ML18106A828: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.. PROGRAM: MODULE: TITLE: REVISION:
HOPE CREEK OPERATIONS QUALIFICATION GUIDE AND IMPLEMENTATION PLAN HOPE CREEK INITIAL LICENSE TRAINING (REACTOR OPERATOR or SENIOR REACTOR OPERATOR)
N/A REACTIVITY MANIPULATIONS DOCUMENTATION GUIDE. 01 2 .. REVIEWED BY: ;;>
Qpefations 7 APPROVED BY: <"
.. G<-(!* rlnve?".i SupervlSOr
-HC Licensed Operator Training IMPLEMENTATION PLAN: The following contains signature slots for representative methods of reactivity manipulation.
A minimum of five (5) signatures 1 is required.
manipulation methods contained in the tables allow for a varying number of repeat performances of the : I same method. Do not use the ''write in" section to duplicate a manipulation method already contained in the table. : Prior to utilizing the "write in" section, contact the Supervisor of Licensed Operator Training to ensure the manipulation meets ; j the intent of 1 OCFR55.31.
I 9808260121 980810 PDR ADOCK 05000272 V PDR Page 1 oi a Rev.: 01 QUALJFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LJCENSE CANDIDATES SECTION I GENERAL NAME: SSN: CARD TITLE: REACTIVITY MANIPULATIONS DOCUMENTATION GUIDE REV# 01 PROGRAM: 0302 I 0304 OBJECTIVE This Guide is utilized to document the 10CFR55.31 (a) (5) requirement for significant reactivity manipulations that states in part "Provide evidence that the applicant, as a trainee, has successfully manipulated the controls of the facility for which a license is sought. At a minimum, five significant control manipulations must be performed which affect reactivity or power level." We are defining a reactivity manipulation as a controlled evolution that results in a reactor power, temperature, and/or pressure change clearty observable on control room instrumentation.
The following two tables define acceptable methods to meet the 1 OCFR55.31 requirement for your license. There is room at the end of each table for additional evolutions involving special tests or non-routine evolutions
*. These ''write-in" manipulations should be reviewed by an SRO and the Supervisor of Ucensed Operator Training to ensure they meet the intent of 1 OCFRSS.31 (a) (5). REFERENCES
: 1. NUREG 1021, OPERATOR LICENSING EXAMINATION STANDARDS FOR POWER REACTORS 2. 10CFR55, OPERATOR'S LICENSES 3. IN FAILURE TO SATISFY REQUIREMENTS FOR SIGNIFICANT MANIPULATIONS OF THE CONTROLS FOR POWER REACTOR OPERATOR LICENSING TASK 1. COMPLETE REQUIREMENTS OF 1 OCFR55.31 (a)(S) c__ ____________
-Page 2 :r 3 Rev.: :;
QUALIFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES SECTION II REACTIVITY MANIPULATIONS A. Prerequisite Courses/Qualifications A licensed operator must supervise reactivity manipulations.
To obtain credit for a given manipulation, you must be "at the controls." A SRO in training is not qualified to supervise a reactivity manipulation, therefore no credit for supervision can be given. Satisfactory completion of the following items is required prior to performing ANY reactivity manipulations'.
FOR REACTIVITY MANIPULATIONS WITH THE REACTOR MODE SWITCH IN "STARTUP" (OP CON 2): SATISFACTORY COMPLETION OF STARTUP CERTIFICATION AS DESCRIBED IN NC. TQ-TC.ZZ-0302(Z).
FOR REACTIVITY MANIPULATIONS WITH THE REACTOR MODE SWiTCH IN "RUN" (OP CON 1): TRAINING IN THE CLASSROOM AND SIMULATOR HAS BEEN COMPLETED FOR THE FOLLOWING SYSTEMS, INCLUDING THEORY OF OPERATION, CONTROLS, & INDICATIONS:
-REACTOR RECIRCULATION
-REACTOR RECIRCULATION FLOW CONTROL -POWER RANGE NEUTRON MONITORING (LPRMs, APRMs, & ABM) -REACTOR MANUAL CONTROL -CONTROL ROD DRIVE HYDRAULICS B. Pre-Evolution Brief SUPERVISOR
-LICENSED DATE OPERATOR TRAINING SUPERVISOR*
LICENSED DATE OPERATOR TRAINING 1. Prior to performing ANY reactivity manipulation, a pre-evolution brief shall occur. At a minimum, this brief will cover the following:
: a. Intent of the evolution to be performed.
: b. Precautions, prerequisites and initial conditions applicable to the evolution.
: c. Termination criteria applicable to the evolution.
: d. Identification of the Licensed Operator in charge of the evolution.
: e. Any knowledge items (such as the importance of doubling, indications of POAH) important to the evolution.
: 2. The Licensed Operator in charge of the evolution will maintain constant surveillance of the trainee during the evolution, and terminate the evolution if plant conditions warrant. C. Document all reactivity manipulations on Attachment
