|
|
Line 3: |
Line 3: |
| | issue date = 02/28/2007 | | | issue date = 02/28/2007 |
| | title = E-MAIL: (PA) Response from Comment on NRC Documents | | | title = E-MAIL: (PA) Response from Comment on NRC Documents |
| | author name = Knorr R S | | | author name = Knorr R |
| | author affiliation = State of MA, Dept of Public Health | | | author affiliation = State of MA, Dept of Public Health |
| | addressee name = Williamson A R | | | addressee name = Williamson A |
| | addressee affiliation = NRC/NRR/ADRO/DLR | | | addressee affiliation = NRC/NRR/ADRO/DLR |
| | docket = 05000293 | | | docket = 05000293 |
Line 25: |
Line 25: |
| ==Subject:== | | ==Subject:== |
| Response from "Comment on NRC Documents" Below is the result of your feedback form. It was submitted by Robert S. Knorr, Director (Robert.Knorr@state.ma.us) on Wednesday, February 28, 2007 at 16:18:26 DocumentTitle: | | Response from "Comment on NRC Documents" Below is the result of your feedback form. It was submitted by Robert S. Knorr, Director (Robert.Knorr@state.ma.us) on Wednesday, February 28, 2007 at 16:18:26 DocumentTitle: |
| Draft Supplemental Environmental Impact Statement on the Pilgrim Nuclear Power Station located in Plymouth Massachusetts | | Draft Supplemental Environmental Impact Statement on the Pilgrim Nuclear Power Station located in Plymouth Massachusetts |
| [NUREG-1437, Supplement 29 Draft SEIS Pilgrim Nuclear Power Station]Comments: | | [NUREG-1437, Supplement 29 Draft SEIS Pilgrim Nuclear Power Station]Comments: |
| The purpose of this letter is to provide comments on the Draft Supplemental Environmental Impact Statement on the Pilgrim Nuclear Power Station located in Plymouth Massachusetts | | The purpose of this letter is to provide comments on the Draft Supplemental Environmental Impact Statement on the Pilgrim Nuclear Power Station located in Plymouth Massachusetts |
| [NUREG-1437, Supplement 29 Draft SEIS Pilgrim Nuclear Power Station].The comments provided specifically address section 4.7 ("Evaluation of New and Potentially Significant Information on Impacts of Operation during the Renewal Term), pages 4.65-4.66. | | [NUREG-1437, Supplement 29 Draft SEIS Pilgrim Nuclear Power Station].The comments provided specifically address section 4.7 ("Evaluation of New and Potentially Significant Information on Impacts of Operation during the Renewal Term), pages 4.65-4.66. |
| This section discusses the Southeastern Massachusetts Health Study (SMHS) that was conducted by the Massachusetts Department of Public (MDPH).On page 4.66, beginning on line 5 text reads "...with regard to the SMHS, NRC has considered the relevant information in these citations and concludes that the peer reviews and even the authors now agree that the SMHS does not demonstrate a causal relationship between the PNPS effluents and the potential effect of excess cancers in the areas around the site." The MDPH believes this statement is neither a correct summarization of the peer reviews nor the author's published or unpublished opinions.The correct summarization of the second peer review panel would be that: 1. The findings cannot be readily dismissed on the basis of methodological errors or proven biases;2. The association found between leukemia and proximity to the Pilgrim nuclear facility was unexpectedly strong and, this raised concern regarding the biologic plausibility of the study; and 3.However, because the study results could not be dismissed, further study may be warranted, including expanding case finding and including children.The specific statement in the draft report found on page 4-66, lines 7-8, "the SMHS does not demonstrate a causal relationship between the PNPS effluents and the potential effect of excess cancers in the areas around the site", is specifically not correct for the following reasons. The MDPH report specifically states that it is not possible to reach definitive conclusions regarding cause and effect but that the results should be followed up to clarify their public health implications. | | This section discusses the Southeastern Massachusetts Health Study (SMHS) that was conducted by the Massachusetts Department of Public (MDPH).On page 4.66, beginning on line 5 text reads "...with regard to the SMHS, NRC