ML16039A121: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16039A121
| number = ML16039A121
| issue date = 02/18/2016
| issue date = 02/18/2016
| title = Fermi, Unit 2 - Corrections to Amendment No. 201 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 (CAC No. MF7296)
| title = Corrections to Amendment No. 201 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425
| author name = Rankin J K
| author name = Rankin J
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Fessler P
| addressee name = Fessler P
Line 9: Line 9:
| docket = 05000341
| docket = 05000341
| license number = NPF-043
| license number = NPF-043
| contact person = Rankin J K
| contact person = Rankin J
| case reference number = CAC MF7296
| case reference number = CAC MF7296
| document type = Letter, Technical Specifications
| document type = Letter, Technical Specifications
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Mr. Paul Fessler UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 18, 2016 Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 -210 NOC 6400 North Dixie Highway Newport, Ml 48166  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 18, 2016 Mr. Paul Fessler Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, Ml 48166


==SUBJECT:==
==SUBJECT:==
FERMI 2 -CORRECTIONS TO AMENDMENT NO. 201 REGARDING RELOCATION OF SPECIFIC SURVILLANCE FREQUENCIES TO A CONTROLLED PROGRAM BASED ON TECHNICAL SPECIFICATION TASK FORCE CHANGE TSTF-425 (CAC NO. MF7296)  
FERMI 2 - CORRECTIONS TO AMENDMENT NO. 201 REGARDING RELOCATION OF SPECIFIC SURVILLANCE FREQUENCIES TO A LICENSEE-CONTROLLED PROGRAM BASED ON TECHNICAL SPECIFICATION TASK FORCE CHANGE TSTF-425 (CAC NO. MF7296)


==Dear Mr. Fessler:==
==Dear Mr. Fessler:==
On July 14, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued License Amendment No. 201 to Renewed Facility Operating License No. NPF-43 for the Fermi 2 facility (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15155B416).
 
This amendment consisted of changes to the technical specifications (TSs) and Renewed Facility Operating License in response to your application dated September 16, 2014 (ADAMS Accession No. ML 14259A564), as supplemented by letter dated April 17, 2015 (ADAMS Accession No. ML 15107A407).
On July 14, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued License Amendment No. 201 to Renewed Facility Operating License No. NPF-43 for the Fermi 2 facility (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15155B416). This amendment consisted of changes to the technical specifications (TSs) and Renewed Facility Operating License in response to your application dated September 16, 2014 (ADAMS Accession No. ML14259A564), as supplemented by letter dated April 17, 2015 (ADAMS Accession No. ML15107A407). The amendment modified the TSs by relocating specific surveillance frequencies to a licensee-controlled program based on TS Task Force (TSTF)
The amendment modified the TSs by relocating specific surveillance frequencies to a licensee-controlled program based on TS Task Force (TSTF) Change TSTF-425.
Change TSTF-425.
On January 29, 2016, the NRC staff identified an error in the TSs for Fermi 2. Upon further review, it was determined some of the clean pages prepared to support issuance of the amendment contained format and typographical errors; therefore, additional TS pages needed to be corrected.
On January 29, 2016, the NRC staff identified an error in the TSs for Fermi 2. Upon further review, it was determined some of the clean pages prepared to support issuance of the amendment contained format and typographical errors; therefore, additional TS pages needed to be corrected. The NRC has reviewed the corrected TS pages attached and determined that they are consistent with the proposed TS markups included in the application dated September 16, 2014, and the errors were inadvertently introduced in License Amendment No. 201, dated July 14, 2015. The specific corrections are described below.
The NRC has reviewed the corrected TS pages attached and determined that they are consistent with the proposed TS markups included in the application dated September 16, 2014, and the errors were inadvertently introduced in License Amendment No. 201, dated July 14, 2015. The specific corrections are described below. 1. TS page 3.2-4-the heading "3.2.3 LINEAR HEAT GENERATION RATE (LHGR)" was corrected from "3.2.1." 2. TS page 3.3-5 -the words "FUNCTIONAL TEST" in SR 3.3.1.1.5 were capitalized.  
: 1.     TS page 3.2-4-the heading "3.2.3 LINEAR HEAT GENERATION RATE (LHGR)" was corrected from "3.2.1."
: 3. TS pages 3.5-7 and 3.6-21-SRs3.5.1.13 and 3.6.1.6.1 should state, " ... valve is capable of being opened" instead of, " ... valve opens when manually actuated." The change to the SRs were approved by License Amendment No. 190 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12321A234).  
: 2.     TS page 3.3 the words "FUNCTIONAL TEST" in SR 3.3.1.1.5 were capitalized.
: 4. TS page 3.6-34 -SR 3.6.2.3 should state. "Verify each required RHR pump develops a flow 9,250 gpm through the associated heat exchanger while operating in the suppression pool cooling mode." The change from 10,000 gpm to 9,250 gpm was P. Fessler approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12333A327).  
: 3.     TS pages 3.5-7 and 3.6-21-SRs3.5.1.13 and 3.6.1.6.1 should state, " ... valve is capable of being opened" instead of, " ... valve opens when manually actuated." The change to the SRs were approved by License Amendment No. 190 issued in letter dated December 21, 2012 (ADAMS Accession No. ML12321A234).
: 5. TS page 3.6-50 -SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of" 10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML 13112A142).  
: 4.     TS page 3.6 SR 3.6.2.3 should state. "Verify each required RHR pump develops a flow rate~ 9,250 gpm through the associated heat exchanger while operating in the suppression pool cooling mode." The change from 10,000 gpm to 9,250 gpm was
: 6. TS page 3.10-15 -SR 3.10.5.5 should state, "Verify no other CORE AL TERA TIONS are in progress." The addition of the word "other" was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 99102201218).  
 
