allow him to see the control panels while in his office.(3)Other physical changes will be made to permanently re-locate such items as water fountains, chart lockers, bookcases and coffee pots in short term item 1, above.This will be accomplished by January 1, 1982.Immediate corrective action was taken on January 29, 1981, in response to the violation.
Additional corrective action, described in 1-3 above, was taken between January 30, 1981 and February 13, 1981.Additional short and long term cor-rective action to enhance compliance will be completed by the dates provided with each item in 1-4 above.
STATE OF FLORlDA))COUNTY OF DADE)ss.Robert E.Uhrig, being first duly sworn, deposes and says: I That he is a Vice President of Florida Power&Light Company,'the.Lic nsee herein;That he has executed the foregoing document;that the state-ments made in this said document are true and correct to the'best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.t Robert E.Uhrig Subscribed and sworn to before me this 9-C'ay of NOTARY PUBLIC, and for the county of Dade, State'of Florida Ho,erg Pub'.i", 8!s'o ol i.>.i;:a;.t Lnpo Pgy COmmiSSiOn eXPireS='ond d'.hru'A="...".ri'.