has considered the relevant information in these citations and concludes that the peer reviews and even the authors now agree that the SMHS does not demonstrate a causal relationship between the PNPS effluents and the potential effect of excess cancers in the areas around the site." The MDPH believes this statement is neither a correct summarization of the peer reviews nor the author's published or unpublished opinions.The correct summarization of the second peer review panel would be that: 1. The findings cannot be readily dismissed on the basis of methodological errors or proven biases;2. The association found between leukemia and proximity to the Pilgrim nuclear facility was unexpectedly strong and, this raised concern regarding the biologic plausibility of the study; and 3.However, because the study results could not be dismissed, further study may be warranted, including expanding case finding and including children.The specific statement in the draft report found on page 4-66, lines 7-8, "the SMHS does not demonstrate a causal relationship between the PNPS effluents and the potential effect of excess cancers in the areas around the site", is specifically not correct for the following reasons. The MDPH report specifically states that it is not possible to reach definitive conclusions regarding cause and effect but that the results should be followed up to clarify their public health implications. |
Revision as of 02:10, 13 July 2019
Letter Sequence Other |
---|
|
Results
Other: ML070440355, ML070440356, ML070440358, ML070440359, ML070440402, ML070440406, ML070680341, ML071020291, ML071020319, ML071020383, ML071020483, ML071020505, ML071030021, ML071030022, ML071030042, ML071030069, ML071030191, ML071030211, ML071030221, ML071200177, ML071200179, ML071200187, ML071200188, ML071200197, ML071240467, ML071240473, ML071280766, ML071280811, ML071280814, ML071290120, ML071290155, ML071290298, ML071290387, ML071560466, ML071560469, ML071560479, ML071570036, ML071570037, ML071570049, ML071570052, ML071570059, ML071570063, ML071570118, ML071570122, ML071570124, ML071580958, ML071580962, ML071580965, ML071580976, ML071580981... further results
|
MONTHYEARML0712901552006-05-0909 May 2006 (NPA-PD) Letter to Mary Lampert from the Commonwealth of Massachusetts Executive Office of Heath and Human Services, Department of Public Health, Regarding Child Heath Statistics Project stage: Other ML0704403592007-01-0404 January 2007 E-MAIL: (PD) FW: Pilgrim in the News Project stage: Other ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. Project stage: Other ML0704403952007-01-18018 January 2007 E-mail: (PD) Upcoming Pilgrim Environmental License Renewal Meeting Project stage: Meeting ML0705301852007-01-24024 January 2007 Draft Environmental Impact Statement Public Meeting, January 24, 2007, Evening Transcript-Corrected Project stage: Request ML0705301892007-01-24024 January 2007 Draft Environmental Impact Statement Public Meeting, January 24, 2007, Afternoon Transcript-Corrected Project stage: Request ML0706003092007-01-24024 January 2007 Attachments to Pilgrim Draft Environmental Impact Statement Afternoon Meeting Transcripts Project stage: Request ML0703305622007-01-24024 January 2007 Dseis Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station Project stage: Request ML0704403552007-01-26026 January 2007 E-MAIL: (PA) Backgrounder.Pdf Project stage: Other ML0704403562007-01-26026 January 2007 E-MAIL: (PA) Scan001 (30).pdf Project stage: Other ML0704403582007-01-26026 January 2007 E-MAIL: (PA) Meteorology/Modeling Considerations for Various NRC Regulatory Licensing Programs Project stage: Other ML0704404022007-01-30030 January 2007 E-MAIL: (PD) Pilgrim SEIS Project stage: Other ML0704404062007-01-31031 January 2007 E-mail: (PD) Pilgrim Follow Up Information Project stage: Other ML0706803512007-02-0707 February 2007 E-MAIL: (PD) Pilgrim Meeting Handouts Project stage: Meeting ML0706803412007-02-15015 February 2007 E-MAIL: (PD) Pilgrim SEIS Project stage: Other ML0710300222007-02-28028 February 2007 E-MAIL: (PA) Response from Comment on NRC Documents Project stage: Other ML0707501272007-03-0101 March 2007 E-MAIL: (PD) Requested Document, Safety Evaluation Report with Open Items Related to the License