: 7. TS pages 3.1-17, 3.1-19, 3.6-32, 3. 7-2 -spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns. The NRC staff concludes that the errors were introduced during preparation of the license amendment and are entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility.
P. Fessler                                             approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML12333A327).
Please replace the affected pages in the Fermi 2 TSs with the enclosed pages. If you have any questions regarding this matter, please call me at (301) 415-1530.
: 5.     TS page 3.6 SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of" 10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML13112A142).
Docket No. 50-341  
: 6.     TS page 3.10 SR 3.10.5.5 should state, "Verify no other CORE ALTERATIONS are in progress." The addition of the word "other" was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 99102201218).
: 7.     TS pages 3.1-17, 3.1-19, 3.6-32, 3. 7 spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns.
The NRC staff concludes that the errors were introduced during preparation of the license amendment and are entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility. Please replace the affected pages in the Fermi 2 TSs with the enclosed pages.
If you have any questions regarding this matter, please call me at (301) 415-1530.
Sincerely, 3_)'\A~~-
Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


Sincerely, Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv ENCLOSURE FERMI 2 DOCKET NO. 50-341 CORRECTED PAGES TO LICENSE AMENDMENT NO. 201 TECHNICAL SPECIFICATIONS PAGE 3.1-17 PAGE 3.1-19 PAGE 3.2-4 PAGE 3.3-5 PAGE 3.5-7 PAGE 3.6-21 PAGE 3.6-32 PAGE 3.6-34 PAGE 3.6-50 PAGE 3.7-2 PAGE 3.10-15 ACTIONS (continued)
Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv
CONDITION  
 
: c. One or more control C.l rod scram accumulators inoperable with reactor steam dome pressure < 900 psig. AND -C.2 D. Required Action and D.l associated Completion Time of Required Action B.l or C.l not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE Control Rod Scram Accumulators 3.1.5 REQUIRED ACTION COMPLETION TIME Verify all control Immediately upon rods associated with discovery of inoperable charging water accumulators are header pressure fully inserted.  
ENCLOSURE FERMI 2 DOCKET NO. 50-341 CORRECTED PAGES TO LICENSE AMENDMENT NO. 201 TECHNICAL SPECIFICATIONS PAGE 3.1-17 PAGE 3.1-19 PAGE 3.2-4 PAGE 3.3-5 PAGE 3.5-7 PAGE 3.6-21 PAGE 3.6-32 PAGE 3.6-34 PAGE 3.6-50 PAGE 3.7-2 PAGE 3.10-15
< 940 psig Declare the 1 hour associated control rod inoperable. --------NOTE ---------Not applicable if all inoperable control rod scram accumulators are associated with fully inserted control rods . ... ---------... -----.. ----Place the reactor Immediately mode switch in the shutdown position.
 
FREQUENCY SR 3 .1. 5 .1 Verify each control rod scram accumulator pressure is 940 psig. In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.1-17 Amendment No. 201 ACTIONS (continued)
Control Rod Scram Accumulators 3.1.5 ACTIONS (continued)
CONDITION B. Nine or more OPERABLE B.1 control rods not in compliance with the prescribed withdrawal sequence.
CONDITION                   REQUIRED ACTION                          COMPLETION TIME
SURVEILLANCE REQUIREMENTS AND B.2 SURVEILLANCE REQUIRED ACTION --------NOTE ---------Rod worth minimizer (RWM) may be bypassed as a 11 owed by LCO 3 . 3 . 2 . 1. Rod Pattern Control 3.1.6 COMPLETION TIME Suspend withdrawal of Immediately control rods. Place the reactor mode switch in the shutdown position.
: c. One or more control     C.l     Verify all control                     Immediately upon rod scram accumulators            rods associated with                   discovery of inoperable with                  inoperable                            charging water reactor steam dome                accumulators are                       header pressure pressure < 900 psig.              fully inserted.                       < 940 psig AND C.2      Declare the                           1 hour associated control rod inoperable.
1 hour FREQUENCY SR 3 .1.6.1 Verify all OPERABLE control rods comply with the prescribed withdrawal sequence.
D. Required Action and      D.l      --------NOTE ---------
In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.1-19 Amendment No. !J4, 201 3.2 POWER DISTRIBUTION LIMITS 3.2.3 LINEAR HEAT GENERATION RATE (LHGR) LHGR 3.2.3 LCO 3.2.3 All LHGRs shall be less than or equal to the limits specified in the COLR. APPLICABILITY:
associated Completion            Not applicable if all Time of Required                  inoperable control Action B.l or C.l not            rod scram met.                              accumulators are associated with fully inserted control rods .
THERMAL POWER 25% RTP. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Any LHGR not within A.1 Restore LHGR(s) to 2 hours limits. within limits. B. Required Action and B.l Reduce THERMAL POWER 4 hours associated Completion to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.2.3.1 Verify all LHGRs are less than or equal to the limits specified in the COLR. FERMI -UNIT 2 3.2-4 FREQUENCY Once within 12 hours after 25% RPT AND In accordance with the Surveillance Frequency Control Program Amendment No. 201 RPS Instrumentation 3.3.1.1 SURVEILLANCE REQUIREMENTS (continued)
Place the reactor                     Immediately mode switch in the shutdown position.
SR 3 . 3 . 1. 1. 5 SR 3 . 3 . 1. 1. 6 SR 3 . 3 . 1. 1. 7 SR 3 . 3 . 1. 1. 8 SR 3 . 3 . 1. 1. 9 FERMI -UNIT 2 SURVEILLANCE Perform CHANNEL FUNCTIONAL TEST. FREQUENCY In accordance with the Surveillance Frequency Control Program Verify the source range monitor (SRM) and Prior to fully intermediate range monitor (!RM) channels withdrawing overlap. SRMs from the core ------------------
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3 .1. 5.1   Verify each control rod scram accumulator                     In accordance pressure is ~ 940 psig.                                       with the Surveillance Frequency Control Program FERMI - UNIT 2                       3.1-17                             Amendment No.  ~. 201
NOTE ------------------
 
