ML18115A156: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML18115A156 | | number = ML18115A156 | ||
| issue date = 04/25/2018 | | issue date = 04/25/2018 | ||
| title = Summary of April 2, 2018, Public Meeting with | | title = Summary of April 2, 2018, Public Meeting with NuScale on 3.7 and 3.8 RAIs Closure Plan | ||
| author name = Tabatabai O | | author name = Tabatabai O | ||
| author affiliation = NRC/NRO/DNRL/LB1 | | author affiliation = NRC/NRO/DNRL/LB1 | ||
Line 30: | Line 30: | ||
: 3. Attendees CONTACT: Omid Tabatabai, NRO/DNRL 301-415-6616 | : 3. Attendees CONTACT: Omid Tabatabai, NRO/DNRL 301-415-6616 | ||
ML18115A156 *via email NRC-001 OFFICE NRO/DNRL/LB1: PM NRO/DNRL/LB1: LA NRO/DEI/SEB: BC* NRO/DNRL/LB1: PM NAME OTabatabai MMoore SSamadar OTabatabai DATE 4/25/2018 04/25/2018 4/25/2018 4/25/2018 | ML18115A156 *via email NRC-001 OFFICE NRO/DNRL/LB1: PM NRO/DNRL/LB1: LA NRO/DEI/SEB: BC* NRO/DNRL/LB1: PM NAME OTabatabai MMoore SSamadar OTabatabai DATE 4/25/2018 04/25/2018 4/25/2018 4/25/2018 U.S. NUCLEAR REGULATORY COMMISSION | ||
U.S. NUCLEAR REGULATORY COMMISSION | |||
==SUMMARY== | ==SUMMARY== |
Latest revision as of 03:03, 3 February 2020
ML18115A156 | |
Person / Time | |
---|---|
Site: | NuScale |
Issue date: | 04/25/2018 |
From: | Omid Tabatabai NRC/NRO/DNRL/LB1 |
To: | Samson Lee NRC/NRO/DNRL/LB1 |
Tabatabai O | |
References | |
Download: ML18115A156 (6) | |
Text
April 25, 2018 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors FROM: Omid Tabatabai, Senior Project Manager /RA/
Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors
SUBJECT:
SUMMARY
OF THE APRIL 2, 2018, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS NUSCALE'S PLANS TO RESPOND TO THE U.S. NUCLEAR REGULATORY COMMISSION STAFFS REQUEST FOR ADDITIONAL INFORMATION REGARDING ITS DESIGN CERTIFICATION APPLICATION, TIER 2, SECTIONS 3.7, "SEISMIC DESIGN,"
AND 3.8, "DESIGN OF CATEGORY I STRUCTURES" On April 2, 2018, representatives of the U.S. Nuclear Regulatory Commission (NRC) and NuScale Power, LLC (NuScale) held a public teleconference meeting to discuss NuScale's plans to respond to the NRC staffs request for additional information (RAI) regarding its design certification application, Tier 2, Sections 3.7, "Seismic Design," and 3.8, "Design of Category I Structures," information. NuScales RAI response schedule is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18090A003. captures the summary of the topics discussed during the teleconference. The agenda and list of meeting attendees are included in Enclosures 2 and 3, respectively. The meeting notice for this meeting is available in ADAMS under Accession No. ML18078A783.
Docket No.52-048
Enclosures:
- 1. Meeting Summary
- 2. Agenda
- 3. Attendees CONTACT: Omid Tabatabai, NRO/DNRL 301-415-6616
ML18115A156 *via email NRC-001 OFFICE NRO/DNRL/LB1: PM NRO/DNRL/LB1: LA NRO/DEI/SEB: BC* NRO/DNRL/LB1: PM NAME OTabatabai MMoore SSamadar OTabatabai DATE 4/25/2018 04/25/2018 4/25/2018 4/25/2018 U.S. NUCLEAR REGULATORY COMMISSION
SUMMARY
OF THE APRIL 2, 2018, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS NUSCALE'S PLANS TO RESPOND TO THE STAFFS REQUESTS FOR ADDITIONAL INFORMATION REGARDING SECTIONS 3.7, "SEISMIC DESIGN," AND 3.8, "DESIGN OF CATEGORY I STRUCTURES" The purpose of this public meeting was for NuScale Power, LLC (NuScale) to discuss and describe its plans and provide a schedule to respond to the NRC staffs request for additional information (RAI) regarding its design certification application (DCA), Tier 2, Sections 3.7, "Seismic Design," and 3.8, "Design of Category I Structures," information. NuScales RAI response schedule, with the NRC staffs feedback, is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18090A003.