Renewal of Pilgrim Nuclear Power Station Project stage: Approval ML0710300212007-03-0202 March 2007 E-MAIL: (PA) Pilgrim Nuclear Power Station Deis Comments Project stage: Other ML0710204792007-03-0202 March 2007 E-MAIL: (PA) Distribution of Final Document: Summary of Public Meetings Draft SEIS Pilgrim Project stage: Draft Approval ML0710301912007-03-0505 March 2007 E-MAIL: (PD) Request Hard copy-safety Evaluation Report from Mary Lampert To- phb1@nrc.gov 3/5/07 11:32am Project stage: Other ML0710302112007-03-0606 March 2007 E-MAIL: (PD) Week of 2/26 - Conference Calls from Perry Buckberg to Doug Ellis 3/6/07 9:18am Project stage: Other ML0710302212007-03-0707 March 2007 E-MAIL: (PD) Updated - Week of 2/26 Conference Call Record from Perry Buckberg to Doug Ellis 3/7/07 6:36am Project stage: Other ML0710205082007-03-0808 March 2007 E-MAIL: (PA) 1266 DC Mass Ag Comments on Draft EIS 2-28-07.pdf Project stage: Draft Other ML0710204902007-03-0808 March 2007 E-MAIL: (PA) 1266 DC Mass Ag Comments on Draft EIS 2-28-07.pdf Project stage: Draft Other ML0710204832007-03-12012 March 2007 E-mail: (PA) PNPS License Renewal - Cooling Tower Question Project stage: Other ML0710300422007-03-13013 March 2007 E-MAIL: (PD) Copy of LRA Amendment 15 Letter - from Edward Sanchez to phb1@nrc.gov 3/13/07 12:29pm Project stage: Other ML0710300482007-03-19019 March 2007 E-mail: (PD) Meeting Summary - March 14 & 15 2007 - from Perry Buckberg to Doug Ellis 3/19/07 7:05am Project stage: Meeting ML0710300582007-03-20020 March 2007 E-MAIL: (PD) Pilgrim Lr ACRS Subcommittee (Sc) Meeting on 4/4/07 - from Mairtri Banerjee to Lambros Lois; Perry Buckberg 3/20/07 1:20pm Project stage: Meeting ML0710300632007-03-21021 March 2007 E-MAIL: (PD) Fwd: Meeting Summary - March 14 & 15 2007 - from Perry Buckberg to Doug Ellis 3/21/07 1:04pm Project stage: Meeting ML0710205052007-03-21021 March 2007 E-MAIL: (PA) EPA Suspends 316(b) Rule Project stage: Other ML0710300692007-03-22022 March 2007 E-MAIL: (PD) Dry Well - Event Number: 43245 - from Mary Lampert to Perry Buckberg 3/22/07 9:08am Project stage: Other ML0710301762007-03-27027 March 2007 E-MAIL: (PD) Pilgrim Draft ACRS Presentation - from Bryan Ford to Perry Buckberg 3/27/07 5:25pm Project stage: Draft Other ML0710203452007-03-28028 March 2007 E-MAIL: (PD) Revised Draft ACRS Fluence Slides2 Project stage: Draft Other ML0710202962007-03-28028 March 2007 E-MAIL: (PD) Draft Program Detail Pilgrim ACRS Subcommitte Presentation.Ppt Project stage: Draft Other ML0710202912007-03-28028 March 2007 E-MAIL: (PD) Drywell Project stage: Other ML0710203432007-03-29029 March 2007 E-MAIL: (PD) Revised Draft ACRS Fluence Slides Project stage: Draft Other ML0710203162007-03-29029 March 2007 E-MAIL: (PD) Pdf Copy of Entergy Letter Providing Comments on Draft SER on Pilgrim LRA Project stage: Draft Other ML0710203192007-03-29029 March 2007 E-MAIL: (PD) Entergy-Preliminary Durability Performance Evaluation of Perry Project stage: Other ML0710203672007-03-30030 March 2007 E-MAIL: (PD) People Attending ACRS Sub Committee Meeting Project stage: Meeting ML0710203832007-03-30030 March 2007 E-MAIL: (PD) Final Presentation to Advisory Committee on Reactor Safguards Project stage: Other ML0712001772007-04-0202 April 2007 E-MAIL: (PD) Fw: Revised Drywell UT Table and Annulus Drain VT-2 Datasheets Project stage: Other ML0712001972007-04-0202 April 2007 E-MAIL: (PD) Annulus Drain Line Buckets Project stage: Other ML0712001882007-04-0303 April 2007 E-MAIL: (PD) Conference Call Record 4/2/2007 Project stage: Other ML0712001872007-04-12012 April 2007 E-MAIL: (PD) Conference Call Record 4/2/2007 Project stage: Other ML0712808142007-04-13013 April 2007 E-MAIL: (NPA-PD) Entergy Efh Comment References Doc - Pilgrim Project stage: Other ML0712001792007-04-18018 April 2007 E-MAIL: (PD) Copy of PNPS LRA Annual Update Letter Project stage: Other ML0712901202007-04-19019 April 2007 E-mail: (NPA-PD) Entergy Efh Comment References2 - Pilgrim Project stage: Other ML0712808112007-04-20020 April 2007 E-MAIL: (NPA-PD) Entergy Efh Comment References - Pilgrim Project stage: Other ML0712902982007-04-24024 April 2007 E-MAIL (NPA-PD) Paper Abstract Project stage: Other ML0712903872007-04-25025 April 2007 E-mail (NPA-PD) Additional Info/References: Sea Breeze Journal Article Project stage: Other 2007-03-21
