| number = ML12194A652 | | number = ML12194A652 | ||
| issue date = 07/11/2012 | | issue date = 07/11/2012 | ||
| title = | | title = Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations | ||
| author name = Shea J | | author name = Shea J | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Tennessee | {{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 | ||
Valley Authority, 1101 Market Street, Chattanooga, Tennessee | |||
37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory | ==Subject:== | ||
Commission | Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations | ||
Washington, D.C. 20555-0001 | |||
Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating | ==Reference:== | ||
License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Subject: Response to NRC Regulatory | : 1. NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," | ||
Issue Summary 2012-07, Preparation | dated June 8, 2012 | ||
and Scheduling | : 2. Letter from TVA to NRC, "Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations," dated July 7, 2011 Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2012-07 (Reference 1) requested specific information regarding the Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants. The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for the SQN on NRC Form 536, "Operator Licensing Examination Data." SQN has no initial operator license examination planned for calendar year 2014. | ||
of Operator Licensing | Please note that the information provided in the enclosure updates the information previously provided in Reference 2. Information on the proposed Generic Fundamentals Examination (GFE) schedule for calendar year 2013 is provided since the estimated number of candidates has been revised and also includes a change from June to September. | ||
Printed on recycled paper | |||
Reference: | |||
1. NRC Regulatory | U.S. Nuclear Regulatory Commission Page 2 July 11, 2012 There are no regulatory commitments associated with this submittal. If you have any questions related to this response, please contact Rusty Proffitt at (423) 843-6651. | ||
Issue Summary 2012-07, "Preparation | Res tfully, Shea c President, Nuclear Licensing cV | ||
and Scheduling | |||
of Operator Licensing | ==Enclosure:== | ||
Examinations," dated June 8, 2012 2. Letter from TVA to NRC, "Response | |||
to NRC Regulatory | NRC Form 536, Operator Licensing Examination Data cc (Enclosure): | ||
Issue Summary 2011-04, Preparation | NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant | ||
and Scheduling | |||
of Operator Licensing | ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328 | ||
Examinations," dated July 7, 2011 Nuclear Regulatory | |||
Commission's (NRC) Regulatory | NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 5-201"1) Estimated burden per response to comply with this voluntary information collection request: | ||
Issue Summary (RIS) 2012-07 (Reference | hour. This inforrnation collection is used to plan budgets and resources for operator examinations. Send comments-regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5F53), U.S. Nudear Regulatory Commission, Washington, DC20*555-O .or by nterna e-mail to lrfocolect&Resource@nrc.gov. and to the Desk Ofkcr, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB.-10202, (3150-0131), Ofttce of Management and Budget, Washington, DC 20503. Ifa means used'to impose an information collection does not display a currently valid OMBcontrol number, the NRCmay notconduct orsponsor, and a person is riot required to respond to, the information cogection. | ||
1) requested | FACILITY NRC REKGON Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED ] 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 NUMBER OF REACTOR OPERATORS 7 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2 6 7 3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE I I I I NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY D)ATE 05-13-20.13 12-02-2013 03-02-201.5 11.-30-2.015 AL.TERNATE DATE 05-20-2013 12-09-2013 03-09-2015 12-07-2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 P RO PO SED I_.. ... _ ........ ,I...... .,,I___ | ||
specific information | NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 15 011 0 0 CANDIDATES NRC FORM 536 (9-2011) | ||
regarding | |||
the Sequoyah Nuclear Plant's (SQN) projected | NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 09/30/2014 I(9-2011) Estimated burden per response to comply with this voluntary information collection request: I hour. This intotmaiion coitectiorn is used to plan budgets and resources otI operator exaEminatons. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on and Regulatory Affairs,NEOB-10202, (3150-0131), 0ffce of Management and Budget, Washington, DC 20503. Ita means used to impose an information collection does not display a currently valid OMBcontrol number, the NRC may not conduct or sponsor, and a person is not required:to respond to, the information collection. | ||
operator licensing | FACILITY NRC REGION Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/A ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/A NUMBER OF REACTOR OPERATORS 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 1 2 NUMBER OF SENIOR REACTOR o 0 OPERArORS - LIMITED PROPOSED DATES PRIMARY DATE 12-05-2016 12-04-2017 ALTERNATE DATE 12-12-2016 12-11-2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 201.5 CY N/A PROPOSED I I NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 11 0 0 CANDIDATES NRC FORM 536 (9-2011)}} | ||
examination | |||
schedules | |||
and the estimated number of applicants. | |||
The enclosure | |||
to this letter addresses | |||
the NRC's request and provides an estimate of the examination | |||
requirements | |||
for the SQN on NRC Form 536,"Operator | |||
Licensing | |||
Examination | |||
Data." SQN has no initial operator license examination | |||
planned for calendar year 2014.Please note that the information | |||
provided in the enclosure | |||
updates the information | |||
previously | |||
provided in Reference | |||
2. Information | |||
on the proposed Generic Fundamentals | |||
Examination (GFE) schedule for calendar year 2013 is provided since the estimated | |||
number of candidates | |||
has been revised and also includes a change from June to September. | |||
Printed on recycled paper | |||
U.S. Nuclear Regulatory | |||
Commission | |||
Page 2 July 11, 2012 There are no regulatory | |||
commitments | |||
associated | |||
with this submittal. | |||
If you have any questions | |||
related to this response, please contact Rusty Proffitt at (423) 843-6651.Res tfully, Shea | |||
NRC Form 536, Operator Licensing | |||
Examination | |||
Data cc (Enclosure): | |||
NRC Regional Administrator | |||
-Region II NRC Senior Resident Inspector | |||
-Sequoyah Nuclear Plant | |||
ENCLOSURE NRC Form 536 Operator Licensing | |||
Examination | |||
Data Tennessee | |||
Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328 | |||
NRC FORM 536 U.S. NUCLEAR REGULATORY | |||
COMMISSION | |||
APPROVED BY OMB: NO. 3150-0131 | |||
EXPIRES: 0913012014 | |||
5-201"1) Estimated | |||
burden per response to comply with this voluntary | |||
information | |||
collection | |||
request: hour. This inforrnation | |||
collection | |||
is used to plan budgets and resources | |||
for operator examinations. | |||
Send comments-regarding | |||
burden estimate to the Information | |||
Services Branch OPERATOR LICENSING (T- | |||
Commission, Washington, | |||
and to the Desk Ofkcr, Office of Information | |||
and EXAMINATION | |||
DATA Regulatory | |||
Affairs, NEOB.-10202, (3150-0131), Ofttce of Management | |||
and Budget, Washington, DC 20503. | |||
collection | |||
does not display a currently valid OMBcontrol | |||
number, the | |||
cogection. | |||
FACILITY NRC REKGON Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION | |||
PREPARATION | |||
SCHEDULE PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 ESTIMATED | |||
NUMBER OF LICENSEE-PREPARED | |||
] 1 1 EXAMINATIONS | |||
ESTIMATED | |||
NUMBER OF NRC-PREPARED | |||
0 0 0 0 EXAMINATIONS | |||
B. INITIAL OPERATOR LICENSE EXAMINATIONS | |||
PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 NUMBER OF REACTOR OPERATORS | |||
7 8 8 NUMBER OF SENIOR REACTOR OPERATORS | |||
-INSTANT 2 6 7 3 NUMBER OF SENIOR REACTOR OPERATORS | |||
-UPGRADE I I I I NUMBER OF SENIOR REACTOR OPERATORS | |||
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY D)ATE 05-13-20.13 | |||
12-02-2013 | |||
03-02-201.5 | |||
11.-30-2.015 | |||
AL.TERNATE | |||
DATE 05-20-2013 | |||
12-09-2013 | |||
03-09-2015 | |||
12-07-2015 | |||
C. PROPOSED GENERIC FUNDAMENTALS | |||
EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 P RO PO SED I_.. ... _ ........ ,I...... .,, | |||
DECEMBER MARCH JUNE SEPTEMBER | |||
DECEMBER ESTIMATED NUMBER OF 0 0 15 011 0 0 CANDIDATES | |||
NRC FORM 536 (9-2011) | |||
NRC FORM 536 U.S. NUCLEAR REGULATORY | |||
COMMISSION | |||
APPROVED BY OMB: NO, 3150-0131 | |||
EXPIRES: 09/30/2014 | |||
I(9-2011) | |||
Estimated | |||
burden per response to comply with this voluntary | |||
information | |||
collection | |||
request: I hour. This intotmaiion | |||
coitectiorn | |||
is used to plan budgets and resources | |||
otI operator exaEminatons. | |||
Send comments regarding | |||
burden estimate to the Information | |||
Services Branch OPERATOR LICENSING (T- | |||
Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION | |||
DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on | |||
and Regulatory | |||
Affairs, NEOB-10202, (3150-0131), 0ffce of Management | |||
and Budget, Washington, DC 20503. | |||
collection | |||
does not display a currently valid | |||
respond to, the information | |||
collection. | |||
FACILITY NRC REGION Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION | |||
PREPARATION | |||
SCHEDULE PROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/A ESTIMATED | |||
NUMBER OF LICENSEE-PREPARED | |||
EXAMINATIONS | |||