Only required to be met during entry into MODE 2 from MODE 1. Verify the IRM and APRM channels overlap. In accordance with the Surveillance Frequency Control Program Calibrate the local power range monitors.
Rod Pattern Control 3.1.6 ACTIONS (continued)
In accordance with the Surveillance Frequency Control Program Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program (continued) 3.3-5 Amendment No.-+/-J4. 201 SURVEILLANCE REQUIREMENTS (continued)
CONDITION                   REQUIRED ACTION              COMPLETION TIME B. Nine or more OPERABLE     B.1     -- -- ----NOTE ------ ---
SURVEILLANCE SR 3 . 5 . 1 .
control rods not in              Rod worth minimizer compliance with the              (RWM) may be bypassed prescribed withdrawal            as a11 owed by sequence.                        LCO 3 . 3 . 2. 1.
11 -------------------
Suspend withdrawal of       Immediately control rods.
NOTE --------------------
AND B.2      Place the reactor           1 hour mode switch in the shutdown position.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3 .1.6.1     Verify all OPERABLE control rods comply           In accordance with the prescribed withdrawal sequence.           with the Surveillance Frequency Control Program FERMI - UNIT 2                       3.1-19                 Amendment No. !J4, 201
 
LHGR 3.2.3 3.2 POWER DISTRIBUTION LIMITS 3.2.3 LINEAR HEAT GENERATION RATE (LHGR)
LCO 3.2.3         All LHGRs shall be less than or equal to the limits specified in the COLR.
APPLICABILITY:   THERMAL POWER ~ 25% RTP.
ACTIONS CONDITION                   REQUIRED ACTION         COMPLETION TIME A. Any LHGR not within       A.1     Restore LHGR(s) to     2 hours limits.                           within limits.
B. Required Action and       B.l     Reduce THERMAL POWER   4 hours associated Completion             to< 25% RTP.
Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                             FREQUENCY SR 3.2.3.1     Verify all LHGRs are less than or equal         Once within to the limits specified in the COLR.           12 hours after
                                                                ~ 25% RPT AND In accordance with the Surveillance Frequency Control Program FERMI - UNIT 2                        3.2-4              Amendment No. ~. 201
 
RPS Instrumentation 3.3.1.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                FREQUENCY SR 3 . 3 . 1. 1. 5 Perform CHANNEL FUNCTIONAL TEST.               In accordance with the Surveillance Frequency Control Program SR 3. 3. 1. 1. 6  Verify the source range monitor (SRM) and Prior to fully intermediate range monitor (!RM) channels withdrawing overlap.                                       SRMs from the core SR 3. 3. 1. 1. 7  --- ---------------NOTE ------------- -----
Only required to be met during entry into MODE 2 from MODE 1.
Verify the IRM and APRM channels overlap.     In accordance with the Surveillance Frequency Control Program SR 3 . 3. 1. 1. 8  Calibrate the local power range monitors.     In accordance with the Surveillance Frequency Control Program SR 3 . 3. 1. 1. 9  Perform CHANNEL FUNCTIONAL TEST.               In accordance with the Surveillance Frequency Control Program (continued)
FERMI - UNIT 2                        3.3-5               Amendment No.-+/-J4. 201
 
ECCS-Operati ng 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                       FREQUENCY SR 3 . 5 . 1 . 11 - - - - - -- - - - - - - -- - - - - NOTE --------------------
Vessel injection/spray may be excluded.
Vessel injection/spray may be excluded.
Verify each ECCS injection/spray subsystem actuates on an actual or simulated automatic initiation signal. SR 3 . 5 . 1. 12 -------------------
Verify each ECCS injection/spray subsystem                     In accordance actuates on an actual or simulated                             with the automatic initiation signal.                                   Surveillance Frequency Control Program SR 3 . 5. 1. 12   -------------------NOTE - ----------- --------
NOTE --------------------
Valve actuation may be excluded.
Valve actuation may be excluded.
Verify the ADS actuates on an actual or simulated automatic initiation signal. SR 3.5.1.13 Verify each ADS valve is capable of being opened. SR 3 . 5 .1 .14 -------------------
Verify the ADS actuates on an actual or                         In accordance simulated automatic initiation signal.                         with the Surveillance Frequency Control Program SR 3.5.1.13       Verify each ADS valve is capable of being                       In accordance opened.                                                         with the Surveillance Frequency Control Program SR 3 . 5 .1 .14   ------- ------------NOTE - --- ------ --- -------
NOTE --------------------
ECCS instrumentation response times are not required to be measured.
ECCS instrumentation response times are not required to be measured.
ECCS-Operati ng 3.5.1 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Verify ECCS RESPONSE TIME is within limits. In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.5-7 Amendment No. 201 LLS Valves 3.6.1.6 SURVEILLANCE REQUIREMENTS SR 3 . 6 . 1. 6 . 1 SR 3 . 6 . 1. 6 . 2 FERMI -UNIT 2 SURVEILLANCE FREQUENCY Verify each LLS valve is capable of being In accordance opened. with the Surveillance Frequency Control Program ------------------
Verify ECCS RESPONSE TIME is within limits.                     In accordance with the Surveillance Frequency Control Program FERMI - UNIT 2                                         3.5-7           Amendment No.  ~ ~. 201
NOTE -------------------
 
LLS Valves 3.6.1.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE                              FREQUENCY SR 3. 6 . 1. 6 . 1 Verify each LLS valve is capable of being     In accordance opened.                                       with the Surveillance Frequency Control Program SR 3 .6 . 1. 6 .2  ---- ---- ----------NOTE -------------- -----
Valve actuation may be excluded.
Valve actuation may be excluded.
Verify the LLS System actuates on an actual or simulated automatic initiation signal. In accordance with the Surveillance Frequency Control Program 3.6-21 Amendment No. l.J4 +/-9-0, 201 3.6 CONTAINMENT SYSTEMS Suppression Pool Water Level 3.6.2.2 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2 Suppression pool water level shall -2 inches and s +2 inches. APPLICABILITY:
Verify the LLS System actuates on an           In accordance actual or simulated automatic initiation     with the signal.                                       Surveillance Frequency Control Program FERMI - UNIT 2                          3.6-21           Amendment No. l.J4 +/-9-0, 201
MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Suppression pool water A.1 Restore suppression 2 hours level not within pool water level to limits. within limits. B. Required Action and B.l Be in MODE 3. 12 hours associated Completion Time not met. AND -B.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SR 3.6.2.2.1 FERMI -UNIT 2 SURVEILLANCE FREQUENCY Verify suppression pool water level is In accordance within limits. with the Surveillance Frequency Control Program 3.6-32 Amendment No. +/-J4, 201 RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SR 3.6.2.3.1 SR 3.6.2.3.2 FERMI -UNIT 2 SURVEILLANCE Verify each RHR suppression pool cooling subsystem manual. power operated.
 
and automatic valve in the flow path that is not locked. sealed, or otherwise secured in position is in the correct position or can be aligned to the correct position.
Suppression Pool Water Level 3.6.2.2 3.6 CONTAINMENT SYSTEMS 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2       Suppression pool water level shall   be~  -2 inches and s +2 inches.
Verify each required RHR pump develops a flow rate 9,250 gpm through the associated heat exchanger while operating in the suppression pool cooling mode. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Inservice Testing Program 3.6-34 Amendment No. !J4. +/-9-+/-, 201 SURVEILLANCE REQUIREMENTS SR 3.6.4.3.1 SR 3.6.4.3.2 SR 3.6.4.3.3 SR 3.6.4.3.4 SURVEILLANCE Operate each SGT subsystem for 15 continuous minutes with heaters operating.
APPLICABILITY:   MODES 1, 2, and 3.
Perform required SGT filter testing in accordance with the Ventilation Filter Testing Program (VFTP). Verify each SGT subsystem actuates on an actual or simulated initiation signal. Verify each SGT filter cooler bypass damper can be opened and the fan started. SGT System 3.6.4.3 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.6-50 Amendment No. 201 ACTIONS (continued)
ACTIONS CONDITION                   REQUIRED ACTION           COMPLETION TIME A. Suppression pool water A.1         Restore suppression     2 hours level not within                 pool water level to limits.                           within limits.
CONDITION REQUIRED ACT! ON D. Required Action and D.l --------NOTE ---------associated Completion LCD 3.0.4.a is not Time of Condition A, applicable when B, or C not met. entering MODE 3. ----................................
B. Required Action and         B.l   Be in MODE 3.           12 hours associated Completion Time not met.             -AND B.2   Be in MODE 4.           36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                FREQUENCY SR 3.6.2.2.1     Verify suppression pool water level is       In accordance within limits.                               with the Surveillance Frequency Control Program FERMI - UNIT 2                      3.6-32               Amendment No. +/-J4, 201
Be in MODE 3. E. Both RHRSW subsystems E.l --------NOTE ---------inoperable for reasons Enter applicable other than Conditions and Condition B. Required Actions of LCD 3.4.8 for RHR shutdown cooling made inoperable by RHRSW System . .. ----........ ---.............. --.. Restore one RHRSW subsystem to OPERABLE status. F. Required Action and F.1 Be in MODE 3. associated Completion Time of Condition E AND not met. -F.2 Be in MODE 4. SURVEILLANCE REQUIREMENTS SR 3 .7 .1.1 SURVEILLANCE Verify each RHRSW manual, power operated.
 