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
Alicia Williamson'-
Response from 'Comment 6n NRC D6cuments" P paý .Re ý i From: Robert S. Knorr, Director <Robert.Knorr@state.ma.us>
To: <nrcrep@nrc.gov>
Date: 02/28/2007 4:18:48 PM
Subject:
Response from "Comment on NRC Documents" Below is the result of your feedback form. It was submitted by Robert S. Knorr, Director (Robert.Knorr@state.ma.us) on Wednesday, February 28, 2007 at 16:18:26 DocumentTitle:
Draft Supplemental Environmental Impact Statement on the Pilgrim Nuclear Power Station located in Plymouth Massachusetts
[NUREG-1437, Supplement 29 Draft SEIS Pilgrim Nuclear Power Station]Comments:
The purpose of this letter is to provide comments on the Draft Supplemental Environmental Impact Statement on the Pilgrim Nuclear Power Station located in Plymouth Massachusetts
[NUREG-1437, Supplement 29 Draft SEIS Pilgrim Nuclear Power Station].The comments provided specifically address section 4.7 ("Evaluation of New and Potentially Significant Information on Impacts of Operation during the Renewal Term), pages 4.65-4.66.
This section discusses the Southeastern Massachusetts Health Study (SMHS) that was conducted by the Massachusetts Department of Public (MDPH).On page 4.66, beginning on line 5 text reads "...with regard to the SMHS, NRC has considered the relevant information in these citations and concludes that the peer reviews and even the authors now agree that the SMHS does not demonstrate a causal relationship between the PNPS effluents and the potential effect of excess cancers in the areas around the site." The MDPH believes this statement is neither a correct summarization of the peer reviews nor the author's published or unpublished opinions.The correct summarization of the second peer review panel would be that: 1. The findings cannot be readily dismissed on the basis of methodological errors or proven biases;2. The association found between leukemia and proximity to the Pilgrim nuclear facility was unexpectedly strong and, this raised concern regarding the biologic plausibility of the study; and 3.However, because the study results could not be dismissed, further study may be warranted, including expanding case finding and including children.The specific statement in the draft report found on page 4-66, lines 7-8, "the SMHS does not demonstrate a causal relationship between the PNPS effluents and the potential effect of excess cancers in the areas around the site", is specifically not correct for the following reasons. The MDPH report specifically states that it is not possible to reach definitive conclusions regarding cause and effect but that the results should be followed up to clarify their public health implications.
This conclusion is consistent with that stated by the peer reviewers.
While the findings of the study may not support a causal relationship, the NRC arguments in the Supplemental Impact Statement ignore the principal MDPH and peer review conclusions that the findings cannot be dismissed and that further attention to the possible risks associated with the power plant may be warranted.
We would be happy to answer any questions you may have, or provide additional clarification.
Please feel free to contact us at 617-624-5757.
organization:
Massachusetts Department of Public Health addressl:
Center for Environmental Health Alicia Williamson-Respo nse fro.m "Comment on N Documents" Page 2 address2:
250 Washington Street, 7th Floor city: Boston state: MA zip: 02108 country: US phone: 617-624-5757
cAtemp\GW)000-06.TMP,... .......... ..........P a g e 1 Mail Envelope Properties (45E6E81F.904:
19: 4586)
Subject:
Creation Date From: Created By: Fwd: Response from "Comment on NRC Documents" 03/01/2007 9:50:07 AM NRCREP NRCREPO~nrc.gov Recipients nrc.gov TWGWPO04.HQGWDO01 ARWI (Alicia Williamson)
Post Office TWGWPO04.HQGWDOO1 Route nrc.gov Files MESSAGE TEXT.htm Mail Options Expiration Date: Priority: ReplyRequested:
Return Notification:
Concealed
Subject:
Security: Size 319 232 Date & Time 03/01/2007 9:50:07 AM None Standard No None No Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling'Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled