ML063530276: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML063530276
| number = ML063530276
| issue date = 12/21/2006
| issue date = 12/21/2006
| title = 12/06/2006 Summary of Public Meeting with VEPCO Re Licensee Plan to Submit a License Amendment for Chilled Water Piping Replacement. (TAC Nos. MD2501 and MD2502)
| title = Summary of Public Meeting with VEPCO Re Licensee Plan to Submit a License Amendment for Chilled Water Piping Replacement.
| author name = Lingam S
| author name = Lingam S
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:December 21, 2006LICENSEE:Virginia Electric and Power Company (VEPCO)
{{#Wiki_filter:December 21, 2006 LICENSEE:       Virginia Electric and Power Company (VEPCO)
FACILITY:Surry Power Station, Unit Nos. 1 and 2
FACILITY:       Surry Power Station, Unit Nos. 1 and 2


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF DECEMBER 6, 2006, PUBLIC MEETING WITH VEPCO, ON ITSPLAN TO SUBMIT A LICENSE AMENDMENT APPLICATION FOR CHILLED WATER PIPING REPLACEMENT (TAC NOS. MD2501 AND MD2502)On December 6, 2006, a Category 1 public meeting was held between the Nuclear RegulatoryCommission (NRC) and representatives of VEPCO at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss VEPCO's plans to submit for NRC staff approval a chilled water piping replacement in the main control room (MCR) and the emergency switchgear room (ESGR) air-conditioning system with four 45-day allowable outage time (AOT) entries over a 24-month period. A list of attendees is provided as Enclosure 1. VEPCO presented its purpose and plans to replace chilled water piping in the MCR and theESGR air-conditioning system with four 45-day AOT entries over a 24-month period. The concluding remarks provided by VEPCO discussed the chilled water piping replacement, fourtemporary 45-day AOT entries without shutting both units and the associated Technical Specification (TS) changes supported by risk analysis, operational restrictions and compensatory actions that will be in place during chilled water piping replacement, and a quick turnaround of the license amendment approval from NRC. During discussion, the NRC staff had concerns regarding TS changes and risk analysis. The licensee's presentation handout is listed as Enclosure 2 and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML063470432.The licensee plans to submit the license amendment application for NRC staff review by theend of December 2006. For this submittal date, the NRC stated that its review can be expedited if additional information requests are not required, and if all NRC concerns have been addressed satisfactorily before submitting the application. The normal NRC target date for issuing its approval after reviewing the license amendment is 1 year from the date of the application.CONTACT: Siva P. Lingam         301-415-1564 NRR/DORL VEPCO- 2 -Members of the public were not in attendance. Public Meeting Feedback forms were notreceived. Please direct any inquiries to me at 301-415-1564, or SPL@nrc.gov. Siva P. Lingam, Project Manager       /RA/ Plant Licensing Branch II-1Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-280 and 50-281
OF DECEMBER 6, 2006, PUBLIC MEETING WITH VEPCO, ON ITS PLAN TO SUBMIT A LICENSE AMENDMENT APPLICATION FOR CHILLED WATER PIPING REPLACEMENT (TAC NOS. MD2501 AND MD2502)
On December 6, 2006, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of VEPCO at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss VEPCOs plans to submit for NRC staff approval a chilled water piping replacement in the main control room (MCR) and the emergency switchgear room (ESGR) air-conditioning system with four 45-day allowable outage time (AOT) entries over a 24-month period. A list of attendees is provided as Enclosure 1.
VEPCO presented its purpose and plans to replace chilled water piping in the MCR and the ESGR air-conditioning system with four 45-day AOT entries over a 24-month period. The concluding remarks provided by VEPCO discussed the chilled water piping replacement, four temporary 45-day AOT entries without shutting both units and the associated Technical Specification (TS) changes supported by risk analysis, operational restrictions and compensatory actions that will be in place during chilled water piping replacement, and a quick turnaround of the license amendment approval from NRC. During discussion, the NRC staff had concerns regarding TS changes and risk analysis. The licensees presentation handout is listed as Enclosure 2 and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML063470432.
The licensee plans to submit the license amendment application for NRC staff review by the end of December 2006. For this submittal date, the NRC stated that its review can be expedited if additional information requests are not required, and if all NRC concerns have been addressed satisfactorily before submitting the application. The normal NRC target date for issuing its approval after reviewing the license amendment is 1 year from the date of the application.
CONTACT: Siva P. Lingam 301-415-1564 NRR/DORL
 