: 1. D. Post-Evolution De-Brief At the completion of the evolution, the Licensed Operator in charge will formally relieve the trainee of the watch ensuring positive control of the reactor. Page 3 of a Rev.: 01 QUALIFICATION GUIDE FOR REACTIVITY.MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.
ATIACHMENT 1
.*
1* 'H"''E CRIT.CRIA . i . SIGNATURE OF ... START TIME::* E:ND TIME & :: :powi:R AT POWER AT 1(. .. * ._. ** "'. . .... , '"" l..IGENSEO OPERATOR & PATE DAT!: . START END TAKE THE REACTOR CRITICAL USING CONTROL RODS AND EXT ABLISH A HEAT UP RATE. (OP REACTOR POWER CHANGES FROM A ST ABLE NEUTRON COUNT RATE TO INCREASING COUNT RATE WITH A STABLE REACTOR PERIOD. REACTOR POWER CHANGE SUFFICIENT TO ESTABLISH A HEATUP RATE. 1-----------1-----+---*-------*--*-------------
1--------------1------4------t----------
--*-----**--
1-----------t------4-------
*-------------<
REDUCTION POWER OF AT LEAST 5%, AS (OP CON 1) INDICATED BY: APRMs; CORE THERMAL POWER; OR OD-3 PROGRAM.
*-----------.. *-----* 1--------------+-----1-------
-----*>-------
-------*---------. -**---** -. ----... _____ .. *------------*----.. -*-
____ .J.. ________ -** -------------'------
NOTE: ATTACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS. . Page 4 ol 8 Rev.: 01 QUALIFICATION GUIDE FOR . REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.
ATTACHMENT 1
l".;;.HOP.
":* ,--..... ., .... ACCL* 'I ;.I. 'E CRITt:RiA. . . . SIGNATUAJ:
OF START TIME . ENO.TIMi:
& .. :POWER AT POWER AT . .
* mt-* . -' * ',,,
OPERATOR & PAT!= DATE START
* ENO CORE FLOW INCREASE (OP CON 1) ASE IN REACTOR ANINCRE POWERO INDICATE THERMAL PROGRA FAT LEAST 5%, AS D BY: APRMs; CORE POWER; OR OD-3 M. -------*--***
-*----+----
ASE IN REACTOR INDIVIDUAL CONTROL ROD MANIPULATION (WITHDRAWAL) (OP CON 1) FAT LEAST 5%, AS D BY: APRMs; CORE AN INCRE POWERO INDICATE THERMAL PROGRA POWER; OR OD-3 M. ***---*---
--* ------
,_ NOTE: ATIACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS.
-----------
----------------Page 5 of B Rev.: 01
* QUALIFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.
ATTACHMENT 1 .H .. bO . *:. '.'* ACCr 1*1 ",
* E CRITERIA ' SIGNATURE OF. START TIME ENO POWER AT rOWER AT :.:*:*(* . .. *. . . . . " . LICENSED OPERATOR & DATE . DATE . . START t::ND INDIVIDUAL CONTROL ROD MANIPUI ATION (INSERTION) (OP CON 1) A DECREASE IN REACTOR POWER OF AT LEAST 5%, AS INDICATED BY: APRMs; CORE THERMAL POWER; OR OD-3 PROGRAM. 1------------1-------1---------***-
----------+-------
1---------------t-----f--------
-----------------l-----*--------1------
-----*--------------*-----*-------
--------****
___
PATTERN PATTERN EXCHANGE AS EXCHANGE DEFINED BY THE REACTOR (OP CON 1) ENGINEER WHICH RESULTS IN MOVEMENT OF A MINIMUM OF EIGHT (8) CONTROL RODS. 1-----------+-----f--------
-----------.. **--** 1------------*-----1---------
1-------------1-------+---*--*--
------------.. -----l------------+-------1-----
-----*-* -*--------!-----
.. --**-* -------**
*--... *--*-----------'----------L------'-------
NOTE: ATTACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS.
Page 6 of 8 Rev.: 01 QUALIFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY.MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.
ATTACHMENT 1 , **; .,.ucT.HO*P*
.. *:-.7 ... .,.. .. ;: *** .ACC :i 1 "r" E . . * .. '
OF . *:-START TIME '' **.i:No TiMI: & ..
AT PtWJER AT . : .. ::*:* **
* ' r-. " ,__, 1-ICENSEQ OPERATOR & OAT!= . , : START END A COMBINATION OF CONTROL ROD MANIPULATIONS AND CORE FLOW INCREASE (UP CON i) A COMBINATION OF CONTROL ROD MANIPULATIONS AND CORE FLOW DECREASE (OP CON 1) REACTOR AN INCREASE IN POWEROFATL INDICATED BY: EAST 5%,AS THERMAL POW PROGRAM. APRMs; CORE ER;OR OD-3 REACTOR LEAST 5%, AS A DECREASE IN POWER OF AT INDICATED BY: THERMAL POW PROGRAM. APRMs; CORE ER; OR OD-3 ... -* -*--------*-----*-------*
i-----------
-------------**-NO r l:: ATTACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS.
.. ------*--*-
-*----------*
*-*-Page 7 of 8 Rev.: 01 QUALIFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.
A TT AC HM ENT 1
:** .*ii ACC i. ***CE CRITERIA . -SIGNATURE OF *START TIME. ENO TIME & 'POWl=R AT P(lWER AT kr.-. ... . ..-. 1 * .. ,. *! l ''1 * -. l-ICENSEP OPERATOR : & PATE !: DATE *
* START END . WAITE-IN MANIPULATIONS
_____ _ --------------------------+---------t-----l-----'------
___ ,___ _________
_ -------
-----------------------------t----------t-----t-----
----____________________ .L-_______ _.__ ___ ----1. __ ---,--__ __._ _____
NOTE: ATTACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS.
