|
|
Line 3: |
Line 3: |
| | issue date = 05/16/2006 | | | issue date = 05/16/2006 |
| | title = E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 16,2006 | | | title = E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 16,2006 |
| | author name = McMullin K M | | | author name = Mcmullin K |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
| | addressee name = Boska J P, Cobey E W, Lew D C | | | addressee name = Boska J, Cobey E, Lew D |
| | addressee affiliation = NRC/NRR | | | addressee affiliation = NRC/NRR |
| | docket = 05000247, 05000286 | | | docket = 05000247, 05000286 |
|
---|
Category:E-Mail
MONTHYEARML24036A0162024-02-0101 February 2024 NRC Email - Acknowledge and Accept the Indian Point Energy Center Request to Be Removed from NRC Headquarters Operation Officer (Hoo) Morning Authentication Code Calls ML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 – Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 – Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23325A1632023-11-0808 November 2023 – State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 – Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 – NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual 2024-02-01
[Table view] Category:Status Report
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21084A7892021-03-25025 March 2021 Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2020 - 10 CFR 50.82(a)(8)(vii) CNRO-2019-00006, Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ML18088B2462018-03-29029 March 2018 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2017, Per 10 CFR 50.82(a)(8)(vii) CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2017-03-31031 March 2017 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) ENOC-17-00006, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii)2017-03-30030 March 2017 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii) NL-16-024, Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2015-08-28028 August 2015 Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-28028 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation NL-14-059, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2014-04-29029 April 2014 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-14-00009, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2014-03-28028 March 2014 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc NL-14-031, Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-27027 February 2014 Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-13-072, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2013-05-0202 May 2013 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ENOC-13-00011, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii)2013-03-29029 March 2013 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii) ML12137A1362012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A1052012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A0902012-05-29029 May 2012 Decommissioning Funding Status Report ML12122A0712012-05-14014 May 2012 Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 ENOC-11-00005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1) ML1029403622010-11-12012 November 2010 October 2010 10 CFR 2.206 Monthly Status Report: Enclosures ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 20092010-03-31031 March 2010 Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009 ML1100404362009-09-16016 September 2009 Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 09/16/2009 ML0830800812008-11-20020 November 2008 October 2008 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206- Enclosures ML0905708302008-11-0505 November 2008 Entergy Center Status Report NL-08-131, Siren Project Status Update2008-08-12012 August 2008 Siren Project Status Update NL-08-121, Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/082008-07-25025 July 2008 Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/08 ENOC-08-00028, J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report2008-05-0808 May 2008 J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report ML0729506172007-09-13013 September 2007 E-mail from K. Mcmullin, Entergy to J. Boska, NRR Et Al on IPEC Status Report, September 13, 2007 ML0729705242007-08-0707 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 7 2007 ML0729705222007-08-0606 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 6 2007 ML0729705042007-07-31031 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 31 2007 ML0729704422007-07-27027 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 27, 2007 ML0729704332007-07-26026 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 26 ML0729703852007-07-18018 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 18 2007 ML0729506092007-06-11011 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 11, 2007 ML0729506082007-06-0707 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 7, 2007 ML0729506032007-06-0505 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding Indian Point Energy Center Status Report, June 5, 2007 ML0729506002007-06-0101 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 1, 2007 ML0729505982007-05-31031 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 31, 2007 ML0729505922007-05-30030 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 30, 2007 ML0729505912007-05-29029 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 29, 2007 2024-09-18
[Table view] |
Text
From: "McMullin, Kat teen.M' <KMcMull@entergy.com>
To: ' Baranski, James" <james.baranski
@semo.state.ny.us>,'
Eddy, Paul" <paulreddy@dps.state.ny.us>, 'Greeley, Dan" <greeleyd@co.rockland.ny.us>, 'Gross, Steve -Orange PIO' <sgross@co.orange.ny.us>, "Sutton, Tony' <awsl @westchestergov.com>,<AStiebeling
@pcbes.org>, 'Albanese, Raymond" <rlal @westchestergov.com>, 'Alfredo Vidal"<avidal @thevidalgroup.com>, <awsl @weschestergov.com>, "B. Gore' <bgore@ urbanomics.com>,<bakerna@co.rockland.ny.us>, "Barry, Terrence*
<TBarry@entergy.com>, 'Benjamin, Liz"<BenjamiL@co.rockland.ny.us>, "Bentley, Robyn M" <rbentle@entergy.com>,<ken.bergmann
@ semo.state.ny.us>, 'Bernie McGarry" <mcgarry@
senate.state.ny.us>, "Blizard, Andrea J" <ablizar@entergy.com>, <rjo4@westchestergov.com>, <jean_bordewich@schumer.senate.gov>,<schumer@valstar.net>, <jpbl @nrc.gov>, 'Bowman, Greg ' <Goergycom>,<beh@nrc.gov>, <JBridges@troopers.state.ny.us>, 'Chief Tubbb.Chris EK (-Schwar-z <cschwar@entergy.com>, <ewc@nrc.gov>, Comrgtesmy.
