Rev 5 to WP3/F43TB3-05, Welding Procedure SpecificationML20198J650 |
Person / Time |
---|
Site: |
Hope Creek |
---|
Issue date: |
08/20/1997 |
---|
From: |
FRAMATOME |
---|
To: |
|
---|
Shared Package |
---|
ML20198J640 |
List: |
---|
References |
---|
WP3-F43TB3-05, WP3-F43TB3-5, NUDOCS 9710210221 |
Download: ML20198J650 (7) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217E0451999-09-30030 September 1999 Proposed Tech Specs Supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10 ML20216E6201999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 14 to Table of Contents & Rev 10 to Attachments 6,7 & 9 ML20211F9511999-08-26026 August 1999 Proposed Tech Specs Pages,Raising Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML20196E6541999-06-21021 June 1999 Proposed Tech Specs Pages for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20195B5531999-05-24024 May 1999 Proposed Tech Specs Correcting Typos & Editorial Errors. Corrections Are Considered to Be Administrative in Nature ML20196L1231999-05-17017 May 1999 Proposed Tech Specs Pages,Revising TS to Include Oscillation Power Range Monitor (OPRM) Sys ML20206T8941999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 12 to Table of Contents,Rev 8 to Attachment 8,Rev 8 to Attachment 7 & Rev 8 to Attachment 9 ML20206G2111999-04-30030 April 1999 Proposed Tech Specs,Incorporating Programmatic Controls in Tech Specs for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20206G2281999-03-31031 March 1999 Rev 18 to ODCM for Hope Creek Generating Station ML20205E8101999-03-29029 March 1999 Proposed Tech Specs Incorporating Programmatic Controls for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20204J2871999-03-22022 March 1999 Proposed Tech Specs Bases Page B 3/4 8-1d,correcting Editorial Errors ML20204J1291999-03-22022 March 1999 Proposed Tech Specs Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 ML20202B6171999-01-19019 January 1999 Revised TS Bases 3/4.6.1.1,revised to Clarify When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML20198T0281998-12-30030 December 1998 Proposed Tech Specs Re Changes to Flood Protection TS LCO & Associated Action Statements ML20198N3981998-12-28028 December 1998 Proposed Tech Specs Permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys ML20198C9641998-12-16016 December 1998 Proposed Tech Specs Pages,Replacing Accelerated Testing Requirements of TS Table 4.8.1.1.2-1 with EDG Performance Monitoring & Deleting TS 4.8.1.1.3 Requirement to Submit 30- Day Special Rept for Diesel Failures ML20155D3591998-10-22022 October 1998 Proposed Tech Specs Page for Amend to License NPF-57, Establishing More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5871998-10-19019 October 1998 Proposed Tech Specs Section 3.0.4,eliminating Restrictions for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities ML20154L5021998-10-0808 October 1998 Revised Tech Spec Page,Which Corrects Editorial Errors ML20151X7321998-09-0808 September 1998 Proposed Tech Specs Permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4331998-08-25025 August 1998 Proposed Tech Specs,Implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs ML20236F1171998-06-25025 June 1998 Proposed Tech Specs Deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8181998-06-12012 June 1998 Proposed Tech Specs Re Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintain Ultimate Heat Sink Operation within Design ML20247K7381998-05-13013 May 1998 Proposed Tech Specs Page Re Change to Inservice Leak & Hydrostatic Testing Requirements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML20217P9351998-04-28028 April 1998 Proposed Tech Specs Section 3/4.4.2,implementing More Appropriate SRV Setpoint Tolerances ML20216F4541998-03-0606 March 1998 Proposed TS Section 4.2.2 Re Terrestrial Ecology Monitoring ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML20197H5941997-12-19019 December 1997 Proposed Tech Specs Pages,Revising TS Section 4.2.2, Terrestrial Ecology Monitoring, by Changing Wording to Include Completion of Salt Drift Monitoring Program ML20197H8511997-12-0808 December 1997 Rev 0 to IST Program Submittal Interval 2,Dec 21,1997 Through Dec 20,2006 ML20198J6431997-10-10010 October 1997 Rev 0 