Page 8 of 8 Rev.: 01 
'' QUALIFICATION GUIDE SIGNIFICANT CONTROL MANIPULATIONS FOR RO/SRO INITIAL LICENSE OPERATIONS QUALIFICATION GUIDE ANO IMPLEMENTATION PLAN APPROVAL PAGE PROGRAM: INITIAL LICENSE TRAINING REACTOR OPERATOR OR SENIOR REACTOR OPERATOR MODULE: NIA TITLE: REACTIVITY MANIPULATIONS DOCUMENTATION GUIDE REVISION:
2 PREPARED SY: DATE: REVIEWED BY: DATE: APPROVED BY: DATE: APPROVED BY* DATE: IMPLEMENTATION PLAN: q/..,/92 W/f7 q /'i/97 I I '""-'91= A minimun1 of arc n;quircd lo ma:t lhr.: conditions for your Significant control mampulation methoch contained in the tabla allow for twO repeat performances of the same method. The inicial condition:;
associated with I.he PERFORMANCE STANDARD shall be entered i" <he .. l'NITIAL CONDITION" block prior to performing lJtc maniput.tion.
Ind entered in tht "'FINAL CONDITION" bloct u completion.
TRG CHAIRPERSON:
___
..........
9808260125 980810 PDR ADOCK 05000272 V PDR OATE:Jji/_97 PAGE 1OF5 REVISION 2 
.. QUALIFICATION GUIDE SIGNIF1CANT CONTROL MANIPULATIONS FOR ROISRO INITIAL LICENSE NAMF.: CARD TITLE aaCTION I Gl!Nl!llAL REACTMTY MANIPULATIONS OOCUMENTATION GUIDE OBJECTIVE IU;V# 2 Thts Gulde le utillad to document the 10CFRH.l1
(*) (5) NqiiilwaNnta for algniflcant manipulatians at th* cantra wnich statM in part "Prcwide evtdenc9 tMt tM applicant, a a train*, has succlUfully maniputated th* contr"OW of tM fKilfty far which a* llc9ftM i. sought. At a minimum, ftv* significant control manipulation*
mat be wheh dect ruc:UYlly or pow!' level." REFERENCES
: l. NUREG*1021.
EXAMINER STANDARDS
: 2. 10CFR55 3. IN 97-67 TASK I. COMPLETE REQUIREMENTS Of: 10CFR55.31
[a) lS) PAGE 2 OF 6 REVlSION 2 
.. QUALIFICATION GUIDE SIGNIFICANT CONTROL MAN IP ULA TIONS FOR RO/SRO INITIAL LICENSE SICTION II IOCOWLeDGI!
UQUIR2Mun"S A. PREREQUISITES COURSESIOUAUFICATIONS Significant ccntrct manipulations must be by ii licensed operator.
To ocmm credit for a given man1pull0on, you must be *at tl'le controls.*
An SRO in tra1n1ng is not quaifl8d to a 51gnlficant control manipulation, therefore no credit for 1upcrvi*ion can b11 given. Satisfadcly oampletion of the follow1ng items i1 required pfior to performing ANY lignifieant control manipulaticn9.
SATISFACTORY COMPLETION OF STARTUP CERTIFICATION AS DESCRIBED IN TP-302. YOUR NAME MUST APPEAR ON THE *MANIPULATION OF FACILITY CONTROLS.
LETIER ISSUED 8Y THe MANAGER OF SALEM OPERATIONS.
B. PRE-EVOLUTION BRIEF SUPEIMSOR
* LICENSED ll'. TE OPERA TOR SUPERVISOR
-llaNSED CATE OPERATOR TRAINING Pnor to performing ANY significant control manipulation.
a pra-evoMion bnef shaH occur. At a minimum. this brief will cover the folowing:
: 1. Intent of the 9YDIUtiOn to be petfclmed.
: 2. Pracauticos.
prefeqUisrtes Ind tnttial conditions applicable to the evolution.
: 3. Termination crit8r1a to the .wlutian.
: 4. ldentiftcation of the Licensed Operator in charge of the evoMion. 5. Arly knowledge items (such as the importance Of doubling.
indications of POAH. control charaa.nstics of the main turbine ftir time of core life) important to the evolution.
The Licensed Operater in charge of the evolution will maintain constant surveillance of the trainee during the evolution.
and terminate tne evotution if plant conditions warrant C. POST -EVOttmON DE-BRIEF At the comp\eticn of the WOlution.
the Licensed Operalor in charge will formally relieve the trainee of the watcn ensuring pmitMI c:cotrol of the reactor and plant.
* PAGE 3 5
,.,.....-.. -
UACTOR OOWff. PONER MANEUVER*
CONTROL ROD$ QUALIFICATION GUIDE SIGNIFICANT CONTffOL MANIPULATIONS FOR RO/SRO INITIAL LICENSE WITH THE REA IN MODE 2 OR LESS, A REACTOR STMTUP TiR TMAH :Z.. POWeR wrTH THE TUA9N AT t IOO M'M OR LESS, SYlilCMRC>NIZE THE GEHERATORAHD RAJSE LOAD TO A ELECTIUCAL OUTPUT OF GREATER THAN 120 lilW9 WITH AT 1IDD RPM OR LESS. SYfitCl<<ONIZE THE GEN!RA'Tal AtilO AAISE I.CAD TO A flNAL ELECTRICAL OUTPUT OF GREATER THAN 1zo MW9 WITH THE REACTOR AT GREATER POWER. SHUTDOWN THE REACTOR TO MOOE3 WITM TME GINERATCR AT GREATIA l1WI IO MW9, SHUl"DOWN
'r\IMN!!*
GENERATOR TO OFF E WITM THE GENERATOR AT GQATER 1*N IO MWe. SHUTDOWN TURIM* G!JEMTOR TO OFF-LIN! WITH R00 CQN'T1Q. IN Mi&Nl.!M, A POWER REDUCTION OF '"'&deg; OR GREATER USING COHTROl ROO IN8E'"1QN CM. Y. REAC"&deg;" POWEft REDUCTION OF 5"' OR GAEATER USING CVCS IOAATION CONTRO\. ONlY. AE.ACTOR POWER REDUCT OF 5"' OR GREATER USING eves BORA T10N ONLY. PAGE 4 OF 6 REVISION 2 QUALIFICATION GUICE SIGNIFICANT CONTROL MANIPUL.A TIONS FOR ROISRO INITIAL LICENSE ' < METHOD f'[Rf ORi,'ANC[
