ML20154R587

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Section 3.0.4,eliminating Restrictions for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities
ML20154R587
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/19/1998
From:
Public Service Enterprise Group
To:
Shared Package
ML20154R584 List:
References
NUDOCS 9810270098
Download: ML20154R587 (3)


Text

._ _ . . _ _ ._ __ -. . . . _- .-- -

D::cument Control Dsek LR-N98451 Attcchment 3 LCR H98-04 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 REVISIONS TO THE TECHNICAL SPECIFICATIONS (TS)

TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. NPF-57 are affected by this change request:

Technical Specification Page 3.6.5.3.1 3/4 6-51 3.6.5.3.2 3/4 6-52a 9810270098 981019 PDR ADOCK 05000354 P PDR

l CONTAINMENT. SYSTEMS 3.6.5.3 FILTRATION, RECIRCULATION ANO VENTILATION SYSTEM (FRVS)

{

FRVS VENTILATION SU85YSTEM l

}

LIMITING CONDITION FOR OPERATION l 3.6.5.3.1 Two FRVS ventilation units shall be OPERA 8LE. l 1

I

! APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, 3 and *. l j ACTION: i 1,

a. With one of the above required FRVS ventilation units inoperable, l restore the inoperable unit to OPERA 8LE status within 7 days, or:

1

1. In OPERATIONAL CONDITION 1, 2 or 3, be in at least HOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUT 00WN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2. In Operational Condition *

, suspend handling of irradiated fuel in the secondary containment, CORE ALTERATIONS and o erations  ;

with a potential'for draining the reactor vessel. The -u ,

provisions of Specification 3.0.3 are not applicable.  !

b. With both ventilation units inoperable in Operational Condition *, i suspend handling of irradiated fuel in the secondary containment, CORE ALTERATIONS or operations with a potential for draining the l reactor vessel. The provisions of Specification 3.0.3. are not applicable. .

j SURVEILLANCE REQUIREMENTS 4.6.5.3.1 Each of the two ventilation units shall be demonstrated OPERABLE: l

a. At least once per 14 days by verifying that the water seal bucket traps have a water seal and making up ar./ evaporative losses by fit-ling the traps to the overflow.
b. At least once per 31 days by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the i subsystem operates for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heaters on in order to reduce the buildup of moisture on the carbon adsorbers d HEPA 4

I . ' ' ~~ ' ,s o . g U <.L,l . .for iW***e of k. ewe ob j

[2 [w a+ Co# C

  • 8I+ b ^ f Vr. . '6 h ,

n,c a m".,T M-,,,..>.c D'*O' I"u#

r .,#ea.. + i w , .

O ve v us.\ x ,r,a x qs f_lesc R "When irradiated uel is being handled in the secondary containment and during-CORE ALTERATIONS and operations with a potential for draining the reactor vessel.

HOPE CREEK 3/4 6-51 Amendment No.30 f 1

44'T%g gesMon c 4 $ fees'le.4.'s~ 5 0 4 sce + 0h MO*4 ,( L..)\g of + ffUcs % $t,r-c.en % & +

i(f*be.4e) ML vb 5 econ)*r y (

d C.etc A tMa no.JS As f .l ~ + '% k 1 O f e< ~ ~\ G-b;4,- s , w-,u re.cu,froddths w lu<,, \ y. \ ,,

CONTAIt g !T SYSTEMS oy! e 4 b TL (, , +

t_ *. .t.g.

3.6.5.3 FILTRATION, RICIRCULATION AND VENTILATION SYSTEM (FRT/S)

FRVS RECIRCULATION SUBSYSTEM LIMITINC, CONDITION FOR OPERATION 3.6.5.3.2 Six FRVS recirculation units shall be OPERABLE.

APPLIC1 E l'C(: OP; NTIONAL CONDITIONS 1, 2, 3 and *.

ACTIOF:

l

a. With one or two of the above required FRVS recirculation units j inoperable, r* store all the inoperable unit (s) to OPERABL3 status witnin 7 days, or: j
1. Ir OPERATIONAL CONDITION 1, 2, or 3, be in at leant HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2. In Operational Condition *, suspend handling of irradiated fuel in the secondary containment, CORE ALTERATIONS and g operations with a potential for draining the reactor vessel.

. The provisions of Specification 3.0.3 are not applicable,

b. With three or more of the above required FRVS recirculation units I inoperable in Operational condition *, suspend handling of irradiated fuel in the secondary containment, COR2 ALTERATIONS or operations with a potential for draining the reactor vessel. The provisions of Specification 3.0.3 are not applicable.
c. With three or more of the above required FRVS recirculation units inoperable in OPERATIONAL CONDITION 1, 2, or 3, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.5.3.2 Each of the six FRVS recirculation units shall be demonstrated OPERABLE:

a. At least once per 14 daye by verifying that the water seal bucket traps have a water seal and making up any evaporative losses by filling the traps to the overflow.
b. At least once per 31 days by initiating, from the control room, 1 flow through the HEPA filters and charcoal adsorb (,rs and verifying that the subsystem operates for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heaters on in order to reduce the buildup of moisture on the carbon adsorbers and HEPA filters.

i *When irradiated fuel is being handled in the secondary containment and during CORE ALTERATIONS and operations with a potential for draining the reactor vessel.

HOPE CREEK 3/4 6-52a Amendment No. 99