to 55-WP3/F43TB3-05, Weld Procedure ML20211M6121997-10-0707 October 1997 Cycle 4 Startup Physics Testing ML20211M2401997-10-0303 October 1997 Proposed Tech Specs Pages Associated W/Slmcpr Changes ML20217D3761997-09-29029 September 1997 Proposed Tech Specs Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated ML20211F6201997-09-24024 September 1997 Proposed Tech Specs Section 3/4.5.1,adding Surveillance Requirement to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie-valves ML20198H2471997-08-26026 August 1997 Proposed Tech Specs Implementing Conservative Safety Limit Min Critical Power Ratio for Plant Cycle 7 Core & Fuel Designs ML20217Q6731997-08-26026 August 1997 Proposed Tech Specs,Requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20211M2641997-08-26026 August 1997 Revised TS Bases Pages for Amend 101 to License NPF-57 ML20217Q3081997-08-25025 August 1997 Proposed Tech Specs Re Ultimate Heat Sink Temp & River Water Level Limits ML20198J6541997-08-20020 August 1997 Rev 3 to 55-PQ7001-03, Procedure Qualification Record ML20198J6501997-08-20020 August 1997 Rev 5 to WP3/F43TB3-05, Welding Procedure Specification ML20210P3471997-08-20020 August 1997 Proposed Tech Specs Deleting References to Plant Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage ML20149G4301997-07-16016 July 1997 Proposed Tech Specs Implementing Appropriately Conservative Safety Limit Min Critical Power Ratio ML20211M2531997-07-16016 July 1997 Sanitized Version of TS Page Changes Re SLMCPR ML20141C1621997-06-19019 June 1997 Proposed Tech Specs Revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & to Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20140D2201997-05-30030 May 1997 Proposed Tech Specs,Providing marked-up Pages to Address NRC Reviewer Comments ML20141G8291997-05-19019 May 1997 Proposed Tech Specs Revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Issues Related Issues Documented in Hope Creek Corrective Action Program ML20137N6271997-04-0101 April 1997 Proposed Tech Specs 4.6.1.1, Primary Containment Integrity, TS 3/4.6.1.2, Primary Containment Leakage, TS 3/4.6.1.3, Primary Containment Air Locks & TS 4.6.1.5.1, Primary Containment Structural Integrity ML20137M1331997-03-31031 March 1997 Proposed Tech Specs Revising TS to Improve Consistency Between TS & Plant Configuration,Operation & Testing & Completing Required CA to Resolve Discrepancies Identified in CA Program 1999-09-30
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20216E6201999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 14 to Table of Contents & Rev 10 to Attachments 6,7 & 9 ML20206T8941999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 12 to Table of Contents,Rev 8 to Attachment 8,Rev 8 to Attachment 7 & Rev 8 to Attachment 9 ML20206G2281999-03-31031 March 1999 Rev 18 to ODCM for Hope Creek Generating Station ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML20197H8511997-12-0808 December 1997 Rev 0 to IST Program Submittal Interval 2,Dec 21,1997 Through Dec 20,2006 ML20198J6431997-10-10010 October 1997 Rev 0 to 55-WP3/F43TB3-05, Weld Procedure ML20198J6501997-08-20020 August 1997 Rev 5 to WP3/F43TB3-05, Welding Procedure Specification ML20198J6541997-08-20020 August 1997 Rev 3 to 55-PQ7001-03, Procedure Qualification Record ML18102A7941997-01-21021 January 1997 Event Classification Guide,Technical Basis, for Hope Creek Generating Station & Salem ML18102A7931997-01-21021 January 1997 Event Classification Guide,Technical Basis, Salem Generating Station ML18102A6661996-11-19019 November 1996 Rev 2 to Pse&G Simulation Facility Certification Program. ML20115B7791996-07-0303 July 1996 Final Draft, Hope Creek Event Classification Guide, Sections 1-9 ML20096F4741996-01-13013 January 1996 Revised Hope Creek Generating Station Event Classification Guide, Including Rev 45 to Table of Contents,Rev 39 to Attachments Signature Page,Rev 26 to Attachment 6,Rev 26 to Attachment 7 & Rev 26 to Attachment 9 ML20096C2231995-12-19019 December 1995 Rev 0 to HC.SA-AP.ZZ-0005(Z), Operational Readiness Self Assessment Program ML20096C2151995-11-26026 November 1995 Rev 0 to Hope Creek RF06 Outage Completion Plan ML20094P1151995-11-14014 November 1995 Revised Hope Creek Event Classification