DAT[ INITl/\l rt"JAL UCCNSEO POWER T1JR81NE REACTOR UP* POWER CONTROl ROOS FEEDWATER CONTROL IN MANUM. CURING STAATIJP ST Al':JOARD CONDITION CONDITION OPERATOR ... 1 ... .i
* wrTH ROO COHTROL IN REACTOR POWER RISE 5% OR GREATER U8'NG CONTROC. ROD W Y. WITH ROD CONTMQl IN POWER
.. OR GIUATER USING CONTROL ROD WJTHDRAWAl.
ONl.Y. REACTOR POWER RISE OR GREATeR USlNG CVCS DILUTION CONTROl ONI. Y. GENERATOR OUTPUT lltllE BY '"' UTIUZING REFEMNCE INCAIASEIDECAEASE OR T\JRllNE MlNUAL CONTROl. *WITH AT I.EAST ONE SIG IN IMNI IAl. CONTROL , MAINTAIN RECUIR&D SIG LEVEL DURING A Pl..ANT STM'T\IP F9'0U YOOe 2 TO GlltfATER 11oWi1 PAGE 5 OF 6 REVISION 2 QUALIFICATION GUIDE SIGNIFlCANT CONTROL MANIPULATIONS FOR RO/SRO INITIAL LICENSE < IV:L TH08 '-':....--<r
,)Rr.lANC[
DATE INITIAL FINAL l.ICFNSfO COtlTROL IN MANUAL SHUTDOWN FEEDWATER CONTROL IN DURINGA POWER MANEUVER FEEDWATER CONTROL IN MANUAL CURINGA P\.ANTUP POW!R PMNEUVER '-i I A 'J()t..RfJ CONDITION CONDI f!ON OPE:.HA TOR MMUAL CCNT9'0L , MAINTAIN R!QUIReD Ml LEWI. DURING A l'l.ANT*SHUTDOWN FROM GREATER nwl 2"' REACTOR POWER TO ..:ioE 3. WITH AT LEAST ON! SIG IN IUMUAL COllffROl , awN'TAIN REQUIRED SIG LEVEL DURING A P\NfT SHUTDOWN FROM OAEATER THAN 2" AEACTOR POW!llll TO MOD! 3. WITH AT LEAST OHE SIG IN AIWftJAl.
CCINTROl
* tMINT""" REQUIRED SIG L!VEL DURING A PLMT DOWN POWER WUE1NER OF ... Oft CREATER WITH AT LEAST ONE IN MA.MJAL CON'TN)L.
llllEQUIR!D SIG OUlllllHG A PlANT DOWN PONER MANaNER CA GREATER WITH AT LEAST ONE SIG IN MANUAL CCNTAOL.
REQUIRED SIG l.EV!l. DURING A PlNfT UP POWER MANElNER CF ft OR GftEATER WITH AT LEAST ONE SIG IN MANUAL. CONTl'Q. , MAINTAIN REQUIAED SIG LEVEL DURING A P\NfT UP POWER OR GREATER 
. ATTACHMENT 1 (Page 3 of 3)
* Transient and Accident Analysis
* Operational Experience and Modifications NC. TQ-TP.ZZ-0302
* Pre-License Audit Examination (prepared and conducted by trainers other than the instructors who taught the course and given at the end of the module. The trainee will spend a minimum of 13 weeks on-shift comprised of a minimum of 520 hrs of the operating experience module as extra person on shift in training . for that position.
During this time, the trainee shall be under the direct supervision of on-shift licensed personnel.
Additionally, each trainee will be responsible for completing Checkout Cards performance items and system checkouts as scheduled.
Scheduling of checkouts by NTC instructors should . have the concurrence of the SNSS and should not impact trainee involvement in plant operations.
The remainder of this module, will be divided between the classroom and the simulator.
Satisfactory progress must be maintained by the trainee as stated in section 4.5. MODULE IV -NRC Examination Preparation (Duration 4 Weeks) Prerequisites
: 1. Completion of the appropriate Salem or Hope Creek NEO program. Topics The audit examination results are to be analyzed to identify any individual or generic weaknesses.
The NRC Examination Preparation Module addresses these weaknesses prior to the NRC Examination.
The contents of this module will be developed by the Lead Instructor
-Salem or Hope Creek Replacement License Tra_ining, as appropriate, and will be approved by the Training Super&#xa5;1sor
-Salem or Hope Creek License Operator Training, as appropriate.
Plant management should evaluate each candidate regarding these problem areas. This evaluation shall occur prior to submission of the NRC license application (Form NRC-398).
It should ensure that performance problems have been corrected, and it shall re-establish the need for the candidate to perform license duties at the plant. Documentation of all Post-Audit training should be maintained with the course record. NUCLEAR corvlMON QUALIFICATION CHECKOUT CARD (Continuation)
Hope Creek Senior Reactor Operator Training Program Hope Creek SRO IL T Operating Experience . Hope Creek SRO QCC WA TCHSTANDING ITEMS Action Code Given the assignment, COMPLETE a minimum of 13 weeks or 520 hours (which ever P is longer) with a minimum of 6 weeks at greater than 20% reactor power as an extra person on shift in the training program for the senior reactor operator position.
From To Shift Avg* Date 'lime Date T"IDle *Hours Pwr* Crew* Oneradons Suoerintendent I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I .-*-. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Total hours/weeks On-Shift:
;:\hc_ops\1askmlr\hopqcard.mdb 13 or 15 Rcvmon : : --------------------------}}