and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.
RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                            FREQUENCY SR 3.6.2.3.1     Verify each RHR suppression pool cooling   In accordance subsystem manual. power operated. and       with the automatic valve in the flow path that is   Surveillance not locked. sealed, or otherwise secured   Frequency in position is in the correct position or   Control Program can be aligned to the correct position.
RHRSW System 3.7.1 COMPLETION TIME 12 hours 8 hours 12 hours 36 hours FREQUENCY In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.7-2 Amendment No. +/-94, 201 Single CRD Removal-Refueling 3.10.5 SURVEILLANCE REQUIREMENTS SR 3.10.5.1 SR 3.10.5.2 SR 3.10.5.3 SR 3.10.5.4 SR 3.10.5.5 FERMI
SR 3.6.2.3.2    Verify each required RHR pump develops a   In accordance flow rate ~ 9,250 gpm through the          with the associated heat exchanger while operating   Inservice in the suppression pool cooling mode.       Testing Program FERMI - UNIT 2                      3.6-34         Amendment No. !J4. +/-9-+/-, 201
* UNIT 2 SURVEILLANCE Verify all control rods. other than the control rod withdrawn for the removal of the associated CRD. are fully inserted.
 
Verify all control rods. other than the control rod withdrawn for the removal of the associated CRD. in a five by five array centered on the control rod withdrawn for the removal of the associated CRD. are disarmed.
SGT System 3.6.4.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                            FREQUENCY SR 3.6.4.3.1    Operate each SGT subsystem for ~ 15         In accordance continuous minutes with heaters           with the operating.                                 Surveillance Frequency Control Program SR 3.6.4.3.2    Perform required SGT filter testing in     In accordance accordance with the Ventilation Filter     with the VFTP Testing Program (VFTP).
Verify a control rod withdrawal block is inserted.
SR 3.6.4.3.3    Verify each SGT subsystem actuates on an   In accordance actual or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.6.4.3.4    Verify each SGT filter cooler bypass       In accordance damper can be opened and the fan started. with the Surveillance Frequency Control Program FERMI - UNIT 2                       3.6-50       Amendment No. ~. ~.      201
Perform SR 3.1.1.1. Verify no other CORE ALTERATIONS are in progress.
 
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program According to SR 3.1.1.1 In accordance with the Surveillance Frequency Control Program 3.10-15 Amendment No. +/-J4, 201 P. Fessler approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12333A327).  
RHRSW System 3.7.1 ACTIONS (continued)
: 5. TS page 3.6-50 -SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of "10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML 13112A142).  
CONDITION                   REQUIRED ACT! ON                                 COMPLETION TIME D. Required Action and         D.l     -- ------NOTE ----- ----
: 6. TS page 3.10-15 -SR 3.10.5.5 should state, "Verify no other CORE ALTERATIONS are in progress." The addition of the word "other'' was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 9910220121B).  
associated Completion               LCD 3.0.4.a is not Time of Condition A,               applicable when B, or C not met.                   entering MODE 3.
: 7. TS pages 3.1-17, 3.1-19, 3.6-32, 3.7-2 -spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns. The NRC staff concludes that the errors were introduced during preparation of the license amendment and is entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility.
Be in MODE 3.                                   12 hours E. Both RHRSW subsystems       E.l     -- -- ----NOTE ------ ---
Please replace the affected pages in the Fermi 2 TSs with the enclosed pages. If you have any questions regarding this matter, please call me at (301) 415-1530.
inoperable for reasons             Enter applicable other than                         Conditions and Condition B.                       Required Actions of LCD 3.4.8 for RHR shutdown cooling made inoperable by RHRSW System .
Docket No. 50-341  
Restore one RHRSW                               8 hours subsystem to OPERABLE status.
F. Required Action and         F.1     Be in MODE 3.                                   12 hours associated Completion Time of Condition E       AND not met.
F.2     Be in MODE 4.                                   36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                      FREQUENCY SR 3 .7 .1.1     Verify each RHRSW manual, power operated.                               In accordance and automatic valve in the flow path, that                             with the is not locked, sealed, or otherwise secured                             Surveillance in position, is in the correct position or                             Frequency can be aligned to the correct position.                                 Control Program FERMI - UNIT 2                         3.7-2                           Amendment No.         ~  +/-94, 201
 
Single CRD Removal-Refueling 3.10.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                            FREQUENCY SR 3.10.5.1   Verify all control rods. other than the       In accordance control rod withdrawn for the removal of     with the the associated CRD. are fully inserted.       Surveillance Frequency Control Program SR 3.10.5.2    Verify all control rods. other than the       In accordance control rod withdrawn for the removal of     with the the associated CRD. in a five by five array   Surveillance centered on the control rod withdrawn for     Frequency the removal of the associated CRD. are       Control Program disarmed.
SR 3.10.5.3    Verify a control rod withdrawal block is     In accordance inserted.                                     with the Surveillance Frequency Control Program SR 3.10.5.4    Perform SR 3.1.1.1.                           According to SR 3.1.1.1 SR 3.10.5.5    Verify no other CORE ALTERATIONS are in      In accordance progress.                                    with the Surveillance Frequency Control Program FERMI
* UNIT 2                      3.10-15             Amendment No. +/-J4, 201
 
ML12333A327).
: 5.     TS page 3.6 SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of "10 continuous hours." The change to this SR was approved by License Amendment No.
192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML13112A142).
: 6.     TS page 3.10 SR 3.10.5.5 should state, "Verify no other CORE ALTERATIONS are in progress." The addition of the word "other'' was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 9910220121B).
: 7.     TS pages 3.1-17, 3.1-19, 3.6-32, 3.7 spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns.
The NRC staff concludes that the errors were introduced during preparation of the license amendment and is entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility. Please replace the affected pages in the Fermi 2 TSs with the enclosed pages.
If you have any questions regarding this matter, please call me at (301) 415-1530.
Sincerely, IRA/
Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


Sincerely, IRA/ Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv DISTRIBUTION:
Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsNrrPMFermi Resource RidsNrrDorlLpl3-1 Resource RidsAcrsAcnm_MailCTR Resource ADAMS Accession No.: ML 16039A121 OFFICE DORL/LPLI 11-1 /PM DORL/LPLlll-1/LA NAME JRankin MHenderson DATE 2/10/2016 2/10/2016 RidsRgn3MailCenter Resource RidsNrrLAMHenderson Resource RecordsAmend Resource DORL/LPLI 11-1 /BC DORL/LPLlll-1/PM DWrona JRankin 2/18/2016 2/18/2016 OFFICIAL RECORD COPY}}
PUBLIC                                             RidsRgn3MailCenter Resource LPL3-1 R/F                                         RidsNrrLAMHenderson Resource RidsNrrPMFermi Resource                            RecordsAmend Resource RidsNrrDorlLpl3-1 Resource RidsAcrsAcnm_MailCTR Resource ADAMS Accession No.: ML16039A121 OFFICE DORL/LPLI 11-1 /PM DORL/LPLlll-1/LA DORL/LPLI 11-1 /BC DORL/LPLlll-1/PM NAME          JRankin            MHenderson            DWrona               JRankin DATE        2/10/2016            2/10/2016            2/18/2016           2/18/2016}}

Latest revision as of 06:26, 5 February 2020

Corrections to Amendment No. 201 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425
ML16039A121
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/18/2016
From: Jennivine Rankin
Plant Licensing Branch III
To: Fessler P
DTE Electric Company
Rankin J
References
CAC MF7296
Download: ML16039A121 (15)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 18, 2016 Mr. Paul Fessler Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, Ml 48166

SUBJECT:

FERMI 2 - CORRECTIONS TO AMENDMENT NO. 201 REGARDING RELOCATION OF SPECIFIC SURVILLANCE FREQUENCIES TO A LICENSEE-CONTROLLED PROGRAM BASED ON TECHNICAL SPECIFICATION TASK FORCE CHANGE TSTF-425 (CAC NO. MF7296)

Dear Mr. Fessler:

On July 14, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued License Amendment No. 201 to Renewed Facility Operating License No. NPF-43 for the Fermi 2 facility (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15155B416). This amendment consisted of changes to the technical specifications (TSs) and Renewed Facility Operating License in response to your application dated September 16, 2014 (ADAMS Accession No. ML14259A564), as supplemented by letter dated April 17, 2015 (ADAMS Accession No. ML15107A407). The amendment modified the TSs by relocating specific surveillance frequencies to a licensee-controlled program based on TS Task Force (TSTF)

Change TSTF-425.

On January 29, 2016, the NRC staff identified an error in the TSs for Fermi 2. Upon further review, it was determined some of the clean pages prepared to support issuance of the amendment contained format and typographical errors; therefore, additional TS pages needed to be corrected. The NRC has reviewed the corrected TS pages attached and determined that they are consistent with the proposed TS markups included in the application dated September 16, 2014, and the errors were inadvertently introduced in License Amendment No. 201, dated July 14, 2015. The specific corrections are described below.

1. TS page 3.2-4-the heading "3.2.3 LINEAR HEAT GENERATION RATE (LHGR)" was corrected from "3.2.1."
2. TS page 3.3 the words "FUNCTIONAL TEST" in SR 3.3.1.1.5 were capitalized.
3. TS pages 3.5-7 and 3.6-21-SRs3.5.1.13 and 3.6.1.6.1 should state, " ... valve is capable of being opened" instead of, " ... valve opens when manually actuated." The change to the SRs were approved by License Amendment No. 190 issued in letter dated December 21, 2012 (ADAMS Accession No. ML12321A234).
4. TS page 3.6 SR 3.6.2.3 should state. "Verify each required RHR pump develops a flow rate~ 9,250 gpm through the associated heat exchanger while operating in the suppression pool cooling mode." The change from 10,000 gpm to 9,250 gpm was

P. Fessler approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML12333A327).

5. TS page 3.6 SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of" 10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML13112A142).
6. TS page 3.10 SR 3.10.5.5 should state, "Verify no other CORE ALTERATIONS are in progress." The addition of the word "other" was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 99102201218).
7. TS pages 3.1-17, 3.1-19, 3.6-32, 3. 7 spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns.

