ML091330025: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091330025
| number = ML091330025
| issue date = 05/21/2009
| issue date = 05/21/2009
| title = 05/12/09 Summary of Meeting with Kewaunee to Discuss a Future Amendment to Convert the Plant TS from Custom to Improved TS Format
| title = Summary of Meeting with Kewaunee to Discuss a Future Amendment to Convert the Plant TS from Custom to Improved TS Format
| author name = Tam P S
| author name = Tam P
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000305
| docket = 05000305
| license number =  
| license number =  
| contact person = Tam P S
| contact person = Tam P
| case reference number = TAC ME0247
| case reference number = TAC ME0247
| package number = ML091330253
| package number = ML091330253
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 May 21, 2009 LICENSEE:      Dominion Energy Kewaunee, Inc. (DEK)
FACILITY:      Kewaunee Power Station (KPS)
 
==SUBJECT:==
 
==SUMMARY==
OF THE MAY 12, 2009, MEETING TO DISCUSS A FUTURE AMENDMENT TO CONVERT THE KPS TECHNICAL SPECIFICATIONS (TS)
TO THE IMPROVED STANDARD TS FORMAT (TAC NO. ME0247)
On May 12, 2009, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of DEK at EXCEL Services Corporation offices located at 11921, Rockville Pike, Rockville, Maryland. The purpose of this meeting was to discuss issues related to DEK's future application for an amendment to convert the KPS Technical Specifications from the current custom format to the improved standard TS (ITS) format. A list of attendees is enclosed; no member of the public was present in the meeting.
The licensee's presentation, depicting its approach to the future processing of the proposed amendment, was outlined by the licensee's handout material (Agencywide Documents and Access Management System (ADAMS) Accession No. ML091330111). The NRC staff discussed with the licensee various aspects of the approach. During the exchange, the following issues were specifically noted:
(1)    The NRC staff stated that there is no identifiable benefit in aligning the review schedule of the KPS license renewal application with the review schedule of the ITS conversion application.
(2)    The NRC staff recommended that the licensee base its upcoming control room habitability (CRH) amendment application on the current custom format. Based on the licensee's plan, the review of the CRH amendment application is expected to move in parallel with the review of the ITS amendment application. If at some time the licensee determines that the CRH amendment would be issued after the ITS amendment, the licensee can then supplement the CRH application with ITS pages. The NRC staff cited Monticello Amendment No. 148 (ADAMS Accession No. ML062790015) as an example which was so supplemented with ITS pages.
No portion of this meeting was closed to the public because no proprietary information was used by the participants.
Before the meeting adjourned, licensee participants were given the opportunity to communicate with the NRC staff both verbally and through the use of public meeting feedback forms. No comment or feedback was received at this time.
 
                                              -2 Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov Sincerely,
(~C~
P;ter S. Tam, Senior Project Manager Plant Licensing Branch '"-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305
 
==Enclosure:==
 
As stated cc w/encl: Distribution via ListServ
 
MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND DOMINION ENERGY KEWAUNEE. INC. (DEK)
LIST OF ATTENDEES KEWAUNEE FUTURE AMENDMENT TO CONVERT TECHNICAL SPECIFICATIONS TO THE IMPROVED STANDARD TECHNICAL SPECIFICATIONS FORMAT MAY 12, 2009 Organization Victor Cusumano              1\1 RC/NRR/Technical Specifications Branch Thomas Breene                Dominion Energy Kewaunee Kristy Bucholtz              NRC/NRR/Technical Specifications Branch Robert Elliott                NRC/NRR/Technical Specifications Branch Matthew Hamm                  NRC/NRR/Technical Specifications Branch Bob Hanley                    Dominion Energy Kewaunee Aron Lewin                    NRC/NRR/Technical Specifications Branch Carl Schulten                NRC/NRR/Technical Specifications Branch Gerald Riste                  Dominion Energy Kewaunee Ray Schiele                  Excel Services Craig Sly                    Dominion Energy Kewaunee Peter Tam                    NRC/NRR/Plant Licensing Branch 111-1 Enclosure
 
                                                -2 Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov Sincerely, IRA!
Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305
 
==Enclosure:==
 
As stated cc w/encl: Distribution via ListServ DISTRIBUTION:
PUBLIC                                LPL3-1 RtF                      RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee Resource            RidsNrrLABTully Resource RidsOgcRpResource RidsAcrsAcnw_MailCTR Resource        RidsRgn3MailCenterResource SCampbell, EDO Rill                  VCusumano, NRR                  RElliott, NRR CSchulten, I'JRR                      ALewin, NRR                    KBucholtz, NRR MHamm, NRR Package: ML091330253 Summary Accession No.: ML091330025 Meeting Notice Accession No.: ML091060330 Licensee's Handout Accession No.:.. ML091330111 OFFICE    LPL3-1/PM      LPL3-1/LA        ITSB          ITSB/BC      LPL3-1/BC NAME        PTam          BTuily    VCusumano          RElliott      LJames DATE      5/15/09        5/14/09        5/18/09          5/19/09        5/21/09 OFFICIAL RECORD COPY}}