>,'Conroy, Patric W' <PConroy@entergy.com>, <lindac@yorktownny.org>, "Cox, Mark R'<mcox90@entergy.com>, <Gcrawford@
urbanomics.com>, 'Curran, Nick'... >, "Dacimo, Fred R' <FDacimo@entergy.com>, "David Brand"W'D avl'David Greene' <dgreene @ urbanomics.com>, 'David Weinraub'<DWeinraub@bmwlobby.com>, 'DeGasperis, Edward M' <edegasp@entergy.com>, "DiRocco, Anthony JO <ADirocc@entergy.com>, <Donald.Maurer@semo.state.ny.us> , ing, Ad.el.<amd2@westchestergov.com>, <Barney.Drew@lafarge-na.com> 1L,'JF,-'Fay, Ex , Deborah' <DFayl @entergy.com>, "Feathers'
<jdf@fcwc-law.com,>, u emo.state.ny.us>, <peter.feroe@mail.house.gov>, 'Geri Shapiro'<Emily.Gibbons@
mail.house.gov>, 'Giguere, Kathleen Mw<KGlguer@entergy.com>, <grtroes@nppd.com>, 'Gottlieb, Laurence'
<LGottli@entergy.com>, "Greene, Dominick'
<dgreene@co.orange.ny.us>, <gac7@westchestergov.com>, 'Grosjean, Alain Go<AGrosje @entergy.com>, <Frank.Guiao
@ lafarge-na.com>, "Harry Glannoulis"<harry@theparksidegroup.com>, "Hinrichs, Gary H" <ghinric@entergy.com>, 'Hipschman, Thomas'<thlps9O@entergy.com>, 'lnzirillo, Frank A" <finzidr@entergy.com>, "Ira Promisel'<Ipromise@troopers.state.ny.us>, "Jack Spath" <jps@nyserda.org>, <dejl @nrc.gov>,<jefft@townofcortlandt.com>, 'Jensen, Chris' <jensenc@co.rockland.ny.us>, "JES"<JES1 @westchestergov.com>, 'Jim Cunningham'
<jim.cunningham@nyc.bm.com>, "Jim Wright"<wrlght@senate.state.ny.us>, "John Cordo" <JLC@fcwc-law.com>, "Jones, T. R.0<tjones2@entergy.com>, 'Kansler, Michael R" <MKansle@entergy.com>, 'Kathleen Wood'<kathleen.wood@chamber.state.ny.us>, <Pat.keegan@mail.house.gov>, 'Kems, Matthew T'K<MKopy@troopers.state.ny.us>, <kevin.kraus@semo.state.ny.us>, 'L. Leach Leach, Don' <DLeach@entergy.com>, <leibell@senate.state.ny.us>, 'Leon, Pete" <Pete.Leon@m-al.hoouse.gov>, <DCL@nrc.gov>, 'Longo, Nick' <longon@co.rockland.ny.us>,"Mark Serrano" <serrano@proactivecom.com>, 'Martin Brennan'<Martin_Brennan@schumer.senate.gov>, 'Marvin Randolph" <mrandolph@urbanomics.com>, "Mayer, Donald M' <DMayerl @entergy.com>, 'McCann, John (ENNE Licensing Director)"<jmccanl @entergy.com>, "McCannell, Chris' <Chris.mccannell@mail.house.gov>, 'McConaghy, Ryan'<ryanMcConaghy@schumer.senate.gov>, 'McGlilicuddy, Maura' <MMcGc e Mike' <mike.mckay@mall.house.gov>,."McMahon, Bob -Putman C OutyMcMullin, Kathleen Mm <KMcMull@entergy.com>, <millera@assembly.state.ny.us>,<MillerC @co.rockland.ny.us>, 'Mitchell, Frank J" <FMitche @ entergy.com>, 'Nell Sheehan'<nas@ nrc.gov>, <rand@schlldasset.com>, <jdn @ nrc.gov>, <Joseph.o'brien
@ mail.house.gov>,<boliveira
@amnucins.com>, <doneill @ bghc-law.com>, 'Pat Brown" <PBrown @ bmwlobby.com>, "Paul Steidler'
<paul@effectivecomm.org>, 'Paul Tonko' <tonkop@assembly.state.ny.us>, "Paulson, Adam"<adam.paulson
@mail.house.gov>, <alp@nyserda.org>, "Phillips, Frank M" <fphilli@entergy.com>,<pjk3@westchestergov.com>, 'Poquette, Thomas' <thomas.poquette@lafarge-na.com>
Date: 05/16/2006 6:21:06 PM
Subject:
IPEC status report for May 16 2006 See attached.inforr tion in this record was dele At. exempta With the Freedom of tJR 11 lqwtUP! 'Ci L-iJ lJ -L.JLOU ic1i~ lg L.i~ 3 .1 IU I I See attached.
~.J! II IOtU~JI i~I L'JI I~J -IVIQ7 I U ~AJ~JU.UU~
__ _ _ r~y~ I-Indian Point Energy Center Status Report May 16, 2006 Operational Status -2R17 Outage Indian Point Unit 2 went into Mode 4 Hot standby on Sunday and remains in Mode 4 awaiting heatup of the system. The unit should be in MODE 3 later tonight.Maintenance crews are conducting post maintenance testing of systems and components repaired during the outage including recirculation pumps, main generator and turbine. The Vapor Containment equipment hatch is closed with the air lock repositioned in the hatch.At left, operators conduct inspections of he weld channels in the Vapor ontainment Below, workers are checking on the ondensate long loop recirculation alves.Concrete shield blocks have been replaced inside the containment.
The concrete shield blocks protect equipment.
The large steel structure is a steam generator; next to and behind the generator is the Pressurizer.
Unit 3 is operati ng at 100% reactor power and has been on-line for 224 days.Ground water Investigation Update viIiotLL; i~I L..VI my" u," I V .uvu.uVu. r..As a follow up to the chemical analyses conducted on the Unit 1 containment spray sump, Entergy continues to sample additional wells near Unit one and the sump for the presence of PCBs. To date, only one sample showed very trace levels of PCB's at.12 ppb. Radiochemistry samples have not yet been analyzed.