The NRC staff concludes that the errors were introduced during preparation of the license amendment and are entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility. Please replace the affected pages in the Fermi 2 TSs with the enclosed pages.

If you have any questions regarding this matter, please call me at (301) 415-1530.

Sincerely, 3_)'\A~~-

Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv

ENCLOSURE FERMI 2 DOCKET NO. 50-341 CORRECTED PAGES TO LICENSE AMENDMENT NO. 201 TECHNICAL SPECIFICATIONS PAGE 3.1-17 PAGE 3.1-19 PAGE 3.2-4 PAGE 3.3-5 PAGE 3.5-7 PAGE 3.6-21 PAGE 3.6-32 PAGE 3.6-34 PAGE 3.6-50 PAGE 3.7-2 PAGE 3.10-15

Control Rod Scram Accumulators 3.1.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

c. One or more control C.l Verify all control Immediately upon rod scram accumulators rods associated with discovery of inoperable with inoperable charging water reactor steam dome accumulators are header pressure pressure < 900 psig. fully inserted. < 940 psig AND C.2 Declare the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated control rod inoperable.

D. Required Action and D.l --------NOTE ---------

associated Completion Not applicable if all Time of Required inoperable control Action B.l or C.l not rod scram met. accumulators are associated with fully inserted control rods .

Place the reactor Immediately mode switch in the shutdown position.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3 .1. 5.1 Verify each control rod scram accumulator In accordance pressure is ~ 940 psig. with the Surveillance Frequency Control Program FERMI - UNIT 2 3.1-17 Amendment No. ~. 201

Rod Pattern Control 3.1.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Nine or more OPERABLE B.1 -- -- ----NOTE ------ ---

control rods not in Rod worth minimizer compliance with the (RWM) may be bypassed prescribed withdrawal as a11 owed by sequence. LCO 3 . 3 . 2. 1.

Suspend withdrawal of Immediately control rods.

AND B.2 Place the reactor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> mode switch in the shutdown position.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3 .1.6.1 Verify all OPERABLE control rods comply In accordance with the prescribed withdrawal sequence. with the Surveillance Frequency Control Program FERMI - UNIT 2 3.1-19 Amendment No. !J4, 201

LHGR 3.2.3 3.2 POWER DISTRIBUTION LIMITS 3.2.3 LINEAR HEAT GENERATION RATE (LHGR)

LCO 3.2.3 All LHGRs shall be less than or equal to the limits specified in the COLR.

APPLICABILITY: THERMAL POWER ~ 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Any LHGR not within A.1 Restore LHGR(s) to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limits. within limits.

B. Required Action and B.l Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion to< 25% RTP.

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.3.1 Verify all LHGRs are less than or equal Once within to the limits specified in the COLR. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after

~ 25% RPT AND In accordance with the Surveillance Frequency Control Program FERMI - UNIT 2 3.2-4 Amendment No. ~. 201

RPS Instrumentation 3.3.1.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3 . 3 . 1. 1. 5 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3. 3. 1. 1. 6 Verify the source range monitor (SRM) and Prior to fully intermediate range monitor (!RM) channels withdrawing overlap. SRMs from the core SR 3. 3. 1. 1. 7 --- ---------------NOTE ------------- -----

Only required to be met during entry into MODE 2 from MODE 1.

Verify the IRM and APRM channels overlap. In accordance with the Surveillance Frequency Control Program SR 3 . 3. 1. 1. 8 Calibrate the local power range monitors. In accordance with the Surveillance Frequency Control Program SR 3 . 3. 1. 1. 9 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program (continued)

FERMI - UNIT 2 3.3-5 Amendment No.-+/-J4. 201

ECCS-Operati ng 3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3 . 5 . 1 . 11 - - - - - -- - - - - - - -- - - - - NOTE --------------------

Vessel injection/spray may be excluded.

Verify each ECCS injection/spray subsystem In accordance actuates on an actual or simulated with the automatic initiation signal. Surveillance Frequency Control Program SR 3 . 5. 1. 12 -------------------NOTE - ----------- --------

Valve actuation may be excluded.

Verify the ADS actuates on an actual or In accordance simulated automatic initiation signal. with the Surveillance Frequency Control Program SR 3.5.1.13 Verify each ADS valve is capable of being In accordance opened. with the Surveillance Frequency Control Program SR 3 . 5 .1 .14 ------- ------------NOTE - --- ------ --- -------

ECCS instrumentation response times are not required to be measured.

