r l

i l

1 i

Attachment l Replacement Page for LCR H98-11 l l

l l

l I

l l

l 99033 g y MOO 54 PDR PDR c

P l 3/4.8 ELECTRICAL POWER' SYSTEMS

' BAS $S (Continued) sParticulate concentration ~should be determined in accordance with ASTM D2276-94, Method A. This method involves a gravimetric determination of total particulate concentration in the fuel oil and has a limit of 10'mg/1. The 0.8 micron filters specified in ASTM D2276-94:may be-replaced'with membrane filters up to 3.0 microns. This isfacceptable sin'ce'the closest tolerance fuel

-filter in thet HC EDGs'is. a :five micron particle retention duplex filter on the engine driven fuel' oil pump. It is acceptable.to obtain a-fieldisample.for subsequent-laboratory testing in lieu of field ~ testing.- The total volume of stored fuel oil montained in two or'more interconnected tanks must be con;.'icred at.i tested separately. The frequency'of this-test takes into consideration fuel oil degradation trends that indicate the particulate concentration is unlikely to change'significantly between frequency intervals.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that (1) the facility-can be maintained in the shutdown or refueling condition for extended time periods and (2) sufficient instrumentation and control, capability is available-for monitoring and maintaining the unit status.

The surveillance requirements'for demonstrating the OPERABILITY of.the diesel generators'are in accordance with the recommendations for Regulatory Guide 1.9, " Selection of Diesel-

, Generator Set Capacity for Standby Power Supplies", March 10, 1971, . Regulatory Guide 1.108, " Periodic Testing of Diesel

-Generator Units Used as Onsite Electric Power Systems at Nuclear

- Power Plants", Revision 1, August 1977 and Regulatory. Guide 1.137

~" Fuel-Oil Systems for Standby Diesel Generators", Revision 1, October 1979 as modified by plant specific analysis, diesel generator manufacturer's recommendations, and Amendment 59, to

the Facility Operating License, issued November 22, 1993.

msenn-l HOPE' CREEK B 3/4 8-1d Amendment No. 100 i l

3

INSERT.

Regulatory Guide 1.108 criteria for determining and reporting valid tests and failures and accelerated diesel generator testing have been superceded by implementation of '

the Maintenance Rule for diesel generators per 10CFR50.65.

i i