IR 05000317/2017006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Catts M
| author name = Catts M
| author affiliation = NRC/RGN-I
| author affiliation = NRC/RGN-I
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Nuclear, Exelon Nuclear Generation Corp
| addressee affiliation = Exelon Nuclear, Exelon Nuclear Generation Corp
| docket = 05000317, 05000318
| docket = 05000317, 05000318
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406
{{#Wiki_filter:ebruary 28, 2018
-2713 February 28, 2018 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2017 006 AND 05000318/2017 006, REPORT 05000317/2017402 AND 05000318/2017402, REPORT 05000317/2017501 AND 05000318/2017501
==SUBJECT:==
) Dear Mr. Hanson
ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2017006 AND 05000318/2017006, REPORT 05000317/2017402 AND 05000318/2017402, REPORT 05000317/2017501 AND 05000318/2017501)
: The NRC has completed its end
-of-cycle performance assessment of Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs)
, reviewing performance indicators (PIs)
, inspection results , and enforcement actions from January 1, 20 17 through December 31, 20 1 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC concluded that overall performance at your facility preserved public health and safet The NRC determined the performance at Calvert Cliffs during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC
's Reactor Oversight Process (ROP) Action Matrix
, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green.) Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through December 31
, 20 1 This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondenc The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes
. In addition to normal baseline inspections, the NRC will be performing Inspection Procedure (IP) 81311, "Physical Security Requirements for Independent Spent Fuel Storage Installations (ISFSI), and IP 60855.1, "Operation of an ISFSI at Operating Plants," at your facilit In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


B. Hanson 2 Please contact me at 610-337-50 12 with any questions you have regarding this lette
==Dear Mr. Hanson:==
The NRC has completed its end-of-cycle performance assessment of Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.


Sincerely,/RA/ Michelle Catts, Acting Chief Projects Branch 1 Division of Reactor Projects Docket No and 50
The NRC determined the performance at Calvert Cliffs during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green.) Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
-318 License No DPR-53 and DPR
-69


===Enclosure:===
The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Calvert Cliffs Inspection Plan cc: Distribution via ListServ


B. Hanson 3
In addition to normal baseline inspections, the NRC will be performing Inspection Procedure (IP)
81311, Physical Security Requirements for Independent Spent Fuel Storage Installations (ISFSI), and IP 60855.1, Operation of an ISFSI at Operating Plants, at your facility.


SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2017 006 AND 05000318/2017 006, REPORT 05000317/2017402 AND 05000318/2017402, REPORT 05000317/2017501 AND 05000318/2017501)
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5012 with any questions you have regarding this letter.
DATED FEBRUARY 28, 2018 Distribution w/encl
: (via E-mail) DLew, RA (R1ORAMAIL RESOURCE)
DCollins, DRA (R1ORAMAIL RESOURCE)
DPelton, DRP (R1DRPMAIL RESOURCE)
MGray, DRP (R1DRPMAIL RESOURCE)
JYerokun, DRS (R1DRSMAIL RESOURCE)
BWelling, DRS (R1DRSMAIL RESOURCE)
MCatts, DRP ARosebrook, DRP MHardgrove, DRP SObadina, DRP RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA JBowen, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource ROPReports Resource DRS Branch Chiefs (6)
DScrenci, PAO NSheehan, PAO JGreives, SLO DTifft, SLO ROPAssessment Resource RidsNrrDirslpabResources DOCUMENT NAME:
S:\ROP Assessment Meetings
\ROP-18 EOC Review
\Branch 1\Calvert Cliffs
\Calvert Cliffs 2017 Annual Assessment Letter.docx ADAMS ACCESSION NUMBER:
ML18053A694 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME A.Rosebrook M.Catts DATE 2/15/18 2/20/18 OFFICIAL RECORD CO PY Calvert Cliffs


01/01/2018 - 12/31/2019
Sincerely,
 
/RA/
Unit Start End Activity CAC Title Staff Count
Michelle Catts, Acting Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Enclosure:
 
Calvert Cliffs Inspection Plan cc: Distribution via ListServ
RADIATION SAFETY - ALARA
 
1 1, 2 01/08/2018
 
01/12/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
UNIT 1 INSERVICE INSPECTION
 
1 1
02/26/2018
 
03/09/2018
 
IP 71111.08P
 
000702 Inservice Inspection Activities - PWR
 
RADIATION SAFETY - RAD HAZ
 
1 1, 2 02/26/2018
 
03/02/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 02/26/2018
 
03/02/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 02/26/2018
 
03/02/2018
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
RADIATION SAFETY - AIRBORNE
 
1 1, 2 04/23/2018
 
04/27/2018
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
CALVERT CLIFFS INITIAL OL EXAM
 
4 1, 2 07/09/2018
 
07/13/2018
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1, 2 08/06/2018
 
08/17/2018
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
 
EP PROGRAM INSPECTION
 
1 1, 2 08/13/2018
 
08/17/2018
 
IP 71114.02
 
000717 Alert and Notification System Testing
 
1, 2 08/13/2018
 
08/17/2018
 
IP 71114.03
 
000718 Emergency Preparedness Organization Staffing and Augmentation System
 
1, 2 08/13/2018
 
08/17/2018
 
IP 71114.05
 
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
 
1, 2 08/13/2018
 
08/17/2018
 
IP 71151 001397 Performance Indicator Verification
 
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
 
4 1, 2 09/10/2018
 
09/14/2018
 
IP 71130.02
 
000734 Access Control
 
1, 2 09/10/2018
 
09/14/2018
 
IP 71130.05
 
000737 Protective Strategy Evaluation
 
1, 2 09/10/2018


09/14/2018
ML18053A694 Non-Sensitive  Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP RI/DRP NAME A.Rosebrook M.Catts DATE 2/15/18 2/20/18


IP 71130.14
IP 22 Inspection Activity Plan Report Calvert Cliffs 01/01/2018 - 12/31/2019 Unit  Start  End  Activity CAC  Title  Staff Count RADIATION SAFETY - ALARA          1 1, 2 01/08/2018 01/12/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls UNIT 1 INSERVICE INSPECTION          1 1 02/26/2018 03/09/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RADIATION SAFETY - RAD HAZ          1 1, 2 02/26/2018 03/02/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/26/2018 03/02/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/26/2018 03/02/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation RADIATION SAFETY - AIRBORNE          1 1, 2 04/23/2018 04/27/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation CALVERT CLIFFS INITIAL OL EXAM          4 1, 2 07/09/2018 07/13/2018 OV  000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1, 2 08/06/2018 08/17/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
000743 Review of Power Reactor Target Sets
EP PROGRAM INSPECTION          1 1, 2 08/13/2018 08/17/2018 IP 71114.02 000717 Alert and Notification System Testing 1, 2 08/13/2018 08/17/2018 IP 71114.03 000718 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 08/13/2018 08/17/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 08/13/2018 08/17/2018 IP 71151 001397 Performance Indicator Verification ACCESS CONTROL, PROTECTIVE STRATEGY, TSR        4 1, 2 09/10/2018 09/14/2018 IP 71130.02 000734 Access Control 1, 2 09/10/2018 09/14/2018 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 09/10/2018 09/14/2018 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 09/10/2018 09/14/2018 IP 71151 001338 Performance Indicator Verification 1, 2 09/10/2018 09/14/2018 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations DESIGN BASES ASSURANCE INSPECTION (TEAM)         6 1, 2 09/17/2018 09/21/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
 
1, 2 10/01/2018 10/05/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 09/10/2018
This report does not include INPO and OUTAGE activities.      Page 1 of 3 This report shows only on-site and announced inspection procedures.
 
09/14/2018
 
IP 71151 001338 Performance Indicator Verification
 
1, 2 09/10/2018
 
09/14/2018
 
IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations
 
DESIGN BASES ASSURANCE INSPECTION (TEAM)
 
6 1, 2 09/17/2018
 
09/21/2018
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)
 
1, 2 10/01/2018
 
10/05/2018
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)