Guide, Including Rev 44 to Table of Contents,Rev 38 to Attachments Signature Page & Rev 25 to Attachments 6,7 & 9 ML20091M9911995-10-15015 October 1995 Event Classification Guide HCGS, Including Revised Eals, Technical Basis Document & NUMARC EAL-to-Hope Creek Comparison Summary ML20086G1341995-07-21021 July 1995 Rev 42 to Hope Creek Generating Station Event Classification Guide ML18101A6911995-05-31031 May 1995 Nbu Issue Mgt & Prioritized Action Plan, Dtd May 1995 ML20134K0831995-02-27027 February 1995 Pse&G/Nuclear Business Unit Organizational Effectiveness Assessment Plan, ML20076F9021994-10-14014 October 1994 Event Classification Guide ML20073D3671994-09-20020 September 1994 Rev 3 to IST Program,Including Review Sheets to Add 17 Valves,Three Revised Pump Review Sheets,Reflecting Testing Requirements of Relief Request P3 & Review Sheets for Two Valves Which Had Testing Requirements Changed ML20071J9801994-07-15015 July 1994 Revised Hope Creek Event Classification Guide ML20069N2071994-06-0909 June 1994 Revised Hope Creek Generating Station Event Classification Guide,Including Rev 33 to Table of Contents,Rev 12 to Attachment 1,Page 5 & Rev 7 to Attachment 2,Page 4 ML20069D2961994-05-21021 May 1994 Revised Event Classification Guide,Including Rev 33 to Table of Contents,Rev 28 to Attachments Signature Page,Rev 12 to Attachment 1,Rev 7 to Attachment 2,Rev 7 to Attachment 3,Rev 6 to Attachment 4 & Rev 18 to Attachment 6 ML20147B0941993-12-13013 December 1993 Rev 10 to Procedure HC.IC-GP.ZZ-0008(Q), Maint Troubleshooting & Known Component Problems ML20046D3311993-08-0909 August 1993 Rev 3 to Section 7,Page 3 of Hope Creek Event Classification Guide, Rev 28 ML18096B3251993-02-26026 February 1993 Integrated Scheduling Program. ML20147B0681992-11-17017 November 1992 Rev 4 to Procedure NC.NA-AP.ZZ-0005(Q), Station Operating Procedures ML20106B8541992-09-25025 September 1992 Revised Event Classification Guide (Ecg),Including Rev 21 to Table of Contents,Rev 13 to Ecg Section Signature Pages 1 & 2 & Rev 3 to Ecg Section 6 Re Fission Product Boundary Failures ML20147B2051992-09-21021 September 1992 Rove Time Keeping Procedure ML20079K5391991-10-0404 October 1991 Rev 14 to Event Classification Guide,Including Table of Contents,Signature Pages,Spill/Discharge Notification Form & Related Pages ML18100A7071991-02-0707 February 1991 Rev 1 to Procedure NC.NA-AP.ZZ-0061(Q), Significant Event Response Team Mgt. Procedure Reformatted to Comply W/ Artificial Island Administrative Writers Guide NC.NA-WG.ZZ-0001(Z) ML20067D7901991-01-11011 January 1991 Re 10 to Hope Creek Generating Station Event Classification Guide ML20059D2641990-03-30030 March 1990 Rev 11 to ODCM for Hope Creek Generating Station ML20005D6431989-11-29029 November 1989 Forwards Rev 3 to Ecg Signature Page,Rev 2 to Section 5, Fuel Damage/Degraded Core & Rev 1 to Section 6, Fission Product Boundary Failures. ML20236B0061988-10-31031 October 1988 Rev 2 to Process Control Program Manual ML20153F3361988-06-0808 June 1988 Rev 9 to Offsite Dose Calculation Manual ML20151P5851987-12-0202 December 1987 SPDS Verification & Validation Program Plan ML20236Q8671987-09-30030 September 1987 Amend 1 to Rev 1 to Inservice Testing Program (Pumps & Valves) ML20235E1541987-09-15015 September 1987 Rev 1 to Hope Creek Generating Station Inservice Testing Program (Pumps & Valves) ML20238E7621987-09-0909 September 1987 Emergency Plan Annual Exercise ML20237K0671987-08-0505 August 1987 Rev 8 to Offsite Dose Calculation Manual ML18092B4991987-03-20020 March 1987 Artificial Island Stability Limitation Operating Restrictions. ML20212B7171987-02-25025 February 1987 Rev 6 to Offsite Dose Calculation Manual for Hope Creek Generating Station ML20214N7251986-11-30030 November 1986 Process Control Program ML20203N8491986-09-30030 September 1986 Inservice Exam Program Submittal for First 10-Yr Interval ML20203K7691986-08-13013 August 1986 Rev 0 to Spec AEI-PSEG-SP-002, Spec for Bailey 862 Solid- State Logic Module Reliability Test Program for Pse&G Hope Creek Generating Station ML20214Q8161986-03-14014 March 1986 Rev 1 to OP-AB.ZZ-121(Q), Failed Open Safety/Relief Valve 1999-09-10
[Table view] |
Text
.. ._ . - - . - - . _ . _ _ . _- ..