NuScales plan and schedule provided a better understanding of the specific issues and actions that are needed to be taken to address the NRC staffs concerns. During the public meeting, NuScale and the NRC staff discussed all the elements in the closure plan. Specifcally, the participants discussed the NRC staffs comments on the proposed plan by NuScale to ensure the issues will be resolved in accordance with the schedule established in the plan. NuScale agreed to incorporate all the comments and feedback that the NRC staff provided on the proposed closure plan, and submit a revised version of the closure plan accordingly. Some of the specific actions items that were captured and agreed during the meeting are listed below:
- NuScale agreed to provide the demand/capacity ratios for the dry dock gate to confirm NuScales assumption that the gates will not fail.
- There is a possibility that NuScales closure plan for the Bio-shield (i.e. plan addressing the Sections 3.7, "Seismic Design," and 3.8, "Design Of Category I Structures,"
questions as well as Bio-shield questions for other FSAR Sections) will be included in the closure plan for Sections 3.7 and 3.8, but the option to keep a separate plan for the Bio-shield is also being considered.
- The NRC staff noted that the closure plan in response to RAI 03.08.04-1 did not include the actions planned for providing the design information for the Reactor Flange Tool (RFT) and the Containment Flange Tool (CFT) and the plan for developing the seismic input motion for the upper core plate elevations when the Reactor Pressure Vessel (RPV) is placed on the RFT. NuScale will include the actions planned for addressing this issue in the updated plan.
- The planned actions for addressing the RAI 03.08.02-14 regarding performing the Type B test for the trip and reset valve was included in the structural closure plan. The NRC staff identified some inconsistency regarding the test pressure. For RAI 9315, question 3.8.2-14, closure plan Item No. 9, NuScale commits to Appendix J, Type B tests for the RVV and RRV test and reset valve flanges to peak accident pressure, Pa. However, in NuScales DCA, Tier 2, Section 6.2.6.2, Containment Penetration Leakage Rate Test, and in NuScale TR-1116-51962-NP, NuScale Containment Vessel Integrity Assurance, NuScale commits to Type B tests for these test and reset valve flanges to RCS design pressure. The NRC staff requested NuScale to address the discrepancy and to inform 2
us of the Type B test pressure they propose to test the reset and test valve flanges.
NuScale committed to respond formally.
The NRC staff and NuScale agreed to hold a follow up meeting in May 2018 to discuss NuScales revised final closure plan before it is formally submitted for docketing.
U.S. NUCLEAR REGULATORY COMMISSION
SUMMARY
OF THE APRIL 2, 2018, TELECONFERENCE WITH NUSCALE POWER, LLC MEETING AGENDA Time Topic Lead 1:00 - 1:10 pm Meeting Introductions NRC/NuScale 1:10 - 2:30 pm Discussion of NuScale Closure Plan NRC/NuScale 2:30 - 2:35 pm Public Comments/Questions Public 2:35 - 2:40 pm Meeting Conclusion NRC/NuScale Enclosure 2
U.S. NUCLEAR REGULATORY COMMISSION
SUMMARY
OF THE APRIL 2, 2018, TELECONFERENCE WITH NUSCALE POWER, LLC LIST OF ATTENDEES NuScale Power, LLC Jeremy Aartun Kirsten McKay Tom Ryan Mohsin Khan (ARES)
Josh Parker Evren Ulku Marty Bryan Mohsen Azadbakht Nicholas Brown Guilio Flores Kyra Perkins Andre LEplattenier Ed Heald U.S. Nuclear Regulatory Commission Staff Omid Tabatabai Clint Ashley Anne-Marie Grady Manas Chakravorty Robert Roche Pravin Patel Jason Huang Ata Istar Sunwoo Park Greg Cranston Samuel Lee Other Attendees Sarah Fields (Uranium Watch)
Enclosure 3