1/23/2018 9:36:56 AM
1/23/2018 9:36:56 AM


Page 1
IP 22 Inspection Activity Plan Report Calvert Cliffs 01/01/2018 - 12/31/2019 Unit Start End Activity CAC   Title   Staff Count RADIATION SAFETY - DOSIMETRY & PIV         1 1, 2 12/03/2018 12/07/2018 IP 71124.04 000729 Occupational Dose Assessment 1, 2 12/03/2018 12/07/2018 IP 71151 000746 Performance Indicator Verification RADIATION SAFETY - INSTRUMENTS         1 1, 2 01/14/2019 01/18/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation INSERVICE INSPECTION - UNIT 2         1 2 02/25/2019 03/08/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RADIATION SAFETY-RAD HAZ         1 1, 2 02/25/2019 03/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/25/2019 03/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/25/2019 03/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation RADWASTE           1 1, 2 04/01/2019 04/05/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation CYBER FULL IMP           2 1, 2 04/29/2019 05/03/2019 IP 71130.10P 000741 Cyber Security 1, 2 05/13/2019 05/17/2019 IP 71130.10P 000741 Cyber Security MC&A           1 1, 2 06/10/2019 06/14/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)
of 3
FORCE-ON-FORCE PLANNING AND EXERCISES         8 1, 2 06/24/2019 06/28/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 07/15/2019 07/19/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing ISFSI OPERATIONAL INSPECTION         2 1, 2 08/05/2019 08/09/2019 IP 60855 001001 Operation Of An ISFSI 1, 2 08/05/2019 08/09/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants ACCESS CONTROL, EQUIP PERF, TRAINING         3 1, 2 08/05/2019 08/09/2019 IP 71130.02 000734 Access Control 1, 2 08/05/2019 08/09/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance This report does not include INPO and OUTAGE activities.      Page 2 of 3 This report shows only on-site and announced inspection procedures.
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
 
Calvert Cliffs
 
01/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
RADIATION SAFETY - DOSIMETRY & PIV
 
1 1, 2 12/03/2018
 
12/07/2018
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
1, 2 12/03/2018
 
12/07/2018
 
IP 71151 000746 Performance Indicator Verification
 
RADIATION SAFETY - INSTRUMENTS
 
1 1, 2 01/14/2019
 
01/18/2019
 
IP 71124.05
 
000729 Radiation Monitoring Instrumentation
 
INSERVICE INSPECTION - UNIT 2
 
1 2
02/25/2019
 
03/08/2019
 
IP 71111.08P
 
000702 Inservice Inspection Activities - PWR
 
RADIATION SAFETY-RAD HAZ
 
1 1, 2 02/25/2019
 
03/01/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 02/25/2019
 
03/01/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 02/25/2019
 
03/01/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
RADWASTE 1
1, 2 04/01/2019
 
04/05/2019
 
IP 71124.08
 
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and  
 
Transportation
 
CYBER FULL IMP
 
2 1, 2 04/29/2019
 
05/03/2019
 
IP 71130.10P
 
000741 Cyber Security
 
1, 2 05/13/2019
 
05/17/2019
 
IP 71130.10P
 
000741 Cyber Security
 
MC&A 1
1, 2 06/10/2019
 
06/14/2019
 
IP 71130.11
 
000742 Material Control and Accounting (MC&A)
 
FORCE-ON-FORCE PLANNING AND EXERCISES
 
8 1, 2 06/24/2019
 
06/28/2019
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
1, 2 07/15/2019
 
07/19/2019
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
ISFSI OPERATIONAL INSPECTION
 
2 1, 2 08/05/2019
 
08/09/2019
 
IP 60855 001001 Operation Of An ISFSI
 
1, 2 08/05/2019
 
08/09/2019
 
IP 6085 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
 
ACCESS CONTROL, EQUIP PERF, TRAINING
 
3 1, 2 08/05/2019
 
08/09/2019
 
IP 71130.02
 
000734 Access Control
 
1, 2 08/05/2019
 
08/09/2019
 
IP 71130.04
 
000736 Equipment Performance, Testing, and Maintenance


1/23/2018 9:36:56 AM
1/23/2018 9:36:56 AM


Page 2
IP 22 Inspection Activity Plan Report Calvert Cliffs 01/01/2018 - 12/31/2019 Unit Start End Activity CAC   Title   Staff Count ACCESS CONTROL, EQUIP PERF, TRAINING         3 1, 2 08/05/2019 08/09/2019 IP 71130.07 000739 Security Training 1, 2 08/05/2019 08/09/2019 IP 71151 001338 Performance Indicator Verification RADIATION SAFETY - REMP         1 1, 2 08/19/2019 08/23/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program TRIENNIAL FIRE PROTECTION         4 1, 2 09/09/2019 09/13/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
of 3
1, 2 09/23/2019 09/27/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
EP EXERCISE INSPECTION         5 1, 2 09/16/2019 09/20/2019 IP 71114.01 000716 Exercise Evaluation 1, 2 09/16/2019 09/20/2019 IP 71151 001397 Performance Indicator Verification PI&R BIENNIAL           1 1, 2 10/21/2019 10/25/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 11/04/2019 11/08/2019 IP 71152B 000747 Problem Identification and Resolution CC REQUAL INSP W/ P/F RESULTS         2 1, 2 11/18/2019 11/22/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -
 