- " WELDING PROCEDURE SPECIFICATION 55-WP3/F43TB3-05 f,R A g T, y,% Machine Temperbead GTAW j
l
, WELDING PROCEDURE SPECIFICATION l
WP3/F43TB3-05 4
Supporting Procedure Qualification Records: 7001 i
i PREPARED BY: b DATE: 8\26 7 WE ENGINEER REVIEWED BY: DATE: R/pc/27
! bb[N! ENGINEER
- APPROVED BY
- [ m_[ .y DATE: 8/hk/97 W, NAGER, WELDINhGINEFDJNG i
9710210221 971015 i(- PDR ADOCK 05000354 P PDR August 15,1997 Page 1 of 7
WELDING PROCEDURE SPECIFICATION 3 55 WP3/F43TB3-05 l
4
-I."d@M.Wei Mechine Temperbead GTAW I ~ RECORD OF REVISIONS REV.NO. DAIE REASON FOR REVIS!ON
' 00 September 30,1993 Originalissue 01 August 22,1995 Deleted "This WPS le quellflod for i
producing impact tested welds" from
, section 1.0, Added to section 3.0: "This
- procedure is quellflod to weld P-No. 3,
- Group 3 base materials that have been PWHT up to 60 hrs. O 1150*F por ASME XI, Code Case N-432". Changed section 6.0 Vertical weld prw
- ::': , to l Uphill or Downhill. Changed Pg. 7 of 7
, weld parameters to the parameters
! quaillied on PQR and included heat input values, j 02 August 22,1995 Revised to correct discrepancy between j revision and document number.
I k 03 September 14,1995 Corrected oversight to ptovide a range i for wire feed speed.
i 04 May 29,1997 Revised to reflect the new FTl Wolding Engineering numbering systems and format.
- 05 August 15,1997 Revised Joint Design, Base Metal
] .. thickness range and Heat input Data.
i i
i
\
August 15,1997 Page 2 of 7
" WELDING PROCEDURE SPECIFICATION 55-WP3/F43TB3-05 7fdW.A,TQM5 Machine Temperbead GTAW
- il 1.0 SCOPE Machine Gas Tungsten Arc welding of P-No. 3 low alloy steel base materials with the
, " Temper Bead W61d Technique". Welding may only be performed in accordance with 55-SPP05 and Postweld Heat Treatment shall be performed as specified herein. This WPS shall be used in conjunction with GWP-1 (General Welding Procedure) "ASME Code Applications" and ASME Se:Aion XI, Code Case N-432.
F 2.0 JOINTS (QW 402):
i Design: V & U grooves with single, doubia or compound bevels, fillets, weld pads, modifications and repairs.
Root Specing: Open Butt: None
- Consumable Inserts
- None l Bacidng ring: None Backgouge: None Backing Material: P-No. 3 integral Non metallic retainers or non fusing retainem shall not be used unless
- authorized by Welding Engineering.
I Details: Per project drawings or as specified in SPP-1 3.0 RASE MATERIALS (QW 403):
Materials: P-No. 3, Group 3 (SA-533, Gr. B, Class 1).
This procedure is qualified to weld P-No. 3, Group 3 base materials that have been PWHT up to 60 hrs @ 1150"F per ASME XI, Code Case N-432.
Thickness:
Groove welds (T): 5/8" to 6-1/8" j Fillet welds: All 1
l i
J
, ,(
t
- August 15,1997 Page 3 of 7 i
i
WELDING PROCEDURE SPECIFICATION .
55-WP3/F43TB3 05 f,RM.AT,Q %% Machine Temperbead GTAW 4 4.0 FILLER MATERIALR (QW@):
0.030' to 0.062' diameter F-No. 43, SFA 5.14, AWS No. ERNiCr-3 (UNS N06082) or ERNiCrFe-7 (UNS N06052; Code Case 2142)
Deposited Weld Metal (Maximum):
Groove welds (t): 1-3/8" Fillet welds: All Repair wolds (depth of repair): 1-3/8" Pipe diameters: Not Applicable Maximum layer thickness shall be 1/4".
Filler metal shaN be added on all passee.