Revision as of 07:32, 13 December 2018

Rev 1 to Reactivity Manipulations Documentation Guide.
ML18106A828
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 03/04/1998
From:
Public Service Enterprise Group
To:
Shared Package
ML18106A827 List:
References
PROC-980304, NUDOCS 9808260121
Download: ML18106A828 (16)


Text

.. PROGRAM: MODULE: TITLE: REVISION:

HOPE CREEK OPERATIONS QUALIFICATION GUIDE AND IMPLEMENTATION PLAN HOPE CREEK INITIAL LICENSE TRAINING (REACTOR OPERATOR or SENIOR REACTOR OPERATOR)

N/A REACTIVITY MANIPULATIONS DOCUMENTATION GUIDE. 01 2 .. REVIEWED BY: ;;>

Qpefations 7 APPROVED BY: <"

.. G<-(!* rlnve?".i SupervlSOr

-HC Licensed Operator Training IMPLEMENTATION PLAN: The following contains signature slots for representative methods of reactivity manipulation.

A minimum of five (5) signatures 1 is required.

manipulation methods contained in the tables allow for a varying number of repeat performances of the : I same method. Do not use the write in" section to duplicate a manipulation method already contained in the table. : Prior to utilizing the "write in" section, contact the Supervisor of Licensed Operator Training to ensure the manipulation meets ; j the intent of 1 OCFR55.31.

I 9808260121 980810 PDR ADOCK 05000272 V PDR Page 1 oi a Rev.: 01 QUALJFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LJCENSE CANDIDATES SECTION I GENERAL NAME: SSN: CARD TITLE: REACTIVITY MANIPULATIONS DOCUMENTATION GUIDE REV# 01 PROGRAM: 0302 I 0304 OBJECTIVE This Guide is utilized to document the 10CFR55.31 (a) (5) requirement for significant reactivity manipulations that states in part "Provide evidence that the applicant, as a trainee, has successfully manipulated the controls of the facility for which a license is sought. At a minimum, five significant control manipulations must be performed which affect reactivity or power level." We are defining a reactivity manipulation as a controlled evolution that results in a reactor power, temperature, and/or pressure change clearty observable on control room instrumentation.

The following two tables define acceptable methods to meet the 1 OCFR55.31 requirement for your license. There is room at the end of each table for additional evolutions involving special tests or non-routine evolutions

  • . These write-in" manipulations should be reviewed by an SRO and the Supervisor of Ucensed Operator Training to ensure they meet the intent of 1 OCFRSS.31 (a) (5). REFERENCES
1. NUREG 1021, OPERATOR LICENSING EXAMINATION STANDARDS FOR POWER REACTORS 2. 10CFR55, OPERATOR'S LICENSES 3. IN FAILURE TO SATISFY REQUIREMENTS FOR SIGNIFICANT MANIPULATIONS OF THE CONTROLS FOR POWER REACTOR OPERATOR LICENSING TASK 1. COMPLETE REQUIREMENTS OF 1 OCFR55.31 (a)(S) c__ ____________

-Page 2 :r 3 Rev.: :;

QUALIFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES SECTION II REACTIVITY MANIPULATIONS A. Prerequisite Courses/Qualifications A licensed operator must supervise reactivity manipulations.

To obtain credit for a given manipulation, you must be "at the controls." A SRO in training is not qualified to supervise a reactivity manipulation, therefore no credit for supervision can be given. Satisfactory completion of the following items is required prior to performing ANY reactivity manipulations'.

FOR REACTIVITY MANIPULATIONS WITH THE REACTOR MODE SWITCH IN "STARTUP" (OP CON 2): SATISFACTORY COMPLETION OF STARTUP CERTIFICATION AS DESCRIBED IN NC. TQ-TC.ZZ-0302(Z).

FOR REACTIVITY MANIPULATIONS WITH THE REACTOR MODE SWiTCH IN "RUN" (OP CON 1): TRAINING IN THE CLASSROOM AND SIMULATOR HAS BEEN COMPLETED FOR THE FOLLOWING SYSTEMS, INCLUDING THEORY OF OPERATION, CONTROLS, & INDICATIONS:

-REACTOR RECIRCULATION

-REACTOR RECIRCULATION FLOW CONTROL -POWER RANGE NEUTRON MONITORING (LPRMs, APRMs, & ABM) -REACTOR MANUAL CONTROL -CONTROL ROD DRIVE HYDRAULICS B. Pre-Evolution Brief SUPERVISOR

-LICENSED DATE OPERATOR TRAINING SUPERVISOR*

LICENSED DATE OPERATOR TRAINING 1. Prior to performing ANY reactivity manipulation, a pre-evolution brief shall occur. At a minimum, this brief will cover the following:

a. Intent of the evolution to be performed.
b. Precautions, prerequisites and initial conditions applicable to the evolution.
c. Termination criteria applicable to the evolution.
d. Identification of the Licensed Operator in charge of the evolution.
e. Any knowledge items (such as the importance of doubling, indications of POAH) important to the evolution.
2. The Licensed Operator in charge of the evolution will maintain constant surveillance of the trainee during the evolution, and terminate the evolution if plant conditions warrant. C. Document all reactivity manipulations on Attachment
1. D. Post-Evolution De-Brief At the completion of the evolution, the Licensed Operator in charge will formally relieve the trainee of the watch ensuring positive control of the reactor. Page 3 of a Rev.: 01 QUALIFICATION GUIDE FOR REACTIVITY.MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.

ATIACHMENT 1

.*

1* 'H"E CRIT.CRIA . i . SIGNATURE OF ... START TIME::* E:ND TIME & :: :powi:R AT POWER AT 1(. .. * ._. ** "'. . .... , '"" l..IGENSEO OPERATOR & PATE DAT!: . START END TAKE THE REACTOR CRITICAL USING CONTROL RODS AND EXT ABLISH A HEAT UP RATE. (OP REACTOR POWER CHANGES FROM A ST ABLE NEUTRON COUNT RATE TO INCREASING COUNT RATE WITH A STABLE REACTOR PERIOD. REACTOR POWER CHANGE SUFFICIENT TO ESTABLISH A HEATUP RATE. 1-----------1-----+---*-------*--*-------------

1--------------1------4------t----------

--*-----**--

1-----------t------4-------

  • -------------<

REDUCTION POWER OF AT LEAST 5%, AS (OP CON 1) INDICATED BY: APRMs; CORE THERMAL POWER; OR OD-3 PROGRAM.

