_ _ - ~ _ _ _ _ _ _ _

V h e ek t e - a($ec*e) seestc s*4cr r

g3u PLANT SYSTEMS.

GN oot W b o ger.%\\e.

c.4 bW.

4h AC4%

r@ e-d b a.

L-C O 3 0.\\.'7.

  • 3/4.7.3 FLOOD PROTrCTION I'

l LIMITING CONDITION FOR OPERATION 3.7.3 Flood protection shall be provided for all safety related systems components and structures-when the water level of the Delaware River reac,hes 6.0 feet Mean' Sea Level (MSL) USGS datum (95.0 feet PSEM datum) at the S vice Water Intake Structure.

APPLICABILITY:

At all times.

l ACfION:

i With severe storm warnings from the National Weather Service which i

a.

may impact Artificial Island in effect or with the water level at the service water intake structure above elevation 6.0 feet MSL USGS l

datum (95.0 feet PSE&G datum), initiate and complete:

1.

The closing of all service water intake structure watertight perimeter flood doors identified in Table 3.7.3-1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />,

- and -

2.

The closing of all power block watertight perimeter flood doors identified in Table 3.7.3-1 within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

y Once closed, all access through the doors shall be administratively controlled.

b.

With the water level at the service water intake structure above elevation DOWN within l)che next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within 1

l 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

ing i

-[ o 4

+ h.w b Sb h w % s n.-.a u -

~,..a = k 2

+

~.n SURVEILLANCE REQUIREMENTS U *N

'2A

      1. 5*

~

4 4.7.3 The water level at the service water intake structure shall be deter-mined to be within the limit by:

a.

Measurement at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the water level is below elevation 6.0 MSL USGS datum (95.0 feet PSEM datum), and b.

Measurement at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> when severe storm warnings from j

the National Weather Service which may impact Artificial Island are in effect.

1 c.

Measurement at least once per hour when the water level is equal 4

te or above elevation 6.0 MSL USGS datus (95.0 feet PSEM datum).

4 9901120101 981230

~

4 PDR ADOCK 050003:.ee p

PDR _

L

{

HOPE CREEK 3/4 7-9

TABLE 3.7.3-1 PERIMETER FLOOD DOO.R.S_

INTAKE STRUCTURE DOORS' Water tight door 1

,,w..

.., c Water tight door 3 C....,,.....>

W ter tigt,i dee,- ;

Water tight door 6 wu 6s s w a y... ww.s

/

Water tight door 8 POWER BLOCK DOORS and HATCH Coors & Hatch Location Hatch Exterior 45; K S-13 45.5; L 3340B 44; M 33378 44; Md 6312 45.4; T 6323B 45.4; U 5315A 29.9; X 5315C' 29; X 4323A 13.6; U 4304 13.6; U 3301A 13.6; Md

-33058 13.6; L-3315B Interior-102' 25; H 3329A 27; H 33318 35; H 3209A Interior 26; H 1

HOPE CREEK 3/4 7-10

.