ESTIMATED | |||
NUMBER OF NRC-PREPARED | |||
0 0 EXAMINATIONS | |||
B. INITIAL OPERATOR LICENSE EXAMINATIONS | |||
PROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/A NUMBER OF REACTOR OPERATORS | |||
8 8 NUMBER OF SENIOR REACTOR OPERATORS | |||
-INSTANT 2 NUMBER OF SENIOR REACTOR OPERATORS | |||
-UPGRADE 1 2 NUMBER OF SENIOR REACTOR o 0 OPERArORS | |||
-LIMITED PROPOSED DATES PRIMARY DATE 12-05-2016 | |||
12-04-2017 | |||
ALTERNATE | |||
DATE 12-12-2016 | |||
12-11-2017 | |||
C. PROPOSED GENERIC FUNDAMENTALS | |||
EXAMINATION (GFE) SCHEDULE CY 201.5 CY N/A PROPOSED I I NUMBER MARCH JUNE SEPTEMBER | |||
DECEMBER MARCH JUNE SEPTEMBER | |||
DECEMBER ESTIMATED NUMBER OF 0 11 0 0 CANDIDATES | |||
NRC FORM 536 (9-2011) | |||
}} |
Latest revision as of 01:59, 12 November 2019
ML12194A652 | |
Person / Time | |
---|---|
Site: | Sequoyah ![]() |
Issue date: | 07/11/2012 |
From: | James Shea Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RIS 2012-07 | |
Download: ML12194A652 (5) | |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
Reference:
- 1. NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations,"
dated June 8, 2012
- 2. Letter from TVA to NRC, "Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations," dated July 7, 2011 Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2012-07 (Reference 1) requested specific information regarding the Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants. The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for the SQN on NRC Form 536, "Operator Licensing Examination Data." SQN has no initial operator license examination planned for calendar year 2014.
Please note that the information provided in the enclosure updates the information previously provided in Reference 2. Information on the proposed Generic Fundamentals Examination (GFE) schedule for calendar year 2013 is provided since the estimated number of candidates has been revised and also includes a change from June to September.
Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 July 11, 2012 There are no regulatory commitments associated with this submittal. If you have any questions related to this response, please contact Rusty Proffitt at (423) 843-6651.
Res tfully, Shea c President, Nuclear Licensing cV
Enclosure:
NRC Form 536, Operator Licensing Examination Data cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant
ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 5-201"1) Estimated burden per response to comply with this voluntary information collection request:
hour. This inforrnation collection is used to plan budgets and resources for operator examinations. Send comments-regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5F53), U.S. Nudear Regulatory Commission, Washington, DC20*555-O .or by nterna e-mail to lrfocolect&Resource@nrc.gov. and to the Desk Ofkcr, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB.-10202, (3150-0131), Ofttce of Management and Budget, Washington, DC 20503. Ifa means used'to impose an information collection does not display a currently valid OMBcontrol number, the NRCmay notconduct orsponsor, and a person is riot required to respond to, the information cogection.
FACILITY NRC REKGON Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED ] 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 NUMBER OF REACTOR OPERATORS 7 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2 6 7 3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE I I I I NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY D)ATE 05-13-20.13 12-02-2013 03-02-201.5 11.-30-2.015 AL.TERNATE DATE 05-20-2013 12-09-2013 03-09-2015 12-07-2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 P RO PO SED I_.. ... _ ........ ,I...... .,,I___
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 15 011 0 0 CANDIDATES NRC FORM 536 (9-2011)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 09/30/2014 I(9-2011) Estimated burden per response to comply with this voluntary information collection request: I hour. This intotmaiion coitectiorn is used to plan budgets and resources otI operator exaEminatons. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on and Regulatory Affairs,NEOB-10202, (3150-0131), 0ffce of Management and Budget, Washington, DC 20503. Ita means used to impose an information collection does not display a currently valid OMBcontrol number, the NRC may not conduct or sponsor, and a person is not required:to respond to, the information collection.
FACILITY NRC REGION Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/A ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/A NUMBER OF REACTOR OPERATORS 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 1 2 NUMBER OF SENIOR REACTOR o 0 OPERArORS - LIMITED PROPOSED DATES PRIMARY DATE 12-05-2016 12-04-2017 ALTERNATE DATE 12-12-2016 12-11-2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 201.5 CY N/A PROPOSED I I NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 11 0 0 CANDIDATES NRC FORM 536 (9-2011)