  • -----------.. *-----* 1--------------+-----1-------

*>-------


*---------. -**---** -. ----... _____ .. *------------*----.. -*-

____ .J.. ________ -** -------------'------

NOTE: ATTACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS. . Page 4 ol 8 Rev.: 01 QUALIFICATION GUIDE FOR . REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.

ATTACHMENT 1

l".;;.HOP.

":* ,--..... ., .... ACCL* 'I ;.I. 'E CRITt:RiA. . . . SIGNATUAJ:

OF START TIME . ENO.TIMi:

& .. :POWER AT POWER AT . .

  • mt-* . -' * ',,,

OPERATOR & PAT!= DATE START

  • ENO CORE FLOW INCREASE (OP CON 1) ASE IN REACTOR ANINCRE POWERO INDICATE THERMAL PROGRA FAT LEAST 5%, AS D BY: APRMs; CORE POWER; OR OD-3 M. -------*--***

-*----+----

ASE IN REACTOR INDIVIDUAL CONTROL ROD MANIPULATION (WITHDRAWAL) (OP CON 1) FAT LEAST 5%, AS D BY: APRMs; CORE AN INCRE POWERO INDICATE THERMAL PROGRA POWER; OR OD-3 M. ***---*---

--* ------

,_ NOTE: ATIACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS.



Page 5 of B Rev.: 01

  • QUALIFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.

ATTACHMENT 1 .H .. bO . *:. '.'* ACCr 1*1 ",

  • E CRITERIA ' SIGNATURE OF. START TIME ENO POWER AT rOWER AT :.:*:*(* . .. *. . . . . " . LICENSED OPERATOR & DATE . DATE . . START t::ND INDIVIDUAL CONTROL ROD MANIPUI ATION (INSERTION) (OP CON 1) A DECREASE IN REACTOR POWER OF AT LEAST 5%, AS INDICATED BY: APRMs; CORE THERMAL POWER; OR OD-3 PROGRAM. 1------------1-------1---------***-

+-------

1---------------t-----f--------


l-----*--------1------


*--------------*-----*-------


****

___

PATTERN PATTERN EXCHANGE AS EXCHANGE DEFINED BY THE REACTOR (OP CON 1) ENGINEER WHICH RESULTS IN MOVEMENT OF A MINIMUM OF EIGHT (8) CONTROL RODS. 1-----------+-----f--------


.. **--** 1------------*-----1---------

1-------------1-------+---*--*--


.. -----l------------+-------1-----


*-* -*--------!-----

.. --**-* -------**

  • --... *--*-----------'----------L------'-------

NOTE: ATTACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS.

Page 6 of 8 Rev.: 01 QUALIFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY.MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.

ATTACHMENT 1 , **; .,.ucT.HO*P*

.. *:-.7 ... .,.. .. ;: *** .ACC :i 1 "r" E . . * .. '

OF . *:-START TIME **.i:No TiMI: & ..

AT PtWJER AT . : .. ::*:* **

  • ' r-. " ,__, 1-ICENSEQ OPERATOR & OAT!= . , : START END A COMBINATION OF CONTROL ROD MANIPULATIONS AND CORE FLOW INCREASE (UP CON i) A COMBINATION OF CONTROL ROD MANIPULATIONS AND CORE FLOW DECREASE (OP CON 1) REACTOR AN INCREASE IN POWEROFATL INDICATED BY: EAST 5%,AS THERMAL POW PROGRAM. APRMs; CORE ER;OR OD-3 REACTOR LEAST 5%, AS A DECREASE IN POWER OF AT INDICATED BY: THERMAL POW PROGRAM. APRMs; CORE ER; OR OD-3 ... -* -*--------*-----*-------*

i-----------


**-NO r l:: ATTACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS.

.. ------*--*-

-*----------*

  • -*-Page 7 of 8 Rev.: 01 QUALIFICATION GUIDE FOR REACTIVITY MANIPULATIONS FOR RO/SRO INITIAL LICENSE CANDIDATES NOTE: INDIVIDUAL REACTIVITY MANIPULATIONS MUST BE SEPARATED BY TIME, AT LEAST 30 MINUTES, OR AN INTERVENING CHANGE IN REACTIVITY/POWER.

A TT AC HM ENT 1

    • .*ii ACC i. ***CE CRITERIA . -SIGNATURE OF *START TIME. ENO TIME & 'POWl=R AT P(lWER AT kr.-. ... . ..-. 1 * .. ,. *! l 1 * -. l-ICENSEP OPERATOR : & PATE !: DATE *
  • START END . WAITE-IN MANIPULATIONS

_____ _ --------------------------+---------t-----l-----'------

___ ,___ _________

_ -------


t----------t-----t-----


____________________ .L-_______ _.__ ___ ----1. __ ---,--__ __._ _____

NOTE: ATTACH DOCUMENTATION (I.E., NCO NARRATIVE, REACTOR ENGINEER LOGS, ETC.) TO SUPPORT VERIFICATION OF REACTIVITY MANIPULATIONS.