VEPCO                                         Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1564, or SPL@nrc.gov.
Siva P. Lingam, Project Manager     /RA/
Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Licensee's Handout (ADAMS ML063470432)cc w/encls: See next page VEPCO-2-December 21, 2006Members of the public were not in attendance. Public Meeting Feedback forms were notreceived. Please direct any inquiries to me at 301-415-1564, or SPL@nrc.gov. Siva P. Lingam, Project Manager      /RA/ Plant Licensing Branch II-1Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-280 and 50-281
: 2. Licensees Handout (ADAMS ML063470432) cc w/encls: See next page
 
VEPCO                                                                                 December 21, 2006 Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1564, or SPL@nrc.gov.
Siva P. Lingam, Project Manager      /RA/
Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Licensee's Handout (ADAMS ML063470432)cc w/encls: See next page DISTRIBUTION
: 2. Licensees Handout (ADAMS ML063470432) cc w/encls: See next page DISTRIBUTION:
:PublicRidsOgcRpRidsNrrDirsItsb(PHearn)
Public                                RidsOgcRp                    RidsNrrDirsItsb(PHearn)
LPL 2-1 r/fRidsAcrsAcnwMailCenterRidsNrrDssScvb(EForrest)
LPL 2-1 r/f                          RidsAcrsAcnwMailCenter      RidsNrrDssScvb(EForrest)
RidsNrrDorlLpl2-1(EMarinos)RidsNrrDeEeeb(APal)RidsNrrDraAplb(CDoutt)
RidsNrrDorlLpl2-1(EMarinos)           RidsNrrDeEeeb(APal)         RidsNrrDraAplb(CDoutt)
RidsNrrPMSLingamRidsNrrDirsItsb(RGrover)RidsNrrDssScvb(DNold)
RidsNrrPMSLingam                      RidsNrrDirsItsb(RGrover)     RidsNrrDssScvb(DNold)
RidsNrrLAMO'BrienRidsNrrDirsItsb(TKobetz)RJasinski, NRR RidsRgn2MailCenter(EGuthrie)SLee, EDO, RGN IIPackage No. ML063530299Enclosure 2: ML063470432ADAMS Accession No. ML063530276           NRC-001      Office NRR/LPL2-1/PMNRR/LPL2-1/LANRR/LPL2-1/BCNameSLingamMO'BrienEMarinos Date   12/18/06   12/21/0612/21/06OFFICAL RECORD ONLY Enclosure 1List of AttendeesNuclear Regulatory Commission (NRC) Public MeetingWith Virginia Electric and Power Company (VEPCO)Main Control Room and Emergency Switchgear Room Air-Conditioning System ModificationsDecember 6, 2006Matt AdamsVEPCOWilliam W. ChaissonVEPCO Barry A. GarberVEPCO Thomas G. HookVEPCO Gary D. MillerVEPCO Roger RileyVEPCO Bernard SloanVEPCO Dave A. SommersVEPCO Cliff DouttNRC Ed ForrestNRC Ravi GroverNRC Pete HearnNRC Siva P. LingamNRC E. C. MarinosNRC David NoldNRC Amar PalNRC  Licensee's  Handout for December 6, 2006, Public MeetingMain Control Room and Emergency Switchgear Room Air-Conditioning System Modifications With Virginia Electric and Power Company (VEPCO) (Agencywide Documents Access and Management System Accession No. ML063470432)
RidsNrrLAMOBrien                    RidsNrrDirsItsb(TKobetz)     RJasinski, NRR RidsRgn2MailCenter(EGuthrie)         SLee, EDO, RGN II Package No. ML063530299                                    Enclosure 2: ML063470432 ADAMS Accession No. ML063530276                             NRC-001 Office       NRR/LPL2-1/PM        NRR/LPL2-1/LA          NRR/LPL2-1/BC Name        SLingam              MOBrien                EMarinos Date           12/18/06             12/21/06              12/21/06 OFFICAL RECORD ONLY
 