Verify ECCS RESPONSE TIME is within limits. In accordance with the Surveillance Frequency Control Program FERMI - UNIT 2 3.5-7 Amendment No. ~ ~. 201

LLS Valves 3.6.1.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 6 . 1. 6 . 1 Verify each LLS valve is capable of being In accordance opened. with the Surveillance Frequency Control Program SR 3 .6 . 1. 6 .2 ---- ---- ----------NOTE -------------- -----

Valve actuation may be excluded.

Verify the LLS System actuates on an In accordance actual or simulated automatic initiation with the signal. Surveillance Frequency Control Program FERMI - UNIT 2 3.6-21 Amendment No. l.J4 +/-9-0, 201

Suppression Pool Water Level 3.6.2.2 3.6 CONTAINMENT SYSTEMS 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2 Suppression pool water level shall be~ -2 inches and s +2 inches.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Suppression pool water A.1 Restore suppression 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> level not within pool water level to limits. within limits.

B. Required Action and B.l Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. -AND B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.2.1 Verify suppression pool water level is In accordance within limits. with the Surveillance Frequency Control Program FERMI - UNIT 2 3.6-32 Amendment No. +/-J4, 201

RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool cooling In accordance subsystem manual. power operated. and with the automatic valve in the flow path that is Surveillance not locked. sealed, or otherwise secured Frequency in position is in the correct position or Control Program can be aligned to the correct position.

SR 3.6.2.3.2 Verify each required RHR pump develops a In accordance flow rate ~ 9,250 gpm through the with the associated heat exchanger while operating Inservice in the suppression pool cooling mode. Testing Program FERMI - UNIT 2 3.6-34 Amendment No. !J4. +/-9-+/-, 201

SGT System 3.6.4.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each SGT subsystem for ~ 15 In accordance continuous minutes with heaters with the operating. Surveillance Frequency Control Program SR 3.6.4.3.2 Perform required SGT filter testing in In accordance accordance with the Ventilation Filter with the VFTP Testing Program (VFTP).

SR 3.6.4.3.3 Verify each SGT subsystem actuates on an In accordance actual or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.6.4.3.4 Verify each SGT filter cooler bypass In accordance damper can be opened and the fan started. with the Surveillance Frequency Control Program FERMI - UNIT 2 3.6-50 Amendment No. ~. ~. 201

RHRSW System 3.7.1 ACTIONS (continued)

CONDITION REQUIRED ACT! ON COMPLETION TIME D. Required Action and D.l -- ------NOTE ----- ----

associated Completion LCD 3.0.4.a is not Time of Condition A, applicable when B, or C not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Both RHRSW subsystems E.l -- -- ----NOTE ------ ---

inoperable for reasons Enter applicable other than Conditions and Condition B. Required Actions of LCD 3.4.8 for RHR shutdown cooling made inoperable by RHRSW System .

Restore one RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem to OPERABLE status.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition E AND not met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3 .7 .1.1 Verify each RHRSW manual, power operated. In accordance and automatic valve in the flow path, that with the is not locked, sealed, or otherwise secured Surveillance in position, is in the correct position or Frequency can be aligned to the correct position. Control Program FERMI - UNIT 2 3.7-2 Amendment No. ~ +/-94, 201

Single CRD Removal-Refueling 3.10.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.5.1 Verify all control rods. other than the In accordance control rod withdrawn for the removal of with the the associated CRD. are fully inserted. Surveillance Frequency Control Program SR 3.10.5.2 Verify all control rods. other than the In accordance control rod withdrawn for the removal of with the the associated CRD. in a five by five array Surveillance centered on the control rod withdrawn for Frequency the removal of the associated CRD. are Control Program disarmed.

SR 3.10.5.3 Verify a control rod withdrawal block is In accordance inserted. with the Surveillance Frequency Control Program SR 3.10.5.4 Perform SR 3.1.1.1. According to SR 3.1.1.1 SR 3.10.5.5 Verify no other CORE ALTERATIONS are in In accordance progress. with the Surveillance Frequency Control Program FERMI

  • UNIT 2 3.10-15 Amendment No. +/-J4, 201

ML12333A327).

5. TS page 3.6 SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of "10 continuous hours." The change to this SR was approved by License Amendment No.

192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML13112A142).

6. TS page 3.10 SR 3.10.5.5 should state, "Verify no other CORE ALTERATIONS are in progress." The addition of the word "other was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 9910220121B).
7. TS pages 3.1-17, 3.1-19, 3.6-32, 3.7 spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns.

The NRC staff concludes that the errors were introduced during preparation of the license amendment and is entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility. Please replace the affected pages in the Fermi 2 TSs with the enclosed pages.

If you have any questions regarding this matter, please call me at (301) 415-1530.

Sincerely, IRA/

Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn3MailCenter Resource LPL3-1 R/F RidsNrrLAMHenderson Resource RidsNrrPMFermi Resource RecordsAmend Resource RidsNrrDorlLpl3-1 Resource RidsAcrsAcnm_MailCTR Resource ADAMS Accession No.: ML16039A121 OFFICE DORL/LPLI 11-1 /PM DORL/LPLlll-1/LA DORL/LPLI 11-1 /BC DORL/LPLlll-1/PM NAME JRankin MHenderson DWrona JRankin DATE 2/10/2016 2/10/2016 2/18/2016 2/18/2016