Page 8 of 8 Rev.: 01

QUALIFICATION GUIDE SIGNIFICANT CONTROL MANIPULATIONS FOR RO/SRO INITIAL LICENSE OPERATIONS QUALIFICATION GUIDE ANO IMPLEMENTATION PLAN APPROVAL PAGE PROGRAM: INITIAL LICENSE TRAINING REACTOR OPERATOR OR SENIOR REACTOR OPERATOR MODULE: NIA TITLE: REACTIVITY MANIPULATIONS DOCUMENTATION GUIDE REVISION:

2 PREPARED SY: DATE: REVIEWED BY: DATE: APPROVED BY: DATE: APPROVED BY* DATE: IMPLEMENTATION PLAN: q/..,/92 W/f7 q /'i/97 I I '""-'91= A minimun1 of arc n;quircd lo ma:t lhr.: conditions for your Significant control mampulation methoch contained in the tabla allow for twO repeat performances of the same method. The inicial condition:;

associated with I.he PERFORMANCE STANDARD shall be entered i" <he .. l'NITIAL CONDITION" block prior to performing lJtc maniput.tion.

Ind entered in tht "'FINAL CONDITION" bloct u completion.

TRG CHAIRPERSON:

___

..........

9808260125 980810 PDR ADOCK 05000272 V PDR OATE:Jji/_97 PAGE 1OF5 REVISION 2

.. QUALIFICATION GUIDE SIGNIF1CANT CONTROL MANIPULATIONS FOR ROISRO INITIAL LICENSE NAMF.: CARD TITLE aaCTION I Gl!Nl!llAL REACTMTY MANIPULATIONS OOCUMENTATION GUIDE OBJECTIVE IU;V# 2 Thts Gulde le utillad to document the 10CFRH.l1

(*) (5) NqiiilwaNnta for algniflcant manipulatians at th* cantra wnich statM in part "Prcwide evtdenc9 tMt tM applicant, a a train*, has succlUfully maniputated th* contr"OW of tM fKilfty far which a* llc9ftM i. sought. At a minimum, ftv* significant control manipulation*

mat be wheh dect ruc:UYlly or pow!' level." REFERENCES

l. NUREG*1021.

EXAMINER STANDARDS

2. 10CFR55 3. IN 97-67 TASK I. COMPLETE REQUIREMENTS Of: 10CFR55.31

[a) lS) PAGE 2 OF 6 REVlSION 2

.. QUALIFICATION GUIDE SIGNIFICANT CONTROL MAN IP ULA TIONS FOR RO/SRO INITIAL LICENSE SICTION II IOCOWLeDGI!

UQUIR2Mun"S A. PREREQUISITES COURSESIOUAUFICATIONS Significant ccntrct manipulations must be by ii licensed operator.

To ocmm credit for a given man1pull0on, you must be *at tl'le controls.*

An SRO in tra1n1ng is not quaifl8d to a 51gnlficant control manipulation, therefore no credit for 1upcrvi*ion can b11 given. Satisfadcly oampletion of the follow1ng items i1 required pfior to performing ANY lignifieant control manipulaticn9.

SATISFACTORY COMPLETION OF STARTUP CERTIFICATION AS DESCRIBED IN TP-302. YOUR NAME MUST APPEAR ON THE *MANIPULATION OF FACILITY CONTROLS.

LETIER ISSUED 8Y THe MANAGER OF SALEM OPERATIONS.

B. PRE-EVOLUTION BRIEF SUPEIMSOR

  • LICENSED ll'. TE OPERA TOR SUPERVISOR

-llaNSED CATE OPERATOR TRAINING Pnor to performing ANY significant control manipulation.

a pra-evoMion bnef shaH occur. At a minimum. this brief will cover the folowing:

1. Intent of the 9YDIUtiOn to be petfclmed.
2. Pracauticos.

prefeqUisrtes Ind tnttial conditions applicable to the evolution.

3. Termination crit8r1a to the .wlutian.
4. ldentiftcation of the Licensed Operator in charge of the evoMion. 5. Arly knowledge items (such as the importance Of doubling.

indications of POAH. control charaa.nstics of the main turbine ftir time of core life) important to the evolution.

The Licensed Operater in charge of the evolution will maintain constant surveillance of the trainee during the evolution.

and terminate tne evotution if plant conditions warrant C. POST -EVOttmON DE-BRIEF At the comp\eticn of the WOlution.

the Licensed Operalor in charge will formally relieve the trainee of the watcn ensuring pmitMI c:cotrol of the reactor and plant.

  • PAGE 3 5

,.,.....-.. -

UACTOR OOWff. PONER MANEUVER*

CONTROL ROD$ QUALIFICATION GUIDE SIGNIFICANT CONTffOL MANIPULATIONS FOR RO/SRO INITIAL LICENSE WITH THE REA IN MODE 2 OR LESS, A REACTOR STMTUP TiR TMAH :Z.. POWeR wrTH THE TUA9N AT t IOO M'M OR LESS, SYlilCMRC>NIZE THE GEHERATORAHD RAJSE LOAD TO A ELECTIUCAL OUTPUT OF GREATER THAN 120 lilW9 WITH AT 1IDD RPM OR LESS. SYfitCl<<ONIZE THE GEN!RA'Tal AtilO AAISE I.CAD TO A flNAL ELECTRICAL OUTPUT OF GREATER THAN 1zo MW9 WITH THE REACTOR AT GREATER POWER. SHUTDOWN THE REACTOR TO MOOE3 WITM TME GINERATCR AT GREATIA l1WI IO MW9, SHUl"DOWN

'r\IMN!!*

GENERATOR TO OFF E WITM THE GENERATOR AT GQATER 1*N IO MWe. SHUTDOWN TURIM* G!JEMTOR TO OFF-LIN! WITH R00 CQN'T1Q. IN Mi&Nl.!M, A POWER REDUCTION OF '"'° OR GREATER USING COHTROl ROO IN8E'"1QN CM. Y. REAC"°" POWEft REDUCTION OF 5"' OR GAEATER USING CVCS IOAATION CONTRO\. ONlY. AE.ACTOR POWER REDUCT OF 5"' OR GREATER USING eves BORA T10N ONLY. PAGE 4 OF 6 REVISION 2 QUALIFICATION GUICE SIGNIFICANT CONTROL MANIPUL.A TIONS FOR ROISRO INITIAL LICENSE ' < METHOD f'[Rf ORi,'ANC[