List of Attendees Nuclear Regulatory Commission (NRC) Public Meeting With Virginia Electric and Power Company (VEPCO)
Main Control Room and Emergency Switchgear Room Air-Conditioning System Modifications December 6, 2006 Matt Adams                          VEPCO William W. Chaisson                VEPCO Barry A. Garber                    VEPCO Thomas G. Hook                      VEPCO Gary D. Miller                      VEPCO Roger Riley                        VEPCO Bernard Sloan                      VEPCO Dave A. Sommers                    VEPCO Cliff Doutt                        NRC Ed Forrest                          NRC Ravi Grover                        NRC Pete Hearn                          NRC Siva P. Lingam                      NRC E. C. Marinos                      NRC David Nold                          NRC Amar Pal                            NRC Enclosure 1
 
Licensees Handout for December 6, 2006, Public Meeting Main Control Room and Emergency Switchgear Room Air-Conditioning System Modifications With Virginia Electric and Power Company (VEPCO)
(Agencywide Documents Access and Management System Accession No. ML063470432)
Enclosure 2
 
Surry Power Station, Units 1 & 2 cc:
Surry Power Station, Units 1 & 2 cc:
Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Virginia Electrical and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711Ms. Lillian M. Cuoco, Esq.Senior Counsel Dominion Resources Services, Inc.
Mr. David A. Christian                    Office of the Attorney General Senior Vice President                     Commonwealth of Virginia and Chief Nuclear Officer               900 East Main Street Virginia Electrical and Power Company     Richmond, Virginia 23219 Innsbrook Technical Center 5000 Dominion Boulevard                   Mr. Chris L. Funderburk, Director Glen Allen, VA 23060-6711                Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
Building 475, 5th Floor Rope Ferry Road Waterford, Connecticut 06385Mr. Donald E. JerniganSite Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315Senior Resident InspectorSurry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883ChairmanBoard of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683Dr. W. T. LoughVirginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218Dr. Robert B. Stroube, MD, MPHState Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218Office of the Attorney GeneralCommonwealth of Virginia 900 East Main Street Richmond, Virginia  23219Mr. Chris L. Funderburk, DirectorNuclear Licensing & Operations Support Dominion Resources Services, Inc.
Ms. Lillian M. Cuoco, Esq.               Innsbrook Technical Center Senior Counsel                           5000 Dominion Blvd.
Innsbrook Technical Center 5000 Dominion Blvd.
Dominion Resources Services, Inc.         Glen Allen, Virginia 23060-6711 Building 475, 5th Floor Rope Ferry Road Waterford, Connecticut 06385 Mr. Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Dr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218}}
Glen Allen, Virginia  23060-6711}}

Latest revision as of 22:29, 22 March 2020

Summary of Public Meeting with VEPCO Re Licensee Plan to Submit a License Amendment for Chilled Water Piping Replacement.
ML063530276
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/21/2006
From: Siva Lingam
NRC/NRR/ADRO/DORL/LPLII-1
To:
Lingam, Siva NRR/DORL 415-1564
Shared Package
ML063530299 List:
References
TAC MD2501, TAC MD2502
Download: ML063530276 (6)


Text

December 21, 2006 LICENSEE: Virginia Electric and Power Company (VEPCO)

FACILITY: Surry Power Station, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF DECEMBER 6, 2006, PUBLIC MEETING WITH VEPCO, ON ITS PLAN TO SUBMIT A LICENSE AMENDMENT APPLICATION FOR CHILLED WATER PIPING REPLACEMENT (TAC NOS. MD2501 AND MD2502)

On December 6, 2006, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of VEPCO at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss VEPCOs plans to submit for NRC staff approval a chilled water piping replacement in the main control room (MCR) and the emergency switchgear room (ESGR) air-conditioning system with four 45-day allowable outage time (AOT) entries over a 24-month period. A list of attendees is provided as Enclosure 1.