3 5.0 POSITIONS (QW-405):
Groove welds: All Fillet welds: All Repair welds: All Vertical Weld progression: Uphill or Downhill
, 6.0 PREHEAT (QW 406):
Minimum preheat temperature: 300*F Maximum interpass temperature: 400'F
- Preheat maintenance: Preheat shall be established 30 minutes prior to welding and maintained until the start of Postweld Heat Treatment (PWHT).
7.0 POSTWELD HEAT TREATMENT (QW-407):
1 Temperature range: 450'F - 550'F Time range: 2 Hours minimum
- 8.0 GAS (QW-408)
Shielding Gas: Argon Flow Rate: 15-25 CFH
< Purge Gas: None Flow Rate: None Trailing Gas: None Flow Rate: None Gas Composition: Welding Grade i
August 15,1997 Page 4 of 7 1
r
WELDING PROCEDURE SPECIFICATION 55-WP3/F43TB3-05 f f, h $.A.T%P,5 Machine Temperboad GTAW
( 9.0 et NCTRICAL CHARACTERISTICS f0W 409):
GTAW DCSP A change to the welding parameters shall be within range of the quellflod heat input.See Page 6 for Quellflod Parameters and Host input Ranges Tungsten Electrode: 8FA 5.12. EWTh 2 - 1/16", 3/32", or 1/8" dien.ater.
The same type sensing and control equipment used for welding of the PQR shall be used during use of this WPR, l.6, AVC (Automatic Voltage Control) 10.0 TECHNDUE (QW 410):
String or weave: String Only Orifloo orgas cup: M #12 EN Extension: 1/8 - Sl4" Peening: Not permitted Passes por sue: Multiple Maximum tieed width: Controlled by desigrxtted parameters inkial, Interpass &
Final Clooning:
Wire brushing, grind:ng, filing, deburring and/or chipping Method of WMme: None Number of Electrodes: Single h
August 15,1997 Page 5 of 7
" WELDING PROCEDURE SPECIFICATION 55 WP3/F43TB3-05 f,R,A,9,A,T,$ M 5 Machine Temperbead GTAW l RECOMMENDED AND QUAllFIED HEAT INPUT REQUIREMENTS PARAMETER LAYER LAYER LAYER LAYER BALANCE 1 2 3 4,5.6 PRIMARY VOLTS 9.5 9.5 9.5 9.5
9.5 BACKGROUND
VOLTS
- N/A N/A N/A N/A N/A PRIMARY AMPS 180 194 194 194 275 ,
BACKGROUND MAPS 103 118 118 118 130 PRIMARY W.RE 43 63 60 60 58 BACKGROUND WIRE 30 51 50 50 68 PRIMARY PULSE .18 .16 .16 .16 .18 BACKGROUND PULSE .25 .25 .25 .25 .25 TRAVEL SPEED (IPM) 8.5 6.5 4.5 3.5 - 4.0 4.6 PULSES /SECOND 2.44 2.44 2.44 2.44 2.44 (CALCULATED)
RECOMMENDED 8,922 12,949 18,703 24,047 - 23,120 j, PARAMETERS - HEAT 21,041 Max.***
\ INPUT (J/In)
- MAX. HEAT INPUT +10% 9,814 14,243 20,573 26,541 - N/A (J/in) 23,145
- MIN, HEAT INPUT-10% 8,030 11,654 16,833 21,642 - N/A (J/in) 18,937
- Background Voltage is not applicable in the SAMP mode.
- Minimum and Maximum Heat input Values are beced on actual POR paranwters.
- Maximum used in Procedure Qualif6 cation for balance of welding.
FORMULAS FOR CALCULATING HEAT INPUT:
AVGAVC = PRIVOLT PLS/SEC = 1/(PRIPLS + BCKPLS)
AVGAMP = (PLS/SEC
HEAT INPUT (J/in) = (AVGAVC
- 60)/ TRAVEL SPEED August 15, $ 397 Page 6 of 7
WELDING PROCEDURE SPECIFICATION 55 WP3/F43TB3-05 rMeA;r, EKE Machine Temport>ead GTAW c
ALLOWABLE RANGE FOR WIRE FEED SPEED 4
Parameter layeri Layer 2 Layer 3 Layer 4 5 Bahnee Prt Wire 43 63 60 60 56 Plus 10 % 47 69 66 66 64 Minus 10 % !
39 57 54 54 52 Bok. Wire 30 51 50 50 56 Plus 10 % 33 56 55 56
- 64 Minue 10 % 27 46 45 45 *52
- Sck VWre ehes be aquel to the Pri Wire setting or tum off wire food pulse.
(
d N
August 15,1997 Page 7 of 7