Latest revision as of 12:41, 12 March 2020

Summary of Meeting with Kewaunee to Discuss a Future Amendment to Convert the Plant TS from Custom to Improved TS Format
ML091330025
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/21/2009
From: Tam P
Plant Licensing Branch III
To:
Dominion Energy Kewaunee
Tam P
Shared Package
ML091330253 List:
References
TAC ME0247
Download: ML091330025 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 May 21, 2009 LICENSEE: Dominion Energy Kewaunee, Inc. (DEK)

FACILITY: Kewaunee Power Station (KPS)

SUBJECT:

SUMMARY

OF THE MAY 12, 2009, MEETING TO DISCUSS A FUTURE AMENDMENT TO CONVERT THE KPS TECHNICAL SPECIFICATIONS (TS)

TO THE IMPROVED STANDARD TS FORMAT (TAC NO. ME0247)

On May 12, 2009, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of DEK at EXCEL Services Corporation offices located at 11921, Rockville Pike, Rockville, Maryland. The purpose of this meeting was to discuss issues related to DEK's future application for an amendment to convert the KPS Technical Specifications from the current custom format to the improved standard TS (ITS) format. A list of attendees is enclosed; no member of the public was present in the meeting.

The licensee's presentation, depicting its approach to the future processing of the proposed amendment, was outlined by the licensee's handout material (Agencywide Documents and Access Management System (ADAMS) Accession No. ML091330111). The NRC staff discussed with the licensee various aspects of the approach. During the exchange, the following issues were specifically noted:

(1) The NRC staff stated that there is no identifiable benefit in aligning the review schedule of the KPS license renewal application with the review schedule of the ITS conversion application.

(2) The NRC staff recommended that the licensee base its upcoming control room habitability (CRH) amendment application on the current custom format. Based on the licensee's plan, the review of the CRH amendment application is expected to move in parallel with the review of the ITS amendment application. If at some time the licensee determines that the CRH amendment would be issued after the ITS amendment, the licensee can then supplement the CRH application with ITS pages. The NRC staff cited Monticello Amendment No. 148 (ADAMS Accession No. ML062790015) as an example which was so supplemented with ITS pages.

No portion of this meeting was closed to the public because no proprietary information was used by the participants.

Before the meeting adjourned, licensee participants were given the opportunity to communicate with the NRC staff both verbally and through the use of public meeting feedback forms. No comment or feedback was received at this time.

-2 Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov Sincerely,

(~C~

P;ter S. Tam, Senior Project Manager Plant Licensing Branch '"-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305

Enclosure:

As stated cc w/encl: Distribution via ListServ

MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND DOMINION ENERGY KEWAUNEE. INC. (DEK)

LIST OF ATTENDEES KEWAUNEE FUTURE AMENDMENT TO CONVERT TECHNICAL SPECIFICATIONS TO THE IMPROVED STANDARD TECHNICAL SPECIFICATIONS FORMAT MAY 12, 2009 Organization Victor Cusumano 1\1 RC/NRR/Technical Specifications Branch Thomas Breene Dominion Energy Kewaunee Kristy Bucholtz NRC/NRR/Technical Specifications Branch Robert Elliott NRC/NRR/Technical Specifications Branch Matthew Hamm NRC/NRR/Technical Specifications Branch Bob Hanley Dominion Energy Kewaunee Aron Lewin NRC/NRR/Technical Specifications Branch Carl Schulten NRC/NRR/Technical Specifications Branch Gerald Riste Dominion Energy Kewaunee Ray Schiele Excel Services Craig Sly Dominion Energy Kewaunee Peter Tam NRC/NRR/Plant Licensing Branch 111-1 Enclosure

-2 Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov Sincerely, IRA!

Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305

Enclosure:

As stated cc w/encl: Distribution via ListServ DISTRIBUTION:

PUBLIC LPL3-1 RtF RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee Resource RidsNrrLABTully Resource RidsOgcRpResource RidsAcrsAcnw_MailCTR Resource RidsRgn3MailCenterResource SCampbell, EDO Rill VCusumano, NRR RElliott, NRR CSchulten, I'JRR ALewin, NRR KBucholtz, NRR MHamm, NRR Package: ML091330253 Summary Accession No.: ML091330025 Meeting Notice Accession No.: ML091060330 Licensee's Handout Accession No.:.. ML091330111 OFFICE LPL3-1/PM LPL3-1/LA ITSB ITSB/BC LPL3-1/BC NAME PTam BTuily VCusumano RElliott LJames DATE 5/15/09 5/14/09 5/18/09 5/19/09 5/21/09 OFFICIAL RECORD COPY