Annual 1, 2 11/18/2019 11/22/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Calvert Cliffs
Biennial Radiation Safety - RETS & PIV         1 1, 2 11/18/2019 11/22/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/18/2019 11/22/2019 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities.      Page 3 of 3 This report shows only on-site and announced inspection procedures.
 
01/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
ACCESS CONTROL, EQUIP PERF, TRAINING
 
3 1, 2 08/05/2019
 
08/09/2019
 
IP 71130.07
 
000739 Security Training
 
1, 2 08/05/2019
 
08/09/2019
 
IP 71151 001338 Performance Indicator Verification
 
RADIATION SAFETY - REMP
 
1 1, 2 08/19/2019
 
08/23/2019
 
IP 71124.07
 
000731 Radiological Environmental Monitoring Program
 
TRIENNIAL FIRE PROTECTION
 
4 1, 2 09/09/2019
 
09/13/2019
 
IP 71111.05XT
 
000697 Fire Protection - NFPA 805 (Triennial)
 
1, 2 09/23/2019
 
09/27/2019
 
IP 71111.05XT
 
000697 Fire Protection - NFPA 805 (Triennial)
 
EP EXERCISE INSPECTION
 
5 1, 2 09/16/2019
 
09/20/2019
 
IP 71114.01
 
000716 Exercise Evaluation
 
1, 2 09/16/2019
 
09/20/2019
 
IP 71151 001397 Performance Indicator Verification
 
PI&R BIENNIAL
 
1 1, 2 10/21/2019
 
10/25/2019
 
IP 71152B 000747 Problem Identification and Resolution
 
1, 2 11/04/2019
 
11/08/2019
 
IP 71152B 000747 Problem Identification and Resolution
 
CC REQUAL INSP W/ P/F RESULTS
 
2 1, 2 11/18/2019
 
11/22/2019
 
IP 71111.11A
 
000703 Licensed Operator Requalification Program and Licensed Operator Performance -  
 
Annual 1, 2 11/18/2019
 
11/22/2019
 
IP 71111.11B
 
000704 Licensed Operator Requalification Program and Licensed Operator Performance -  
 
Biennial Radiation Safety - RETS & PIV
 
1 1, 2 11/18/2019
 
11/22/2019
 
IP 71124.06
 
000730 Radioactive Gaseous and Liquid Effluent Treatment
 
1, 2 11/18/2019
 
11/22/2019
 
IP 71151 000746 Performance Indicator Verification


1/23/2018 9:36:56 AM
1/23/2018 9:36:56 AM
Page 3
of 3
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
}}
}}

Latest revision as of 20:12, 21 October 2019

Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2017006 and 05000318/2017006, Report 05000317/2017402 and 05000318/2017402, Report 05000317/2017501 and 05000318/2017501)
ML18053A694
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/28/2018
From: Michelle Catts
NRC Region 1
To: Bryan Hanson
Exelon Nuclear, Exelon Nuclear Generation Corp
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18053A694 (6)


Text

ebruary 28, 2018

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2017006 AND 05000318/2017006, REPORT 05000317/2017402 AND 05000318/2017402, REPORT 05000317/2017501 AND 05000318/2017501)

Dear Mr. Hanson:

The NRC has completed its end-of-cycle performance assessment of Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Calvert Cliffs during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green.) Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to normal baseline inspections, the NRC will be performing Inspection Procedure (IP) 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations (ISFSI), and IP 60855.1, Operation of an ISFSI at Operating Plants, at your facility.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5012 with any questions you have regarding this letter.