VEPCO presented its purpose and plans to replace chilled water piping in the MCR and the ESGR air-conditioning system with four 45-day AOT entries over a 24-month period. The concluding remarks provided by VEPCO discussed the chilled water piping replacement, four temporary 45-day AOT entries without shutting both units and the associated Technical Specification (TS) changes supported by risk analysis, operational restrictions and compensatory actions that will be in place during chilled water piping replacement, and a quick turnaround of the license amendment approval from NRC. During discussion, the NRC staff had concerns regarding TS changes and risk analysis. The licensees presentation handout is listed as Enclosure 2 and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML063470432.

The licensee plans to submit the license amendment application for NRC staff review by the end of December 2006. For this submittal date, the NRC stated that its review can be expedited if additional information requests are not required, and if all NRC concerns have been addressed satisfactorily before submitting the application. The normal NRC target date for issuing its approval after reviewing the license amendment is 1 year from the date of the application.

CONTACT: Siva P. Lingam 301-415-1564 NRR/DORL

VEPCO Members of the public were not in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1564, or SPL@nrc.gov.

Siva P. Lingam, Project Manager /RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosures:

1. List of Attendees
2. Licensees Handout (ADAMS ML063470432) cc w/encls: See next page

VEPCO December 21, 2006 Members of the public were not in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1564, or SPL@nrc.gov.

Siva P. Lingam, Project Manager /RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosures:

1. List of Attendees
2. Licensees Handout (ADAMS ML063470432) cc w/encls: See next page DISTRIBUTION:

Public RidsOgcRp RidsNrrDirsItsb(PHearn)

LPL 2-1 r/f RidsAcrsAcnwMailCenter RidsNrrDssScvb(EForrest)

RidsNrrDorlLpl2-1(EMarinos) RidsNrrDeEeeb(APal) RidsNrrDraAplb(CDoutt)

RidsNrrPMSLingam RidsNrrDirsItsb(RGrover) RidsNrrDssScvb(DNold)

RidsNrrLAMOBrien RidsNrrDirsItsb(TKobetz) RJasinski, NRR RidsRgn2MailCenter(EGuthrie) SLee, EDO, RGN II Package No. ML063530299 Enclosure 2: ML063470432 ADAMS Accession No. ML063530276 NRC-001 Office NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC Name SLingam MOBrien EMarinos Date 12/18/06 12/21/06 12/21/06 OFFICAL RECORD ONLY

List of Attendees Nuclear Regulatory Commission (NRC) Public Meeting With Virginia Electric and Power Company (VEPCO)

Main Control Room and Emergency Switchgear Room Air-Conditioning System Modifications December 6, 2006 Matt Adams VEPCO William W. Chaisson VEPCO Barry A. Garber VEPCO Thomas G. Hook VEPCO Gary D. Miller VEPCO Roger Riley VEPCO Bernard Sloan VEPCO Dave A. Sommers VEPCO Cliff Doutt NRC Ed Forrest NRC Ravi Grover NRC Pete Hearn NRC Siva P. Lingam NRC E. C. Marinos NRC David Nold NRC Amar Pal NRC Enclosure 1

Licensees Handout for December 6, 2006, Public Meeting Main Control Room and Emergency Switchgear Room Air-Conditioning System Modifications With Virginia Electric and Power Company (VEPCO)

(Agencywide Documents Access and Management System Accession No. ML063470432)

Enclosure 2

Surry Power Station, Units 1 & 2 cc:

Mr. David A. Christian Office of the Attorney General Senior Vice President Commonwealth of Virginia and Chief Nuclear Officer 900 East Main Street Virginia Electrical and Power Company Richmond, Virginia 23219 Innsbrook Technical Center 5000 Dominion Boulevard Mr. Chris L. Funderburk, Director Glen Allen, VA 23060-6711 Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

Ms. Lillian M. Cuoco, Esq. Innsbrook Technical Center Senior Counsel 5000 Dominion Blvd.

Dominion Resources Services, Inc. Glen Allen, Virginia 23060-6711 Building 475, 5th Floor Rope Ferry Road Waterford, Connecticut 06385 Mr. Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Dr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218