DAT[ INITl/\l rt"JAL UCCNSEO POWER T1JR81NE REACTOR UP* POWER CONTROl ROOS FEEDWATER CONTROL IN MANUM. CURING STAATIJP ST Al':JOARD CONDITION CONDITION OPERATOR ... 1 ... .i

  • wrTH ROO COHTROL IN REACTOR POWER RISE 5% OR GREATER U8'NG CONTROC. ROD W Y. WITH ROD CONTMQl IN POWER

.. OR GIUATER USING CONTROL ROD WJTHDRAWAl.

ONl.Y. REACTOR POWER RISE OR GREATeR USlNG CVCS DILUTION CONTROl ONI. Y. GENERATOR OUTPUT lltllE BY '"' UTIUZING REFEMNCE INCAIASEIDECAEASE OR T\JRllNE MlNUAL CONTROl. *WITH AT I.EAST ONE SIG IN IMNI IAl. CONTROL , MAINTAIN RECUIR&D SIG LEVEL DURING A Pl..ANT STM'T\IP F9'0U YOOe 2 TO GlltfATER 11oWi1 PAGE 5 OF 6 REVISION 2 QUALIFICATION GUIDE SIGNIFlCANT CONTROL MANIPULATIONS FOR RO/SRO INITIAL LICENSE < IV:L TH08 '-':....--<r

,)Rr.lANC[

DATE INITIAL FINAL l.ICFNSfO COtlTROL IN MANUAL SHUTDOWN FEEDWATER CONTROL IN DURINGA POWER MANEUVER FEEDWATER CONTROL IN MANUAL CURINGA P\.ANTUP POW!R PMNEUVER '-i I A 'J()t..RfJ CONDITION CONDI f!ON OPE:.HA TOR MMUAL CCNT9'0L , MAINTAIN R!QUIReD Ml LEWI. DURING A l'l.ANT*SHUTDOWN FROM GREATER nwl 2"' REACTOR POWER TO ..:ioE 3. WITH AT LEAST ON! SIG IN IUMUAL COllffROl , awN'TAIN REQUIRED SIG LEVEL DURING A P\NfT SHUTDOWN FROM OAEATER THAN 2" AEACTOR POW!llll TO MOD! 3. WITH AT LEAST OHE SIG IN AIWftJAl.

CCINTROl

  • tMINT""" REQUIRED SIG L!VEL DURING A PLMT DOWN POWER WUE1NER OF ... Oft CREATER WITH AT LEAST ONE IN MA.MJAL CON'TN)L.

llllEQUIR!D SIG OUlllllHG A PlANT DOWN PONER MANaNER CA GREATER WITH AT LEAST ONE SIG IN MANUAL CCNTAOL.

REQUIRED SIG l.EV!l. DURING A PlNfT UP POWER MANElNER CF ft OR GftEATER WITH AT LEAST ONE SIG IN MANUAL. CONTl'Q. , MAINTAIN REQUIAED SIG LEVEL DURING A P\NfT UP POWER OR GREATER

. ATTACHMENT 1 (Page 3 of 3)

  • Operational Experience and Modifications NC. TQ-TP.ZZ-0302
  • Pre-License Audit Examination (prepared and conducted by trainers other than the instructors who taught the course and given at the end of the module. The trainee will spend a minimum of 13 weeks on-shift comprised of a minimum of 520 hrs of the operating experience module as extra person on shift in training . for that position.

During this time, the trainee shall be under the direct supervision of on-shift licensed personnel.

Additionally, each trainee will be responsible for completing Checkout Cards performance items and system checkouts as scheduled.

Scheduling of checkouts by NTC instructors should . have the concurrence of the SNSS and should not impact trainee involvement in plant operations.

The remainder of this module, will be divided between the classroom and the simulator.

Satisfactory progress must be maintained by the trainee as stated in section 4.5. MODULE IV -NRC Examination Preparation (Duration 4 Weeks) Prerequisites

1. Completion of the appropriate Salem or Hope Creek NEO program. Topics The audit examination results are to be analyzed to identify any individual or generic weaknesses.

The NRC Examination Preparation Module addresses these weaknesses prior to the NRC Examination.

The contents of this module will be developed by the Lead Instructor

-Salem or Hope Creek Replacement License Tra_ining, as appropriate, and will be approved by the Training Super¥1sor

-Salem or Hope Creek License Operator Training, as appropriate.

Plant management should evaluate each candidate regarding these problem areas. This evaluation shall occur prior to submission of the NRC license application (Form NRC-398).

It should ensure that performance problems have been corrected, and it shall re-establish the need for the candidate to perform license duties at the plant. Documentation of all Post-Audit training should be maintained with the course record. NUCLEAR corvlMON QUALIFICATION CHECKOUT CARD (Continuation)

Hope Creek Senior Reactor Operator Training Program Hope Creek SRO IL T Operating Experience . Hope Creek SRO QCC WA TCHSTANDING ITEMS Action Code Given the assignment, COMPLETE a minimum of 13 weeks or 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> (which ever P is longer) with a minimum of 6 weeks at greater than 20% reactor power as an extra person on shift in the training program for the senior reactor operator position.

From To Shift Avg* Date 'lime Date T"IDle *Hours Pwr* Crew* Oneradons Suoerintendent I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I .-*-. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Total hours/weeks On-Shift:

\hc_ops\1askmlr\hopqcard.mdb 13 or 15 Rcvmon
: --------------------------