Sincerely,

/RA/

Michelle Catts, Acting Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Enclosure:

Calvert Cliffs Inspection Plan cc: Distribution via ListServ

ML18053A694 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME A.Rosebrook M.Catts DATE 2/15/18 2/20/18

IP 22 Inspection Activity Plan Report Calvert Cliffs 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RADIATION SAFETY - ALARA 1 1, 2 01/08/2018 01/12/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls UNIT 1 INSERVICE INSPECTION 1 1 02/26/2018 03/09/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RADIATION SAFETY - RAD HAZ 1 1, 2 02/26/2018 03/02/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/26/2018 03/02/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/26/2018 03/02/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation RADIATION SAFETY - AIRBORNE 1 1, 2 04/23/2018 04/27/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation CALVERT CLIFFS INITIAL OL EXAM 4 1, 2 07/09/2018 07/13/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 08/06/2018 08/17/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP PROGRAM INSPECTION 1 1, 2 08/13/2018 08/17/2018 IP 71114.02 000717 Alert and Notification System Testing 1, 2 08/13/2018 08/17/2018 IP 71114.03 000718 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 08/13/2018 08/17/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 08/13/2018 08/17/2018 IP 71151 001397 Performance Indicator Verification ACCESS CONTROL, PROTECTIVE STRATEGY, TSR 4 1, 2 09/10/2018 09/14/2018 IP 71130.02 000734 Access Control 1, 2 09/10/2018 09/14/2018 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 09/10/2018 09/14/2018 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 09/10/2018 09/14/2018 IP 71151 001338 Performance Indicator Verification 1, 2 09/10/2018 09/14/2018 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2 09/17/2018 09/21/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1, 2 10/01/2018 10/05/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

1/23/2018 9:36:56 AM

IP 22 Inspection Activity Plan Report Calvert Cliffs 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RADIATION SAFETY - DOSIMETRY & PIV 1 1, 2 12/03/2018 12/07/2018 IP 71124.04 000729 Occupational Dose Assessment 1, 2 12/03/2018 12/07/2018 IP 71151 000746 Performance Indicator Verification RADIATION SAFETY - INSTRUMENTS 1 1, 2 01/14/2019 01/18/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation INSERVICE INSPECTION - UNIT 2 1 2 02/25/2019 03/08/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RADIATION SAFETY-RAD HAZ 1 1, 2 02/25/2019 03/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/25/2019 03/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/25/2019 03/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation RADWASTE 1 1, 2 04/01/2019 04/05/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation CYBER FULL IMP 2 1, 2 04/29/2019 05/03/2019 IP 71130.10P 000741 Cyber Security 1, 2 05/13/2019 05/17/2019 IP 71130.10P 000741 Cyber Security MC&A 1 1, 2 06/10/2019 06/14/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)

FORCE-ON-FORCE PLANNING AND EXERCISES 8 1, 2 06/24/2019 06/28/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 07/15/2019 07/19/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing ISFSI OPERATIONAL INSPECTION 2 1, 2 08/05/2019 08/09/2019 IP 60855 001001 Operation Of An ISFSI 1, 2 08/05/2019 08/09/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants ACCESS CONTROL, EQUIP PERF, TRAINING 3 1, 2 08/05/2019 08/09/2019 IP 71130.02 000734 Access Control 1, 2 08/05/2019 08/09/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

1/23/2018 9:36:56 AM

IP 22 Inspection Activity Plan Report Calvert Cliffs 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count ACCESS CONTROL, EQUIP PERF, TRAINING 3 1, 2 08/05/2019 08/09/2019 IP 71130.07 000739 Security Training 1, 2 08/05/2019 08/09/2019 IP 71151 001338 Performance Indicator Verification RADIATION SAFETY - REMP 1 1, 2 08/19/2019 08/23/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program TRIENNIAL FIRE PROTECTION 4 1, 2 09/09/2019 09/13/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

1, 2 09/23/2019 09/27/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

EP EXERCISE INSPECTION 5 1, 2 09/16/2019 09/20/2019 IP 71114.01 000716 Exercise Evaluation 1, 2 09/16/2019 09/20/2019 IP 71151 001397 Performance Indicator Verification PI&R BIENNIAL 1 1, 2 10/21/2019 10/25/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 11/04/2019 11/08/2019 IP 71152B 000747 Problem Identification and Resolution CC REQUAL INSP W/ P/F RESULTS 2 1, 2 11/18/2019 11/22/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 1, 2 11/18/2019 11/22/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial Radiation Safety - RETS & PIV 1 1, 2 11/18/2019 11/22/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/18/2019 11/22/2019 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

1/23/2018 9:36:56 AM